.,f '2;%
UNITED STATES
['$ <.- f i j
NUCLEAR REGULATORY COMMISSION
- 7. g_ge.
E WASHWGTON, D. C. 20555
% ?%f =
g v$#
July 7, 1980 2cke:s Nos. 50-321 and 50-366 KEMORANDUM FOR:
Robert W. Reid, Chief, Operating Reactors Branch #4, DL FRC'i:
D. M. Verrelli, Project Manager, Operating Reactors Branch #4, DL S'JEJECT -
" MEETING
SUMMARY
HATCH MK 1 LTP" On July 3,1980, members of the staff met with representatives of Georgia Fower Company (licensee) in Betheda, Maryland. The purpose of the meeting was to discuss the licensee's schedule for completing modifications to Eatch Units Nos.1 and 2 for resolution of the MK 1 containment long term p rcgram. The results of the meeting are summarized below.
The licensee described the type of modifications that have been ccmpleted sa far and are planned during the next two refueling outages for each Hatch Unit (see attachment 1). Notwithstanding any later identified modifications that may be required to satisfy the MK 1 LTP accentance criteria, Hatch Unit 2 mocifications should be completed by the end of the Fall 1981 outage; Hatch 1 55culd be completed by the end of the Spring 1932 cutage.
The licensee ex;1ained that this schedule attempts to optimira ha 'ne of necessary cratis particularly in view of other actions required to satisfy the staff's addit onal TMI-2 related activities.
The members of the staff indicated that the schedule is a definite improvement over that implied in the licensee's May 14, 1980 submittal which implied a crpletion date of December 1982. The staff requested that the licensee provide documentation of his detailed schedule.
This submittal should include:
a)
Forcast of refueling outage dates, b) identification of actions to be completed during each outage, c) an estimate of the strengthened configuration of the containment prior to installation of T quenchers, d) a justification of why his proposed schedule optimizes the MK 1 LTP
- solution, e) a description of the precautions that are being taken to avoid unstable condensation loads, and f) the relationship between these efforts and other actions being taken because of our TMI-2 related concerns.
8007180%f7
.s.
2 The licensee agreed to provide the requested docunentation by the end of
!aly 1980.
A list of attendees is attached.
l
$v)%n 9
D. M. ferralli, Project Manager Operating Reactors Branch #4 Division of Licensing l
Attachrents:
1.
Match Modifications 2.
List of Attendees 4
4 4
4
^
_. _. _ _, _ _ =. _ _, _ _
o
(-
CaTLETED MODIFICATIGG PLANI HATCH TORUS MODI?ICATIO'; WORK CGTLITED EATCH 1 a? DOLE:2:;TATIO';: ?DEP 3ACK SYSTEM CCLLT; TO SHELL MODIFICATIONS TAIL PIPE PRESSURE MC'iITOR NEW SRV TOP WOR *G TDTORARY SRV LINE SU?? ORT MOD PLCT U'i!QUE SRV TEST (WITH RAMSHEAD)
EATCE 2 4? SYSTD
(
SADDLES A'iD TIE DOW:;, VE'iT EEADER SUPPORTS b
NEW SRV TOP WCR'G TAIL FI?E PRESSUF3 MCNITOR PLANT U';IQUE SRV TEST (WITH RAMSHEAD)
GI READER DEFLECTOR DOW:!CO:GR TIES Cc=pleted during recent cutage.
EDWIN I. HATCH NUCL?P PLANI UNITS 1 & 2 PLANNED MODIFICATIONS Unit 1 Unit 2 T-Quencher T-Quencher T-Quencher Supports
. T-Quencher Supports Catwalk Colu=ms
. Catwalk Colu:cas RER Test Line Fix
. RHR Test Line Fix Miscellaneous Pipe Supports Torus Shell Modifications Torus Shell Modifications 1
SR7 Test Instru: entation (If Needed)
SRV Test Instrumentation (If Needed)
Te=perature Monitoring System Te=perature Monit.
'ng Syste=
. Ther=owells
. Ther=owells SR7 Vacuum Breakers SRV Vacuum Breakers Vest Header Deflector Intermediate Supports for Safety Downcocer Ties Relief Valve Discharge Lines 7e=t Line Reinforcing POTENTIAL M0JIFICATIONS Attached Piping Attached Piping Miscellaneous Mods.
Miscellaneous Mods.
s MODIFICATIm SCIED.TLE EDWIN I. HATCH NUCLEAR PLANT UNITS 1 & 2 U=it 1 Unit 2 Ja=. 1981 Mods.
October 1980
- T-Qaencher
- 'T-Quencher
- T-Qaencher Supports
- T-Qaencher Supports
- Catwalk Colu=ns
- Catvalk Colu=ns
- RER Test Line Fix RER Test Line Fix
- Miscellaneous Pipe Supports Torus Shell Modifications Torus Shell Modifications SEV Test Instru=entation (If Needed)
SRV Test Instrunentation (If Needed)
Te= erature Monitoring Syste=
Te=perature Monitoring Syste=
- Ther=cuelds
- Ther=owelds Vent Header eflector SRVDL Intermediate Supports
- Downconer Ties Vent Line Reinforcing Sedne 1982 Mods. Comolete Winter 1981 Mods. Complete SIV Vacuu= Breakers SRV Vacuu= Breakers T-Qaenchers T-Quenchers Miscellaneous Miscellaneous
- Partial Installation (T-Qaencher & Supports).
9 LIST OF ATTENDEES
.;RC C. I. Grimes
- 0. M. Verrelli D. G. Eisenhut (Partial attendance)
P.. W. Peid GPC W. A. Widner J. R. Jordan EECHTEL G. A. Kosi
,