Text
~
r
I fj- {J Metropolitan Edison Company i
I _
$3 Post Office Box 480 W k$
Middletown, Pennsylvania 17057 717 9444041 Wnter's Direct Dial Number July 16, 1980 TLL 339 Office of Inspection and Enforcement Attn:
E. J. Brunner, Chief Raactor Operations and Nuclear Support Branch U. S. Nuclear Regulatory Coc: mission 631 Park Avenue King of Prussia, Pa.
19406
Dear Sir:
Three Mile Island Nuclear Station, Unit I (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Inspection Report 50-289/80-05 This letter is in response to Inspection Report 50-289/80-05 which contains one apparent deviation. Attached please find our response.
Sincerely, Signed J. G. Herbein J. G. Herbein Vice President TMI-I JCH:DGM: hah Attachment n._
cc:
E. J. Sriyder D. DiIanni H. Silver J. T. Collins ODl S
/ /
Metropon:an Ed: son Company is a Memeer of the Genera! Pub 5c UM:es S3s:cm 80 07210M 'Q TLL 339 INSPECTION REPORT 50-289/80-05 Deviation:
The RRR is a three volume document that had been submitted by the
. licensee to NRC-NRR describing the control and requirements to be imposed on Unit I restart activities. The inspectors noted that in a number of instances this document imposes requirements in addition to those found in the QA Progre > and implementing procedures such as GP-1008.
The inspector identified that those additional RRR requirements were not included or referenced in any implementing instructions / procedures, including engineering tasks assigned to the licensee's architect /
engineer (three specific examples are discussed in paragraphs 4.c and 5.b of this report).
The failure to incorporate those additional requirements into implementing instructions / procedures is considered to be a deviation since the RRR is a written commitment to the NRC (289/50-05-01).
Response
The failure to incorporate the additional RRR requirements into implementing instructions has been corrected by the issuance of the GAI/GPUNC TMI Project Management Manual rev. O dated 4/30/80 and GPUNC ES-009 rev. O dated 7/8/80. Paragraph 2:05 of TMI P>Di directs the project engineer to ensure that all GAI work is done in accordance with RRR.
CPUNC ensures same by using the Verification Checklist in ES-009.