ML19320C916
ML19320C916 | |
Person / Time | |
---|---|
Site: | Allens Creek File:Houston Lighting and Power Company icon.png |
Issue date: | 07/16/1980 |
From: | Black R NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD) |
To: | Cheatum E, Linenberger G, Wolfe S Atomic Safety and Licensing Board Panel |
Shared Package | |
ML19320C917 | List: |
References | |
NUDOCS 8007180260 | |
Download: ML19320C916 (1) | |
Similar Documents at Allens Creek | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20058M0361993-04-12012 April 1993
[Table view]Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20235B4531987-09-22022 September 1987 Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ST-HL-AE-1666, Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports1986-05-22022 May 1986 Requests Relief from Preservice Insp of Certain Component Supports Per Section XI of ASME Boiler Pressure Vessel Code. Attachment 1 Shows Thermal Expansion Testing of Sys Subj to Preservice Exam of Component Supports ML20140F3691986-01-14014 January 1986 Further Response to FOIA Request for Several Categories of Documents Re Pressure Suppression Containment.Fsar & SER for Limerick Only Documentation Re 4x4 Tests.Encl Apps D-G Documents Responsive to Item 4 Also Available in PDR ML20063H0331982-08-27027 August 1982 Advises That Plants Have Been Canceled.Alternative Dispositions of Application to Be Discussed W/Nrc. Certificate of Svc Encl ML20062G8131982-08-11011 August 1982 Forwards NRC to Util Re Slippage of CP Issuance Date,For Distribution to Parties ML20054H7481982-06-19019 June 1982 Forwards Houston Chronicle 820617 Article Re Util Requested Rate Increase.Article Appears Relevant to Ultimate Fate of Plant & Appears to Represent Slight Change from Util Dec 1981 Position on Plant Destiny ML20054H7581982-06-18018 June 1982 Advises That Feasibility of Continuing Plant Const Remains Under Util Consideration,W/Ultimate Determination Depending on Disposition of Request for Rate Relief Pending Before Tx Public Utils Commission ML20053B8551982-05-27027 May 1982 Advises That If ASLB Decides Evidence on ASLB Questions 1 & 3 Necessary at June 1982 Hearing,Nrc Would Adopt as NRC Testimony,Affidavits Submitted Supporting NRC 820507 Answers ML20052F2301982-05-0505 May 1982 Requests ASLB Consider 820429 Findings of Fact Even Though Findings Late.Due Date Misconstrued.Striking Findings Would Be Significant Penalty for Minor Infraction ML20050J0231982-04-0606 April 1982 Forwards Applicant Answers to Doherty Second & Third Sets of Interrogatories,Questions 29 & 8,respectively,re Quadrex Rept.Related Correspondence ML20050H2341982-04-0606 April 1982 Admits Truth of Items 160-163 in 820323 Request for Admissions.Relevance Not Admitted.Related Correspondence ML20050E4131982-04-0505 April 1982 Advises of Typographical Error in Applicant Answers & Objections to Doherty Fifth Set of Interrogatories.Related Correspondence ML20050E2851982-04-0505 April 1982 Forwards Applicant Answers & Objections to J Doherty Sixth & Seventh Sets of Interrogatories Re Quadrex Rept.Related Correspondence ML20050C7771982-03-31031 March 1982 Forwards IE Bulletin 82-01, Alteration of Radiographs of Welds in Piping Subassemblies. No Specific Actions Required ML20050C4991982-03-26026 March 1982 Forwards Jh Goldberg Testimony on Technical Qualifications, Lj Sas Testimony on Tx Pirg Addl Contention 31 & Applicant Response to Jf Doherty Request for Documents.Related Correspondence ML20042C6231982-03-25025 March 1982 Explains Problems W/Timing of Filings & Tx Bar Exam ML20042B5051982-03-16016 March 1982 Forwards Bechtel Preliminary Assessment Rept on Quadrex Rept.J Doherty Also Being Served Which Renders 820305 Motion for Bechtel Quadrex Rept Review Moot.W/O Encl. Related Correspondence ML20049J6861982-03-15015 March 1982 Advises That Future of Facility Still Under Review.Aslb Timely Decision Is Important Factor in Evaluation. Certificate of Svc Encl ML20049J6701982-03-10010 March 1982 Forwards Table of Contents & Citations Inadvertently Omitted from Applicant 820305 Brief in Opposition to Appeal of R Alexander ML20041F0881982-03-0909 March 1982 Forwards Attachment 1 to Applicant Answers to Doherty First Set at Interrogatories Re Quadrex Rept ML20041D8591982-03-0202 March 1982 Comments on Generic Ltr 81-40 Re Qualifications of Reactor Operators - License Exams ML20041B0671982-02-18018 February 1982 Responds to NRC Re Application of Final Rule on Licensing Requirements for Pending CP & Mfg License Applications.Final Rule Did Not Identify Need for Clarifying Changes to Facility Application.Commitments Acceptable ML20040H3381982-02-12012 February 1982 Forwards Util 820212 News Release Re Feasibility of Plant Licensing & Const,Per 820209 Conversation ML20040F8111982-02-0505 February 1982 Responds to Sj Wolfe .Ser Suppl 3 Needs to Be Supplemented or Altered Due to Commission Final Rule Re Licensing Requirements for Pending CPs ML20039E9771982-01-0808 January 1982 Forwards NRC Proposed Findings of Fact & Conclusions of Law on Environ Matters.Exhibit & Witness Index to Be Provided W/Applicant Safety Findings ML19255A1721982-01-0606 January 1982 Requests Temporary Waiver to 10CFR73.21 (d)(2) Re Storage of Unclassified Safeguards Info.Gsa Approved Containers Have Been Requisitioned W/Earliest Possible Delivery Date of 820315 ML20062M6221981-12-11011 December 1981 Requests Citizens for Fair Util Regulation Respond to Applicant Interrogatories 45-3 Through 83-3,subj of ASLB 810728 Order.Response Necessary So Applicant Can Seek Addl Discovery on Contention 4.Related Correspondence ML20033D0111981-12-0303 December 1981 Advises That Long & short-term Interest Rates in Table 20.2 of Peterson Written Testimony Are Both Actual Cost to Company & Stated or Face Amount of Interest Rate ML20033C9461981-12-0101 December 1981 Forwards Order of Witness Presentation.Names of Corps of Engineers Witness & NRC Witness on Generic Issues to Be Furnished Later in Wk.Svc List Encl.Related Correspondence ML20033A4221981-11-23023 November 1981 Forwards Transcript of 811116 Hearing,Pp 19,866-19,876, Wherein ASLB Ruled on Util & NRC 811030 Joint Motion to Establish Schedule to File Proposed Findings of Fact & Conclusions of Law & on J Doherty 811106 Motion to Reply ML20032C6691981-11-0606 November 1981 Forwards M Field Memo Explaining Correction to Testimony Re Tx Pirg Contention 6 on Mannings Coefficient.W/O Encl ML20032D9101981-11-0606 November 1981 Forwards Proposed Schedule for Presentation of Witness for 811116-20 & 1207-11 Hearing Sessions,Per ASLB 811030 Hearing Recommendation.Related Correspondence ML20032B1991981-10-30030 October 1981 Forwards Testimony of Vth Leung Re Doherty Contention 11,WL Brocks Re Doherty Contentions 15,21 & 24 & Je Knight & Je Kennedy Re ASLB Questions on Scram Discharge Level Monitoring Sys ML20032C8991981-10-29029 October 1981 Forwards Responding to ACRS Re post- Accident Inerting Sys ML20032C2761981-10-28028 October 1981 Responds to 810915 Request Re ATWS Issue.Util Committed Not to Preclude Incorporation of Any Design Mods Included in NUREG-0460,Vol 4 & to Incorporate Eventual Resolution of ATWS Issue in Design.Related Correspondence ML20011A6271981-10-22022 October 1981 Forwards F Litton Testimony Re Doherty Contention 43 on Stainless Steel Cleaning & Reg Guide 1.54.Testimony Should Be Presented on 811029 to Conserve Travel Funds & to Keep Continuity of Scheduled Issues Intact ML20031G9041981-10-16016 October 1981 Forward Applicant & NRC Agreed Order of Witness Presentation for 811116-20 Evidentiary Hearings.Related Correspondence ML20031E5441981-10-14014 October 1981 Forwards Table 1 & Attachment 1 to Rl Gotchy 811009 Testimony Re Increased Risk of Cancer & Noncancerous Effects of App I Levels of Radiation & T Urbanik Testimony Re Facility Evacuation Time Estimate Study ML20032B1271981-10-0808 October 1981 Forwards ACRS Re post-accident Inerting Sys ML20031F2921981-10-0808 October 1981 Clarifies 810817 Memo Re Status of State & Local Emergency Preparedness.State of Tx Has Not Prepared site-specific Plans.Any Unusual Problems Will Be Adequately Handled as site-specific Emergency Plans Are Developed ML20040A8681981-10-0404 October 1981 FOIA Request for NRC Reply to Senator L Bentsen Re Status of Facilities ML20031C4461981-10-0101 October 1981 Submits Applicant & NRC Schedule of Witness for 811005-09 & 26-30 Evidentiary Hearing Sessions ML20010H4131981-09-18018 September 1981 Forwards CM Ferrell & L Soffer Testimony Re Bishop Contention 1,MW Hodges Testimony Re Doherty Contention 38B & Rl Tedesco to Util Requesting Addl Info Re ATWS Issue ML20031H3181981-09-18018 September 1981 Forwards Util Supplemental Affidavit & Testimony on Contentions Still in Issue.Related Correspondence ML20031A9591981-09-16016 September 1981 Discusses Presentation at 257th ACRS Meeting on 810910-12 Re post-accident Inerting Sys Proposed as Means of Combustible Gas Control for Facilities.Acrs Requests Design Review Before NRC Approval ML20010H4291981-09-15015 September 1981 Requests Util Update FSAR for Review Prior to NRC Update of SER Section 15.2 & App C ML20010E6381981-09-0303 September 1981 Responds to ASLB Request for Parties Views on Status of Rn-222 Question.Present Record on Radon Sufficient to Support NRC Conclusion That Dose Commitments & Health Effects of U Fuel Cycle Are Insignificant ML20010E5921981-09-0202 September 1981 Forwards NRC & Applicant Order of Witness Presentation for 810914-18 & 1005-16 Hearings,Per ASLB 810616 Order as Modified 1993-04-12 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20099D1091992-07-16016 July 1992
[Table view]Forwards Listing of Assistant Director for Environmental Projects (Adep) Project Instructions (Pis) Issued to Environmental Projects Personnel on Variety of Issues & Set of Adep PIs ML20062G8131982-08-11011 August 1982 Forwards NRC to Util Re Slippage of CP Issuance Date,For Distribution to Parties ML20054K9581982-06-15015 June 1982 Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology ML20053D6211982-06-0202 June 1982 Informs That Commission Declined to Review ALAB-671.Time within Which Commission May Act to Review Decision Expired. Decision Became Final Agency Action on 820601 ML20053B8551982-05-27027 May 1982 Advises That If ASLB Decides Evidence on ASLB Questions 1 & 3 Necessary at June 1982 Hearing,Nrc Would Adopt as NRC Testimony,Affidavits Submitted Supporting NRC 820507 Answers ML20049K0481982-03-26026 March 1982 Advises That NRR Board Notification Policy Set Forth in NRR Ofc Ltr 19.Policy Followed So That Board Notification 82-08 Not Provided to Limerick ASLB ML20040F8111982-02-0505 February 1982 Responds to Sj Wolfe .Ser Suppl 3 Needs to Be Supplemented or Altered Due to Commission Final Rule Re Licensing Requirements for Pending CPs ML20039E9771982-01-0808 January 1982 Forwards NRC Proposed Findings of Fact & Conclusions of Law on Environ Matters.Exhibit & Witness Index to Be Provided W/Applicant Safety Findings ML20033D0111981-12-0303 December 1981 Advises That Long & short-term Interest Rates in Table 20.2 of Peterson Written Testimony Are Both Actual Cost to Company & Stated or Face Amount of Interest Rate ML20039C8681981-12-0101 December 1981 Notification of 811216 Meeting W/Bwr Owners Group & GE in Bethesda,Md to Discuss Application of Srss Method of Combining Dynamic Responses for Mechanical Components of BWR-Mark III Plants ML20033A4221981-11-23023 November 1981 Forwards Transcript of 811116 Hearing,Pp 19,866-19,876, Wherein ASLB Ruled on Util & NRC 811030 Joint Motion to Establish Schedule to File Proposed Findings of Fact & Conclusions of Law & on J Doherty 811106 Motion to Reply ML20032C6691981-11-0606 November 1981 Forwards M Field Memo Explaining Correction to Testimony Re Tx Pirg Contention 6 on Mannings Coefficient.W/O Encl ML20032B1991981-10-30030 October 1981 Forwards Testimony of Vth Leung Re Doherty Contention 11,WL Brocks Re Doherty Contentions 15,21 & 24 & Je Knight & Je Kennedy Re ASLB Questions on Scram Discharge Level Monitoring Sys ML20011A6271981-10-22022 October 1981 Forwards F Litton Testimony Re Doherty Contention 43 on Stainless Steel Cleaning & Reg Guide 1.54.Testimony Should Be Presented on 811029 to Conserve Travel Funds & to Keep Continuity of Scheduled Issues Intact ML20032A6081981-10-21021 October 1981 Notification of 811023 Meeting W/Util in Bethesda,Md to Discuss Allowable Stress Limits in Concrete Portions of Containment for Test Conditions ML20031E5441981-10-14014 October 1981 Forwards Table 1 & Attachment 1 to Rl Gotchy 811009 Testimony Re Increased Risk of Cancer & Noncancerous Effects of App I Levels of Radiation & T Urbanik Testimony Re Facility Evacuation Time Estimate Study ML20213D8121981-09-19019 September 1981 Advises of Div of Sys Integration Transfer of Mgt & Coordination Function for near-term CP-TMI Issues Review Group to Licensing Project Managers ML20010H4131981-09-18018 September 1981 Forwards CM Ferrell & L Soffer Testimony Re Bishop Contention 1,MW Hodges Testimony Re Doherty Contention 38B & Rl Tedesco to Util Requesting Addl Info Re ATWS Issue ML20031A9591981-09-16016 September 1981 Discusses Presentation at 257th ACRS Meeting on 810910-12 Re post-accident Inerting Sys Proposed as Means of Combustible Gas Control for Facilities.Acrs Requests Design Review Before NRC Approval ML20010E6381981-09-0303 September 1981 Responds to ASLB Request for Parties Views on Status of Rn-222 Question.Present Record on Radon Sufficient to Support NRC Conclusion That Dose Commitments & Health Effects of U Fuel Cycle Are Insignificant ML20010E5921981-09-0202 September 1981 Forwards NRC & Applicant Order of Witness Presentation for 810914-18 & 1005-16 Hearings,Per ASLB 810616 Order as Modified ML20010C3281981-08-13013 August 1981 Forwards NRC Suppl 3 to Ser,Nrc Response to Applicant 810805 Motion to Strike D Marrick Prefiled Testimony & Testimony of MW Hodges Re Doherty Contention 42.Suppl 3 Not Encl ML20009F1851981-07-27027 July 1981 Forwards Testimony of Tl Huang,Km Campe,Ce Mccracken, Mb Fields,Jr Pearing,Cw Moon,Rj Schemel,Mw Hodges,Jbj Reed, Fr Allenspach & JW Gilray ML19248A8641981-07-13013 July 1981 Discusses ACRS 255th Meeting on 810709-11 Re Application of TMI Action Plan Items to Pilgrim Unit 2.NRC Review Team for near-term CP & Mfg Licenses Is Effective.Acrs Does Not Need to Review Action Plan Items for Allens Creek ML19350F0251981-06-16016 June 1981 Notification of 810617 Meeting W/Util in Bethesda,Md to Discuss Increases in Containment Stresses for Test Conditions & During Cooldown Following Inadvertent Inerting ML19346A1711981-06-0202 June 1981 Informs That Rj Giardina Will Be Added as NRC Witness on Doherty Contention 10 Re Diesel Generation.Giardina Will Adopt Previously Submitted Testimony of OP Chopra & Join Chopra on Panel.Prof Qualifications Encl ML19352A9151981-05-29029 May 1981 Provides Info in Response to ASLB 810521 Inquiries.Codell Source of Info on River Dredging Was Telcon W/Army Corps of Engineers.River Navigators Informed of Obstructions by Notice of Navigation Interests ML19347F7291981-05-18018 May 1981 Discusses Facility Environ Review Re Project Manager Concern Over Need for Further Alternate Siting & Need for Power Evaluation.Concerns Involve Hearing Activities Being Conducted W/Ornl.Doe Available for Assistance ML19347F0281981-05-13013 May 1981 Confirms That NRC Response to Doherty Proposed Contention 56 Will Be Filed by 810527,per ASLB & Parties 810512 Understanding ML19345H1641981-04-29029 April 1981 Discusses Jm Scott to Aslb.Ltr Is Not Proper Petition for Reconsideration.Nrc Will Not Respond & ASLB Can Summarily Dismiss Request W/O Formal Action or Ruling ML20008F5991981-04-20020 April 1981 Forwards NRC Testimony by RO Meyer,M Hartzman,Wl Brooks, Sp Chan & KM Campe on Issues Scheduled for 810511-22 Hearing Session ML20008F4651981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003D7021981-03-27027 March 1981 Forwards RB Codell Testimony on Potential Requirements for Dredging of San Bernard River to Transport Reactor Pressure Vessel.Testimony Identical to Ws Bivens Testimony on Subj. Prof Qualifications Also Encl ML19347D3901981-03-12012 March 1981 Forwards Revised Proposed Schedule for First Two Safety Hearings Sessions to Commence on 810511.Applicant Agrees W/Schedule ML19350A4311981-03-12012 March 1981 Forwards Proposed Revised Schedules for Testimony Submittal Re Safety Hearing Sessions Beginning 810511 ML19350A9801981-03-0909 March 1981 Notification of Time Change for 810310 Meeting W/Util in Bethesda,Md to Discuss Licensing Plans for Facility ML20008F2841981-03-0303 March 1981 Notification of 810310 Meeting W/Util in Bethesda,Md to Discuss Licensing Plans for Facility ML19343B9271981-02-10010 February 1981 Comments on Proposed Requirements for near-term CPs & Mfg Licenses Presented During 250th ACRS Meeting on 810205-07. Position on near-term CP Criteria Re Degraded Core Rulemaking Provided ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20003C2001981-02-0404 February 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures ML19345F1571981-01-30030 January 1981 Releases Public Version of Revised Emergency Plan for Facility ML19345F2341981-01-12012 January 1981 Discusses 249th ACRS 810108-10 Meeting Re Requirements for near-term CP Applications.Agrees W/Proposed Siting Approach & Reliability Engineering Position.Proposal Re Degraded Core Rulemaking Should Be Deferred Until 810205-07 Meeting ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19340D3181980-12-18018 December 1980 Forwards Testimony of Rl Gatchy,Ws Bivins,Ge Gears & Cw Moon ML19343B6541980-12-11011 December 1980 Clarifies Redrafted Doherty Contention 26 Re Stud Bolts ML19339C7151980-11-14014 November 1980 Responds to ASLB 801003 Memorandum & Order.No Unresolved Matters Except Various Motions Presently Before ASLB ML19344B4921980-10-17017 October 1980 Seeks Clarification of ASLB 801003 Memorandum & Order Scheduling 810112 Environ Hearing,Re Early Completion of Litigated Issues & Deferral of Emergency Planning ML19338F5391980-10-15015 October 1980 Clarifies 801003 Memorandum & Order.Initial Phase of 810112 Hearing Will Be Devoted Exclusively to Taking of Evidence Re Environ Matters.Intervenor Direct Testimony Must Be Filed No Later than 801218.Ltr Sent to All Parties ML19347B3681980-10-0909 October 1980 Advises That NRC Does Not Engage in Ex Parte Communications W/Aslb Members.Misunderstanding Based on ASLB 800917 Order But Clarified by ASLB 801003 Order 1992-07-16 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20099D1091992-07-16016 July 1992
[Table view]Forwards Listing of Assistant Director for Environmental Projects (Adep) Project Instructions (Pis) Issued to Environmental Projects Personnel on Variety of Issues & Set of Adep PIs ML20133B2601985-10-0303 October 1985 Board Notification 85-087:forwards Vs Noonan to Util & Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns, Per Commission 840706 Revised Notification Policy ML20062G8131982-08-11011 August 1982 Forwards NRC to Util Re Slippage of CP Issuance Date,For Distribution to Parties ML20062E1621982-07-20020 July 1982 Board Notification 82-70:notifies of Differing Prof Opinion Re Sensitization of BWR Stainless Steel Weldments ML20054K9581982-06-15015 June 1982 Notification of 820622 Meeting W/Bwr Owners Group in Bethesda,Md to Discuss Hydrodynamic Pressure Loads in Control Rod Drive Lines Resulting from Fast Scram,Test Data Base & Proposed Methodology ML20053D6211982-06-0202 June 1982 Informs That Commission Declined to Review ALAB-671.Time within Which Commission May Act to Review Decision Expired. Decision Became Final Agency Action on 820601 ML20053B8551982-05-27027 May 1982 Advises That If ASLB Decides Evidence on ASLB Questions 1 & 3 Necessary at June 1982 Hearing,Nrc Would Adopt as NRC Testimony,Affidavits Submitted Supporting NRC 820507 Answers ML20052A1951982-04-0606 April 1982 Board Notification 82-31:forwarding Info Re Hydrodynamic Loads in Control Rod Drive Sys Due to Fast Scram Actuation ML20049K0481982-03-26026 March 1982 Advises That NRR Board Notification Policy Set Forth in NRR Ofc Ltr 19.Policy Followed So That Board Notification 82-08 Not Provided to Limerick ASLB ML19264C5281982-02-0808 February 1982 Board Notification 82-08:forwarding Info Re Errors in BWR Vessel Water Level Indication ML20040F8111982-02-0505 February 1982 Responds to Sj Wolfe .Ser Suppl 3 Needs to Be Supplemented or Altered Due to Commission Final Rule Re Licensing Requirements for Pending CPs ML20039E9771982-01-0808 January 1982 Forwards NRC Proposed Findings of Fact & Conclusions of Law on Environ Matters.Exhibit & Witness Index to Be Provided W/Applicant Safety Findings ML20033D0111981-12-0303 December 1981 Advises That Long & short-term Interest Rates in Table 20.2 of Peterson Written Testimony Are Both Actual Cost to Company & Stated or Face Amount of Interest Rate ML20039C8681981-12-0101 December 1981 Notification of 811216 Meeting W/Bwr Owners Group & GE in Bethesda,Md to Discuss Application of Srss Method of Combining Dynamic Responses for Mechanical Components of BWR-Mark III Plants ML20033A4221981-11-23023 November 1981 Forwards Transcript of 811116 Hearing,Pp 19,866-19,876, Wherein ASLB Ruled on Util & NRC 811030 Joint Motion to Establish Schedule to File Proposed Findings of Fact & Conclusions of Law & on J Doherty 811106 Motion to Reply ML20032C6691981-11-0606 November 1981 Forwards M Field Memo Explaining Correction to Testimony Re Tx Pirg Contention 6 on Mannings Coefficient.W/O Encl ML20032B1991981-10-30030 October 1981 Forwards Testimony of Vth Leung Re Doherty Contention 11,WL Brocks Re Doherty Contentions 15,21 & 24 & Je Knight & Je Kennedy Re ASLB Questions on Scram Discharge Level Monitoring Sys ML20011A6271981-10-22022 October 1981 Forwards F Litton Testimony Re Doherty Contention 43 on Stainless Steel Cleaning & Reg Guide 1.54.Testimony Should Be Presented on 811029 to Conserve Travel Funds & to Keep Continuity of Scheduled Issues Intact ML20032A6081981-10-21021 October 1981 Notification of 811023 Meeting W/Util in Bethesda,Md to Discuss Allowable Stress Limits in Concrete Portions of Containment for Test Conditions ML20031E5441981-10-14014 October 1981 Forwards Table 1 & Attachment 1 to Rl Gotchy 811009 Testimony Re Increased Risk of Cancer & Noncancerous Effects of App I Levels of Radiation & T Urbanik Testimony Re Facility Evacuation Time Estimate Study ML20213D8121981-09-19019 September 1981 Advises of Div of Sys Integration Transfer of Mgt & Coordination Function for near-term CP-TMI Issues Review Group to Licensing Project Managers ML20010H4131981-09-18018 September 1981 Forwards CM Ferrell & L Soffer Testimony Re Bishop Contention 1,MW Hodges Testimony Re Doherty Contention 38B & Rl Tedesco to Util Requesting Addl Info Re ATWS Issue ML20031A9591981-09-16016 September 1981 Discusses Presentation at 257th ACRS Meeting on 810910-12 Re post-accident Inerting Sys Proposed as Means of Combustible Gas Control for Facilities.Acrs Requests Design Review Before NRC Approval ML20010E6381981-09-0303 September 1981 Responds to ASLB Request for Parties Views on Status of Rn-222 Question.Present Record on Radon Sufficient to Support NRC Conclusion That Dose Commitments & Health Effects of U Fuel Cycle Are Insignificant ML20010E5921981-09-0202 September 1981 Forwards NRC & Applicant Order of Witness Presentation for 810914-18 & 1005-16 Hearings,Per ASLB 810616 Order as Modified ML20010C3281981-08-13013 August 1981 Forwards NRC Suppl 3 to Ser,Nrc Response to Applicant 810805 Motion to Strike D Marrick Prefiled Testimony & Testimony of MW Hodges Re Doherty Contention 42.Suppl 3 Not Encl ML20009F1851981-07-27027 July 1981 Forwards Testimony of Tl Huang,Km Campe,Ce Mccracken, Mb Fields,Jr Pearing,Cw Moon,Rj Schemel,Mw Hodges,Jbj Reed, Fr Allenspach & JW Gilray ML19248A8641981-07-13013 July 1981 Discusses ACRS 255th Meeting on 810709-11 Re Application of TMI Action Plan Items to Pilgrim Unit 2.NRC Review Team for near-term CP & Mfg Licenses Is Effective.Acrs Does Not Need to Review Action Plan Items for Allens Creek ML19350F0251981-06-16016 June 1981 Notification of 810617 Meeting W/Util in Bethesda,Md to Discuss Increases in Containment Stresses for Test Conditions & During Cooldown Following Inadvertent Inerting ML19346A1711981-06-0202 June 1981 Informs That Rj Giardina Will Be Added as NRC Witness on Doherty Contention 10 Re Diesel Generation.Giardina Will Adopt Previously Submitted Testimony of OP Chopra & Join Chopra on Panel.Prof Qualifications Encl ML19352A9151981-05-29029 May 1981 Provides Info in Response to ASLB 810521 Inquiries.Codell Source of Info on River Dredging Was Telcon W/Army Corps of Engineers.River Navigators Informed of Obstructions by Notice of Navigation Interests ML19347F7291981-05-18018 May 1981 Discusses Facility Environ Review Re Project Manager Concern Over Need for Further Alternate Siting & Need for Power Evaluation.Concerns Involve Hearing Activities Being Conducted W/Ornl.Doe Available for Assistance ML19347F0281981-05-13013 May 1981 Confirms That NRC Response to Doherty Proposed Contention 56 Will Be Filed by 810527,per ASLB & Parties 810512 Understanding ML19345H1641981-04-29029 April 1981 Discusses Jm Scott to Aslb.Ltr Is Not Proper Petition for Reconsideration.Nrc Will Not Respond & ASLB Can Summarily Dismiss Request W/O Formal Action or Ruling ML20008F5991981-04-20020 April 1981 Forwards NRC Testimony by RO Meyer,M Hartzman,Wl Brooks, Sp Chan & KM Campe on Issues Scheduled for 810511-22 Hearing Session ML20008F4651981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML19345G4791981-04-0202 April 1981 Notification of 810408 Meeting W/Utils in Bethesda,Md to Discuss NRC Activities & Plans for Review of near-term CP Plants Considering Proposed Rule on Licensing Requirements for Pending CP & Mfg License Applications ML20003D7021981-03-27027 March 1981 Forwards RB Codell Testimony on Potential Requirements for Dredging of San Bernard River to Transport Reactor Pressure Vessel.Testimony Identical to Ws Bivens Testimony on Subj. Prof Qualifications Also Encl ML19350A4311981-03-12012 March 1981 Forwards Proposed Revised Schedules for Testimony Submittal Re Safety Hearing Sessions Beginning 810511 ML19347D3901981-03-12012 March 1981 Forwards Revised Proposed Schedule for First Two Safety Hearings Sessions to Commence on 810511.Applicant Agrees W/Schedule ML19350A9801981-03-0909 March 1981 Notification of Time Change for 810310 Meeting W/Util in Bethesda,Md to Discuss Licensing Plans for Facility ML20008F2841981-03-0303 March 1981 Notification of 810310 Meeting W/Util in Bethesda,Md to Discuss Licensing Plans for Facility ML19343B9271981-02-10010 February 1981 Comments on Proposed Requirements for near-term CPs & Mfg Licenses Presented During 250th ACRS Meeting on 810205-07. Position on near-term CP Criteria Re Degraded Core Rulemaking Provided ML20003C3751981-02-0909 February 1981 Forwards Projected Target Dates for Pending CP Applications. Schedule for CP Issuance Is Heavily Dependent on Scope of TMI-related Requirements ML20003C2001981-02-0404 February 1981 Notification of 810203 Meeting W/Utils in Bethesda,Md to Discuss Hydrogen Control & Associated Containment Pressures ML19345F1571981-01-30030 January 1981 Releases Public Version of Revised Emergency Plan for Facility ML19345F2341981-01-12012 January 1981 Discusses 249th ACRS 810108-10 Meeting Re Requirements for near-term CP Applications.Agrees W/Proposed Siting Approach & Reliability Engineering Position.Proposal Re Degraded Core Rulemaking Should Be Deferred Until 810205-07 Meeting ML20083L3481980-12-31031 December 1980 Forwards Action Plan for Resolution of non-TMI Issues for Pending Cp/Mfg License Applications,Per Ofc of Nuclear Reactor Regulation Approach to Resumption of Licensing. Safety Evaluation Inputs Should Be Provided by 810601 ML19340D3181980-12-18018 December 1980 Forwards Testimony of Rl Gatchy,Ws Bivins,Ge Gears & Cw Moon ML19343B6541980-12-11011 December 1980 Clarifies Redrafted Doherty Contention 26 Re Stud Bolts 1992-07-16 Category:NRC TO ASLP MONTHYEARML20053B8551982-05-27027 May 1982
[Table view]Advises That If ASLB Decides Evidence on ASLB Questions 1 & 3 Necessary at June 1982 Hearing,Nrc Would Adopt as NRC Testimony,Affidavits Submitted Supporting NRC 820507 Answers ML20040F8111982-02-0505 February 1982 Responds to Sj Wolfe .Ser Suppl 3 Needs to Be Supplemented or Altered Due to Commission Final Rule Re Licensing Requirements for Pending CPs ML20039E9771982-01-0808 January 1982 Forwards NRC Proposed Findings of Fact & Conclusions of Law on Environ Matters.Exhibit & Witness Index to Be Provided W/Applicant Safety Findings ML20033D0111981-12-0303 December 1981 Advises That Long & short-term Interest Rates in Table 20.2 of Peterson Written Testimony Are Both Actual Cost to Company & Stated or Face Amount of Interest Rate ML20032C6691981-11-0606 November 1981 Forwards M Field Memo Explaining Correction to Testimony Re Tx Pirg Contention 6 on Mannings Coefficient.W/O Encl ML20032B1991981-10-30030 October 1981 Forwards Testimony of Vth Leung Re Doherty Contention 11,WL Brocks Re Doherty Contentions 15,21 & 24 & Je Knight & Je Kennedy Re ASLB Questions on Scram Discharge Level Monitoring Sys ML20011A6271981-10-22022 October 1981 Forwards F Litton Testimony Re Doherty Contention 43 on Stainless Steel Cleaning & Reg Guide 1.54.Testimony Should Be Presented on 811029 to Conserve Travel Funds & to Keep Continuity of Scheduled Issues Intact ML20031E5441981-10-14014 October 1981 Forwards Table 1 & Attachment 1 to Rl Gotchy 811009 Testimony Re Increased Risk of Cancer & Noncancerous Effects of App I Levels of Radiation & T Urbanik Testimony Re Facility Evacuation Time Estimate Study ML20010H4131981-09-18018 September 1981 Forwards CM Ferrell & L Soffer Testimony Re Bishop Contention 1,MW Hodges Testimony Re Doherty Contention 38B & Rl Tedesco to Util Requesting Addl Info Re ATWS Issue ML20010E6381981-09-0303 September 1981 Responds to ASLB Request for Parties Views on Status of Rn-222 Question.Present Record on Radon Sufficient to Support NRC Conclusion That Dose Commitments & Health Effects of U Fuel Cycle Are Insignificant ML20010E5921981-09-0202 September 1981 Forwards NRC & Applicant Order of Witness Presentation for 810914-18 & 1005-16 Hearings,Per ASLB 810616 Order as Modified ML20010C3281981-08-13013 August 1981 Forwards NRC Suppl 3 to Ser,Nrc Response to Applicant 810805 Motion to Strike D Marrick Prefiled Testimony & Testimony of MW Hodges Re Doherty Contention 42.Suppl 3 Not Encl ML20009F1851981-07-27027 July 1981 Forwards Testimony of Tl Huang,Km Campe,Ce Mccracken, Mb Fields,Jr Pearing,Cw Moon,Rj Schemel,Mw Hodges,Jbj Reed, Fr Allenspach & JW Gilray ML19346A1711981-06-0202 June 1981 Informs That Rj Giardina Will Be Added as NRC Witness on Doherty Contention 10 Re Diesel Generation.Giardina Will Adopt Previously Submitted Testimony of OP Chopra & Join Chopra on Panel.Prof Qualifications Encl ML19352A9151981-05-29029 May 1981 Provides Info in Response to ASLB 810521 Inquiries.Codell Source of Info on River Dredging Was Telcon W/Army Corps of Engineers.River Navigators Informed of Obstructions by Notice of Navigation Interests ML19347F0281981-05-13013 May 1981 Confirms That NRC Response to Doherty Proposed Contention 56 Will Be Filed by 810527,per ASLB & Parties 810512 Understanding ML19345H1641981-04-29029 April 1981 Discusses Jm Scott to Aslb.Ltr Is Not Proper Petition for Reconsideration.Nrc Will Not Respond & ASLB Can Summarily Dismiss Request W/O Formal Action or Ruling ML20008F5991981-04-20020 April 1981 Forwards NRC Testimony by RO Meyer,M Hartzman,Wl Brooks, Sp Chan & KM Campe on Issues Scheduled for 810511-22 Hearing Session ML20003D7021981-03-27027 March 1981 Forwards RB Codell Testimony on Potential Requirements for Dredging of San Bernard River to Transport Reactor Pressure Vessel.Testimony Identical to Ws Bivens Testimony on Subj. Prof Qualifications Also Encl ML19350A4311981-03-12012 March 1981 Forwards Proposed Revised Schedules for Testimony Submittal Re Safety Hearing Sessions Beginning 810511 ML19347D3901981-03-12012 March 1981 Forwards Revised Proposed Schedule for First Two Safety Hearings Sessions to Commence on 810511.Applicant Agrees W/Schedule ML19340D3181980-12-18018 December 1980 Forwards Testimony of Rl Gatchy,Ws Bivins,Ge Gears & Cw Moon ML19343B6541980-12-11011 December 1980 Clarifies Redrafted Doherty Contention 26 Re Stud Bolts ML19339C7151980-11-14014 November 1980 Responds to ASLB 801003 Memorandum & Order.No Unresolved Matters Except Various Motions Presently Before ASLB ML19344B4921980-10-17017 October 1980 Seeks Clarification of ASLB 801003 Memorandum & Order Scheduling 810112 Environ Hearing,Re Early Completion of Litigated Issues & Deferral of Emergency Planning ML19347B3681980-10-0909 October 1980 Advises That NRC Does Not Engage in Ex Parte Communications W/Aslb Members.Misunderstanding Based on ASLB 800917 Order But Clarified by ASLB 801003 Order ML19332A1821980-09-0909 September 1980 Ack Receipt of Applicant Directed to RM Lazo. Concurs W/Applicant Motion to Set Schedule for Evidentiary Hearings.Supports Any Action That May Move Proceeding Expeditiously ML19331B8321980-08-11011 August 1980 Forwards Procedural Assistance Rule Change in Adjudicatory Licensing Proceedings ML19331B8351980-08-0808 August 1980 Forwards Motion for Summary Disposition of Certain Contentions ML19320D7511980-07-18018 July 1980 Forwards NRC Proposed Schedule & NRC Proposed Revised Schedule Suggesting 800808 Prehearing Conference.Tentative Contentions Encl for Prehearing Framework Re Summary Disposition & Simplification of Text ML19320D0081980-07-17017 July 1980 Forwards Notice of Rl Black Appearance & CP Woodhead Withdrawal in Proceeding ML19320C9161980-07-16016 July 1980 Forwards Fh Potthoff 800709 hand-serviced First Set of Interrogatories Directed to Houston Lighting & Power ML19323H5481980-06-11011 June 1980 Advises of Receipt of B Baker 800603 Statement of Position Re Linkage Between Financial Qualifications & Safety.All Parties Involved Should Be Consolidated on Issue.Requests That ASLB Require Appointment of Single Representative ML19262A7091979-11-30030 November 1979 Requests Clarification of ASLB 791119 Order Re Stipulated & Withdrawn Contentions by Jf Doherty.Differences Between Order & Transcript Refs Re Number of Withdrawn Contentions Should Be Defined ML19254D1121979-09-10010 September 1979 Forwards EP Cumings Stating That Previously Undated Petition to Intervene Was Mailed on 790711. Clarification Showed That Petition Was Timely Filed Although Received After 790718 ML19208C6701979-08-28028 August 1979 Ack Receipt of Pj Durkin Petitioning Against Facility.Petition Is Treated as Limited Appearance Request ML19254B1611979-08-16016 August 1979 Ack Receipt of DD Weaver Expressing Desire to Both Intervene & Make Limited Appearance.Aslb Is Requested to Seek Clarification from Petitioner ML19254B1591979-08-16016 August 1979 Ack Receipt of Jf Doherty 790806 Motion Requesting to Postpone Discovery Until After Prehearing Conference.Takes No Position W/Ref to Request But Believes That Solving Requests Informally Is in Best Interests of Parties ML19254B1511979-07-17017 July 1979 Ack Receipt of June-Jul Intervention Ltrs.Barnes & J Robertson Ltrs Should Be Treated as Limited Appearance Requests.A Wharton May Not Intervene.K Mohnke Should Amend Petition.B Wallace & J Robinson Should Clarify Position ML19247A0191979-06-20020 June 1979 Advises That NRC Will Not Respond to Tx Pirg 790615 Amends & Replies to Houston Lighting & Power & NRC Contentions Submitted Per ALAB-535 ML19225B7531979-04-26026 April 1979 Forwards Ser.W/O Encl ML19274F8451979-04-25025 April 1979 Discusses SAND77-1927,Transport of Radionuclides in Urban Environs:Working Draft Assessment. Identifies General Objectives & Topics Discussed.No Action Necessary Per SECY-78-311 & SECY-78-311A NUREG-0470, Forwards DOE Comments Re NRC Final Suppl to NUREG-04701979-02-16016 February 1979 Forwards DOE Comments Re NRC Final Suppl to NUREG-0470 ML19261B7721979-02-15015 February 1979 Informs That NRC Did Not Receive Tx Pirg Motion for Admission of Two Contentions Until 790209 & Will Therefore File Response by 790301 ML20148P2001978-11-0707 November 1978 FES(NUREG0470),Final Suppl,Applicants Environ Rept & PSAR Are Available in Local Pub Document Room.All Petitioners Have Been Sent Copies of the Final Suppl to the Fes. W/Encl Mailing List ML20148H6111978-10-30030 October 1978 Forwards 780929 & 780927 NRC Memos Re Recent Underwriters Lab Fire Protec Test to Demonstrate Effectiveness of Area Sprinklers & Mineral Wool Blanket Cable Tray Fire Barriers ML20197B7231978-10-23023 October 1978 Forwards Agreement on Attachment of Antitrust Lic Condition for Subj Facil ML20148A7311978-10-17017 October 1978 Discusses 780915 Memorandum & Order Establishing Prehearing Conference During Nov 1978.Suggests Date of 781128. Negotiations Re Stipulations Underway ML20147B9551978-09-29029 September 1978 Forwards Stipulation Between NRC Staff & Wayne E.Rentfro, Stipulation Between NRC Staff & Texas Pirg, & Stipulation Between NRC Staff & John F.Dougherty,Individually & on Behalf of the Armadillo Coalition of Tx,Houston Chapter 1982-05-27 |
Text
e p20cv fi t
2
_ o,,
UNITED STATES NUCLEAR REGULATORY COMMISSION o
g E
WASHINGTON,0. C. 20555 E
o July 16,1980 Sheldon J. Wolfe, Esq.,' Chairman Dr. E. Leonard Cheatum Atomic Safety and Licensing Board Panel Route 3, Box 350A U.S. Nuclear Regulatory Conmission Watkinsville, Georgia 30677 Washington, D.C.
20555 Mr. Gustave A. Linenberger Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C.
20555 In the Matter of Houston Lighting & Power Company (Allens Creek Nuclear Generating Station, Unit 1)
Docket No. 50-466 Gentlemen:
At a meeting between the Staff and the parties on July 10, 1980 in Houston, Texas, Intervenor F. H. Potthoff III tendered the attached "First Set of Interrogatories to Houston Lighting and Power," dated July 9, !980.
Since service of this document was by hand-delivery, the Staff indicated that it would complete service on the Board and parties by mail.
Sincerely, I g{ ';
CY i
Richard L. Black Counsel for NRC Staff
Attachment:
As Stated cc:
(w/ attachment)
See Page 2 8007180 2S
+
', cc:
(w/ attachment) 1 J. Gregory Copeland, Esq.
Jack Newman, Esq.
Carro Hinderstein Richard Lowerre, Esq.
Hon. Jerry Sliva Hon. John R. Mikeska Mr. John F. Doherty Mr. and Mrs. Robert S. Framson Mr. F. H. Potthoff III D. Marrack Texas Public Interest Research Group, Inc.
Brenda A. McCorkle Mr. Wayne Rentfro Rosemary N. Lemmer Leotis Johnston Atomic Safety and Licensing Appeal Board Atomic Safety and Licensing Board Panel Docketing and Service Section Mr. William J. Schuessler The Honorable Ron Waters Margaret Bishop J. Morgan Bishop Stephen A. Doggett, Esq.
Bryan L. Baker Robin Griffith Elinore P. Cummings Mr. William Perrenod Carolina Conn U.S. Nuclear Regulatory Commission Region IV