Text
A.,,?
.o Metropolitan Edison Company Post Office Box 480 II L
Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number July 15, 1980 TLL 343 IMI Program Office Attn:
Mr. John T. Collins, Deputy Director U. S. Nuclear Regulatory Commission c/o Three Mile Island Nuclear Station Middletown, Pennsylvania
-17057
Dear Sir:
Three Mile Island Nuclear Station, Unit II (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Reac. tor Building Entry In your letter of May 16, 1980, NRC/TMI-80-088, approval was granted for one (1) entry into the TMI-II reactor building scheduled for May 20, 1980.
As you are aware, the actual entry was delayed due to a malfunction of the reactor building inner door.
Subsequently, corrective action en the malfunctioning door has been performed and purging of the reactor building atmosphere is completed.
The purpose of this letter is to advise you of our intention to make a reactor building entry during the week of July 21, 1980. The purposes to be accomplished during this entry are to verify the inner door operability and to gather data on radiation levels and contamination levels in the vicin- of the door.
We intend to enter the reactor building in a two-phase app.anch:
Operating the inner door (opening and closing), then veri-PHASE I fying an acceptable seal leakage rate.
PHASE II - Manned entry of the reactor building.
A.
PHASE I 1.
A Temporary Change Notice will be issued to Procedure 2104-4.55 to incorporate the inner door ol : ability checks into the procedure.
2.
The inner door seals will be tested in accordance with Procedure 2311-5.
If the door seals fail to provide adequate sealing, duct tape or caulking of the inner door n111 be performed 3 outlit.W in the approved entry procedure.
3.
Back-up lighting and breathing equipment is not required, g
4.
One breathing zone air saepler will be utilized.
/ O l
r ;co ter Ed. son Company <s a f.'emte of the Gretal Pcb : Ut...tes Setem 8007220 W 4
[
.3,,
J. T. C;111no TLL 343
~
5.
Health Physics personnel will serve as the back-up team.
6.
Protective clothing will be plastic and/or cloth anti c's with multiple hand and foot protection.
B.
PHASE II For entering the reactor building -
1.
The inner air lock door will be closed but unlatched. A Health Physics Technician will remain inside the air lock during the entry.
2.
The initial entry will be 20 minutes in duration from entering the reactor building inner door.
3.
No back-up oxygen supply is required.
4.
One of the two entry personnel will carry a breathing air zone sampler.
5.
The expected gamma dose rate is reduced from 2.2 R/hr. to 1.6 R/hr. In no case will the planned dose be allowed to exceed 1 R for each entry team member (no change from original program).
6.
Protective clothing will be plastic and/or cloth anti c's with multiple hand and foot protection.
7.
NIOSH approved self-contained breathing apparatus will be utilized either MSA, Bio Marine, or Scott.
The required ravisions to the reactor building entry procedure to incorporate the above discussed changes will be submitted to the Nuclear Regulatory Cem-mission for approval.
Upon completion of this first reactor building entry, it is anticipated that additional entries will be required on a frequent basis for data acquisition purposes. NRC notification of subsequent entries would be made through already established communication channels: POD meetirgs, procedure approvals, work requests, ECM's, etc.
Sincerely,
/s/ G. K. Hovey G. K. Hovey Director, TMI-II GKH:LJL: dad CC