Forwards Summary of Latest (June 1980) Organizational Change.Info Includes Revised Organization Charts & Provides Overview Identifying Individual Changes Which Affect Overall QA Program
ML19321A162
Person / Time
Site: Marble Hill
Issue date: 07/09/1980
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8007220549
Download: ML19321A162 (8)


Text

'

0714806531 PUBLIC SERVICE INDIANA July 9, 1980 S. W. Shields Senior Vice Presdont -

Nuclear Drvision Mr. Harold R. Denton, Director Docket Nos.: STN 50-546 Of fice of Nuclear Reactor Regulation S7N 50-547 U.S. Nuclear Regulatory Commission Washington, DC 20555 Construction Permit Nos. . CPPR-170 CPPR-171 Marble Hill Nuclear Generating Station Units 1 and 2

Dear Mr. Denton:

In response to the Public Service Company of Indiana, Inc. (PSI) commitment to notify your of fice within thirty (30) days of implementing PSI organizational changes which alter the organizations as described in the Consolidated Description Quality Assurance Program, a su= mary of the latest (June 1980) PSI organization change has been attached.

This summary, including revised organization charts, provides an overview which identifies the individual organization changes and describes how these changes affect the overall Marble Hill Quality Assurance Program.

Please contact me if you have any questions concerning this matter.

Since ly, S.W. Shields FB/dks Attachment l

cc: V. Stello j J.J. Harrison '

E.R. Schweibinz, P.E.

J.G. Keppler /

5

//

8007220 h p 1

P.O. Box 190, New Washington, Indiana 47162 812., 293.4441 l l

Marble Hill Project r Organizational Change Summary .

i The changes .which ~were made to the Marble Hill Project organization durang June 1980 are detailed on the attached Project Organization Charts

.(Attachments 1 thru 5). A description of these changes including how and where they affect the Quality Program is provided below: ,

a)' The Marble Hill Project (Attachment 1) now has or.-site corporate

! ' management representation. This change results from the establishing of  !

the Senior Vice President-Nuclear Division at the site who has assumed the overall responsibility for the Marble Hill Project Quality Assurance Program previously chartered to the Vice President-Electric System.

b) The establishment of a new Project Testing Organization (Attachment 2)

. managed by the Test Director has combined the testing responsibilities of the CHQ Test and Startup, Licensing and Construction organizations into one on-site testing operation. These other organizations still provide j t support to th construction and pre-operational testing activities but as >

shown overall test direction is the responsiblity of the Test Director.

l l t c) The Construction Management Organization (Attachment 3) has changed only in the area of test direction as discussed in item (b) above. In conjunction with this reassignment of responsibility the position of Systems Turnover Manager has been deleted.

d) Minor title changes (i.e., Material Management Manager to Material a Manager, etc.) have been made in the Project Control Organization (Attachment 4) without major af fect on the scope and performance of respor.:ibility functions occuring.

i e) The Quality Assurance Organization (Attachment 5) has been restructured placing more emphasis on the control of specific functional areas of responsitity (i.e. , Q. A. Records, Administration, Audits , etc.) . A Superintei int Quality Administration reporting to the Quality Assurance Manager.has been added.with responsibilities for establishing and

) maintaining a storage and retrieval system for Qualier Verification i Records, monitoring related fiscal controls and assi.4 ting the Quality I. Assurance Manager in general departmental and administrative matters. A Q.A. Training Supervisor reporting to the Superintendent Quality Systems has also been-added having prime responsibility for training of PSI  ;

personnel in Quality Assurance concepts, methods and procedures. The  ;

procurement and source surveillance activities have been combined for more

]

ef 2icient coverage and are .the specific responsibility of the Procurement

and Source Surveillance Supervisor who reports directly to the .

Superintendent Inspection.

(f) The Licensing Organization responsibilities remain essentially the same with the exception of the removal of test direction responsibility as discussed in item (b) above. -

g) The Purchasing function has been supplemented with the addition of a Purchasing Manager who reports directly to the Director Purchasing and performs the functions of the Director Purchasing at the site.

1 1

J s

i h~

I I

i 4

,a -

,- m< n w w-, , a e -- , w-

Casa L KttAN AW Ot 4 L F EAECL,'TIVE CDICI.R I I F xL511.LNT VICE FitsIt,EST

  • VICE DENT EUI I gggg CPERATING MIIWS CtFICER I . I l l l l l l l E: RECTOR A VICE FRESIDCET A SENtot VICE A F3CMA51NG TINANCIAL FRESIDENT AED VICE FRESILEET
  • VICE FRESIDEET
  • VYCE POESIDENT VICE PRESIDEST OPERATIONS A55157 ANT TO CCNSTRUCTION P0cER PERSONNEL EECIEEIRIEC THE PRE 51 LENT RELATIONS I I QUALITY A CEQ Tf5T AND WCLEAR FL'ELS A15 TRANCE STARTt'P PCR. MANACER RETIEW COS.!TTEE I CNQ I 5:Ty SEN!ck gg 8 vic,gis'=r ____._________________l DIV151DN ,

1 I I l PtRCHASIEC FROJECT A QUALITY A A MANAGER PERSONNEL LICEN5ING A550RA5CE PROJECT DIRT.CTOR MANAGER HANAGER DIRECTOR-1 I l l l TRAIN 1hc SATETY AND FIRE CONSTRUCTION FRQJECT P ROJ'.CT PRallCT TEST hANAGER FREVENTION MANAGER ENGINEER!kG CONTROL 5 ADMINI51 Raft 1 DipICTea SUPERVISOR MANAGER FANACER

  • Denotes !! embers of Quality Assurance Review Committee.
    • Denotes Quality Assurar.cc Review Committee Chairperson.

DERALL fMRBLE 11111 PUBLlC PNG GrallMT101 SERVICE ATTACH 4Erff 1 As or 6-80

__}

GHO TEST & - - - - - - - - - - - - - - - TEST - - - - - - - - - - - - STATION STARTUP MGR. DIRECTOR MAllAGER STARTUP fWLAGER PLMINER 'ELEC.8 CONT.

CONSTRUCTION TURNOVER MEOi TEST fEL AND TEST TEST MANAGER SUPERVISOR MANAGER SUPERVISOR SCHFrfitFR MAfWER LEAD MEOi. LEAD I & C LEAD ELEC. LEAD MECH. LEAD INAC LEAD ELEC. LEAD INST. &

TEST TEST TEST TEST TEST TEST CON" & TEST ENGINEER ENGINEER ENGINFFR ENGINEER ENGINFFR ENGINFFR _ENG:$FFR PROJECT TESTING' ATTActfENT 2 ORGAfHZATION PUBLIC ,

SERVICE .

INDIANA AS OF 6-80

o CONSTRUCTION MANAGER CONSTRUCTIos ST4F MANACII I I I 15STRLMENTATIO3 COhSTRUCTION l ASSISTANT EESIDENT A's CONTRACT CONSTRUCTION CCttTROL MANACH MANAGER M.U(ACER DCINEER

~

l l l l utEA CONSTkUCTION AREA CONSTRUCTIOr< ARIA CONSTRUCTION AREA CONSTRUCTION MANAGER MANAGER MANAGER MANAGER TL'RSINE BIDC. AUIILIART Bl.DC. REACTCR BIJC. CEN. FACILITIES PRajECT ATTACHMENT 3 C01STRUCTl01 PUBLIC UGfil7ATIU!

SERVICE INDIANA AS OF 6-80

PROJECT CONTROL MANAGER l

l _

i l HGR. PLU; SING, COST l SUPERVISOR MATERIAL SCHED., & ESTIMATING; AREA CONTROL MANAGER SUPERVISOR SUPV. STORAGE _

DATA & MAINTENANCE MANAGEMENT SUPERVISOR SUPV. MANAGEMENT ~

PROJECT PLANNING INFORMATION AND SCHEDULING SUPERVISOR SUPERVISOR PROJECT RECEIVING & -

COST & ESTIMATING WAREHOUSING PIBJECT ATTACIOfENT 4 PUBUC ORGNil2AllW seavice INDIANA AS OF 6-80

QUAL 8TV A ssuRANCE MAmAGER M A4 AGE R

~ QuALsTV SWI

- OuALaTV M thGamitR88e4 -

- man ADuant1TRATO4 MU SYIU"I ELWT gyy ~._ Rg og Nth 8thT Asso PROGRAas F = r.6 E E RimG Surt Rv450R SUPPORT Surt avt3OR MECMA$eaCAL QUAL Ty COhSTRUCTeose T

, n.r.,6 s e a in.n _

SURwtIL LANCE MI"' M SUPtRWB50m 3 Wry 4 LECTRICAL QuaLaty RECIIII QA a =< ,6 a s a >=c skFECTsDas Op(RAT gQh$

Surt RVa5OR SUPE Rwa 50m Bi.#T mtLO,9eO4 Qual Ty QA ru .s, s a =ri TRAthHsG MAT & Al AL AND510 RAGE SurtRVLEOR SURvisLLApsCE SUPERwa50m fWUECT WAllIY ATTACIBfENT 5 PUBLIC m m M IM T101 SERVICE INDIANA As or 6-80

_ ________________________ _ ._ _