- - - - _ - - _ _. _
[d' [,M enMI
[
j(
UNITED STATES g
NUCLEAR REGUL ATORY COMMISSION 3
4 E WASHING TON, D. C. 20555 f*
o,
%,,j,+*
JUL 08 1990 Docket Nos. 50-317 and 50-318 LICENSEE:
Baltimore Gas an'd Electric Company (BG&E)
FACILITY:
Calvert Cliffs Nuclear Power Pl;nt, Units No.1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD ON JUNE 18, 1989 TO DISCUSS THE STRUCTURE DESIGN OF THE SPENT FUEL P00L MODIFICATION OF THE CALVERT CLIFFS UNITS NO.1 AND 2 The meeting had been requested by BG&E to discuss the structure design of the Calvert Cliffs spent fuel pool. Representatives from BG&E, Nuclear Energy Service, Incorporated (NES), Bechtel Power Ccrporation, and the NRC staff were in attendance. A list of attendees is given in Enclosure 1.
After introductions and oper.ing remarks by the NRC (Conner), Enclosure 2 was given to the NRC staff for reference in the safety evaluation.
In this reference, an analysis of " Accident Fuel Assembly Drop" was presented; however, it only considered the drop an top of the racks without including the drop directly on the liner plate. The NRC staff (Hafiz) believes that a drop on the liner plate would be more serious than a drop on the racks.
BG&E (Ash) replied that dropping on the liner plate was analyzed and the issue was closed many years ago. The current modification only affected the racks rather than the liner plate. BG&E did not consider that a fuel drop on the liner plate was a part of this application.
NES (Husain) made a presentation of their analysis of a fuel drop on the racks (Enclosure 2).
Three cases were considered:
(1 ) Straight drop on top of rack,
(2) Subsequent topping analysis,
(3) Drop through storage cell and impact at storage cell, and base plate location.
The analysis shows that there will be no plastic deformation of the concrete under the rack support feet / liner plate and the load will be transmitted by direct compressicn of the liner plate. Furthermore, there will not be any plastic deformation of the liner plate and the leak tight integrity of the fuel pool liner plate will be maintained.
80 0723 0 /D f
A_
In summary, the NRC staff agrees that the fuel assembly drop on the rack does not pose any safety problem. However, clarification of the BG&E responses to NRC questions is needed to complete our review. BG&E agreed to provide docu-mentation of these clarifications.
f' e
at C. Y.
i, Project Manager Operating Reactors Branch #3 Division of Licensing
Enclosures:
1.
Attendance List 2.
NES Analysis Sheets cc w/ enclosure 1 only:
See next 2 pages I
a F*
l
1 MEETING SU!'l'ARY DISTRIBUTION Licensee:
Baltimore Gas & Electric Company
- Copies also sent to those people on service (cc) list fo.r subject plant (s).
Distribution w/ enclosure 1:
Docket File
. NRC PDR L PDR TERA NSIC ORB Rda.
NRR Rdg HDenton ECase DEisenhut RPurple RTedesco TNovak Glainas RReid TIppolito SVarga DCrutchfield RAClark ORB Project Manager - C. Li Licensing Assistant OELD AE00 - JHeltemes IE-3 SShowe (PWR) or CThayer (BWR), IE RFraley, ACRS (16)
Program Support Franch GZech J01shinski NRC. Participants E. Conner A. Hafiz C. Li
-o
. ~.
Baltimore Gas and ElGetric Company cc:
James A. Biddison, Jr.
Mr. Bernard Fowler General Counsel President, Board of County G and E Building Commissioners Charles Center Prince Frederick, Maryland 20768 Baltimore, Maryland 21203 Director, Technical Assessment George F. Trowbridge, Esquire Division Shaw, Pittman, Potts and Office of Radiation Programs Trowbridge (AW-459) 1800 M Street, N.W.
U. S. Environmental Protection Agency Washington, D. C.
20036 Crystal Mall #2 Arlington, Virginia 20460 Mr. R. C. L. Olson Baltimore Gas and Electric Company U. S. Environmental Protection Agency Room 922 - G and E Building Region III Office Post Office Box 1475 ATTN:
EIS COORDINATOR Baltimore, Maryland 21203 Curtis Building (Sixth Floor)
Sixth and Walnut Streets Mr. Leon B. Russell, Chief Engineer Philadelphia, Pennsylvania 19106 Calvert Cliffs Nuclear Power Plant Baltimore Gas and Electric Company Ralph E. Architzel Lusby, Maryland 20657 Resident Reactor Inspector NRC Inspection and Enforcement Bechtel Power Corporation P. O. Box 437 ATTH:
Mr. J. C. Judd Lusby, Maryland 20657 Chief Nuclear Engineer 15740 Shady Grove Road Mr. Charles B. Brinkman Gaithersburg, Maryland 20760 Manager - Washington Nuclear Operations Combustion Engineering, Inc.
C-E Power Systems ATTN: Mr. P. W. Kruse, Manager Combustion Engineering, Inc.
Engineering Services 4853 Cordell Ave., Suite A-1 Post Office Box 500 Bethesda, Maryland 20014 Windsor, Connecticut 06095 Calvert County Library Prince Frederick, Maryland 20678 Director, Department of State Planning 301 West Preston Street Baltimore, Maryland 21201 Mr. R. M. Douglass, Manager Quality Assurance Department Administrator, Pcwer Plant Siting Program Room 923 Gas & Electric Building Energy and Coastal Zone Administration P. O. Box 1475 Department of Natural Resources Baltimore, Maryland 21203 Tawes State Office Building Annapolis, Maryland 21204
__y.
i CALVERT CLIFFS SPENT FUEL POOL MODIFICATION METING JUNE 6,1980 NAME POSITION
% nte Conner NRR/0RB #3 Abdel Hafiz NRC/SEB Christi, Key BG&E Richard Milos NES Chang Li NRR/NRC Surendra Daulat Bechtel B. E. DiGiongio Bechtel Richard C.L. Olson BG&E R. F. Ash BG&E Charles H. Linthicum BG&E Iqbal Husain Nuclear Energy Services l
i g
/
-