ML19320C652

From kanterella
Jump to navigation Jump to search
Updates 800415 Environ Qualification Rept for Class IE Electrical Equipment in Response to IE Bulletin 79-01B. Forwards Revised Pages & Info Re High Energy/One Break Profiles & LOCA Profiles for Reactor Bldgs.W/O Encls
ML19320C652
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/17/1980
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-01B, IEB-79-1B, NUDOCS 8007170507
Download: ML19320C652 (390)


Text

_ _ _ _ _ _ _ _ _ _.

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 sHIELos L. DALTROFF nac'T sc 0$Erio s June 17, 1980 Docket Nos. 50-277 50-278 IE Bulletin 79-01B Mr. Boyce H.

Grier, Director Office of Inspection and Enforcement Region I U.S.

Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406

Dear Mr. Grier:

This letter provides information which updates the Environmental Qualification Report for. Class lE electrical equipment which was forwarded to you on April 15, 1980.

The attached information includes the following:

1.

High energy line break profiles for Unit 2 and 3 reactor buildings.

2.

Loss of coolant accident profiles for Unit 2 and 3 reactor buildings.

3.

Revised System Component Evaluation Work Sheets.

4.

Revised Notes and Reference pages.

The revised pages included in items 3 and 4 supersede previously submitted pages.

scopM

3-Mr. Boyce H.

Grier Page 2 Additional qualification information will be provided for equipment identified as having " Outstanding Items" in a progress report which will be submitted by August 19, 1980.

If you have any questions or require additional information, please do not hesitate to contact us.

Very truly yours,

} l.,

.lCl>

Attachment cc:

U.S. Nuclear Regulatory Commission w/ attachment Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, DC 20555 Mr. Thomas A.

Ippolito, Chief w/ attachment Operating Reactors Branch #3 Division of Operating Reactors U.S.

Nuclear Regulatory Commission Washington, DC 20555 i

___