ML19320C377

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1113/80-08 on 800617.No Noncompliance Noted. Major Areas Inspected:Facility Organization & Mgt of Matl Control Sys.Details Withheld (Ref 10CFR2.790)
ML19320C377
Person / Time
Site: 07001113
Issue date: 06/25/1980
From: Gillespie F, Hodges J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19320C372 List:
References
70-1113-80-08, 70-1113-80-8, NUDOCS 8007160727
Download: ML19320C377 (1)


Text

3,3y,y 77;;. - ~, -,

g e.. ;,. -, - -......u.n..._........

/

UNITED STATES

(.

8 NUCLEAR REGULATORY COMMISSION o

e a REGIOre il

)b

' Vo 101 MAR!ETTA ST., N.W.,;;U!TE 3100 Y4 o

ATLANTA, GEORGIA 30303 Report No. 70-1113/80-08 Docket No. 70-1113 License No. SNM-1097 Safeguards Group III Licensec: General Electric Company Wilmington, NC 28401 Facility Name: General Electric Company - Wilmington Inspection at: Wilmington, NC Inspection conducted: June 17-19, 1980 Date of Last Material Control and Accounting Inspection Visit: April 21-25, 1980 s

Type of Inspection: Unannounced Material Control & Accounting

- l l$

(CW (l, ulG.

Inspector:

./

W. Hodges, afe rds Aud1 or Date d

CAs C-[N/6 Approved by:

_F. P. GilYespie, Seftion Ch.,f, Safeguards Branch

/ ate D

Inspection Summary Areas Inspected: Facility Organization and Management of Material Control System.

The inspection involved 21 inspector-hours onsite by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the two areas examined during the inspection.

S-F2 80 F5 Copy of Copies 4

Pages This Doc'urcr.t is not to bo

  • P"# "

MAIEEE!.IIJ.FF*f7T D F 16a!iH can:s 2.niih,ms,71 0

89""

80 0 7160 ~737

,