. _ _
O OPERATING DATA REPORT i
DOCKET NO. 50-409 DATE 07-07-80 COMPLETED BY L.S. G000' l
TEi.EPilONE 608-689-2L.
l OPERATING STATUS
- 1. Unit Name: La Crosse Boiling Water Reactor Notes
- 2. Reporting Period: 0000, 80-01-06 to 2400, 80-30-06
- 3. Licensed Thermal Power (MWI):
165
- 4. Nameplate Rating (Gross MWe):
65.3
- 5. Design Electrical Rating (Net MWe):
50
- 6. Maximum Dependable Capacity (Gross MWe):
50
- 7. Maximum Dependable Capscity (Net MWe):
4R
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr.-to Date Cumulatise I1. Siours In Reporting Period 720 4,367 93,482
- 12. Number Of Hours Reactor Was Critical 539.5 3,621.9 61,427.4
- 13. Reactor Reserve Shutdown Hours 0
0 478
- 14. Hours Generator On-Line 502.1 3.493.0 56,497.8
- 15. Unit Reserve Shutdown Hours 0
0 79
- 16. Gross Thermal Energy Generated (MWH)
-65,131.2 469,525.7 7,754,306.2
- 17. Gross Electrical Energy Generated (MWH) 18.839 137.569 2,336,701
- 18. Net E!:ctrical Energy Generated (MWH) 17,357 128,587 2,161,322
- 19. Unit Service Factor 69.7 80.0 60.4
- 20. Unit Availability Factor 69.7 80.0 60.5
- 21. Unit Capacity Factor (Using MDC Net) 50.2 61.3 48.2
- 22. Unit Capacity Factor (Using DER Net)
_48.2 58.9 42.2
- 23. Unit Forced Outage Rate 27.8 7.1 6.4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
ESTIMATED REFUELING OUTAGE, ~ OCTOBER 10, 1980 (6 WEEKS)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Cort mercial Operation):
Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMER(I A L OPERATION pei-,
- 8007160$$\\
F NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE JUNE 1980 At the onset of the June 1980 reporting periou, power generation was continuing at 85%. Reactor Rated Thermal Power (38 MWe-Net).
This operating level has been scheduled to extend core life to stretch optimum production until refueling becomes necessary.
On June 2,198 0, the reactor was shutdown-in preparation for operator license examinations, which were conducted on June 3rd.
The reactor was first taken critical at 0924 arel the last test critical was achieved at 1139.
At 2110 on June 3rd, the turbine-generator was resynchronized to the DPC grid.
Power. escalation continued until June 6th when 85% Reactor Rated Thermal Pc.ier (38 MWe-Net) was achieved.
Power generation continued at this level until June 21st.
At 2121 on June 21st, the reactor sas manually shut down to repair a seal leak in Upper Control Rod Drive Mechanism No. 24.
The seal on Forced Circulation Pump 1A was also repaired while the plant was shut down.
At 1827 on June 28th, the reactor was brought to critical, but a scram occurred at 2038 with reactor power at 7 x 10-9 amps due to failure to upscale on Nuclear Instrument Channel No. 6.
At 2125 the reactor was returned to critical and at 2256 on June 29th, the turbine-generator was synchronized to the DPC grid.
Power escalation continued with 38% Reactor Rated Thermal Power (14 MWe-Net) being achieved by the end of the June reporting period.
Significant maintenance items performed during the June 1980 reporting period are indicated on the attached Instrument and Electrical and Mechanical Maintenance listings.
?
DOCKET NO. 50-fC9 UNIT SHU: DOWNS AND POWER REDUCTIONS UNIT NAME LACb 'R DATE
_7 30 REPORT MONTH JUNE 1980 COMPLETED BY E.S. Il000 MAN TELEPHONE 608-639-2331 3
h',?
j?
3 Yk Licensec
,E-r, Cause & Corrective Nt DJie 7
~g j
jg5 Event 3 '!
g0 Action to jE d
j;ji g Report a mO Prevent Recurrence g
6 80-04 06-02-80 S
24.2 E
1 NA ZZ ZZZZZ LICENSE EXAMINATIONS.
80-05 06-21-80 F
193.7 A
1 NA RB CRDRVE LACBWR was shutdown to repair a seal leak in Upper Control Rod Drive Mechanism No. 24. The seal on Forced Circulation Pump 1A was also repaired while the plant was shut down.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S. Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report ill R) File (NUREG-D Regulatory Restriction 4-Other i Explain) 0161)
E-Operatar Training & Uecuse Examination F-Administratise 5
G-Operational Esror (i.xplain)
Eslubit I - Same Source t9/77) li-Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-409 UNIT LACBWR DATE 07-07-80 L.S. GOODMAN COMPLETED 8y TELEPHONE 608-689-2331 MON 7w JUNE 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 38 38 37 2
28 is 38 3
I 38 I,
4 20 38 20 5
32 28
~
21 38 SHUTDOWN 6
22 7
38 SHUTDOWN 23 8
39 SHUTDOWN 24 39 25 SHUTDOWN 39 10 26 SHUTDOWN 38 SHUTDOWN 27 12 38 SHUTDOWN 28 13 38 SHUTDOWN 2,
34 38 13 3,
15 38 3
16 38 INSTRUCTIONS On this format list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
INSTRUMENT AND ELECTRICAL MAINTENANCE JUNE 1980 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION NUCLEAR INSTRUMENTATION PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETE TECHNICAL SPECIFICA-TION TESTS N-5 THRU N-9 liUCLEAR INSTRUMENTATION PREVENTIVE MR-3199 OUTAGE SUBSTITUTION INSTALLED POWER REPLACED N-1, N-2, H.V. POWER 80-05 REQUEST SUPPLY SUPPLY.
NUCLEAR INSTRUMENTATION PREVENTIVE MR-3196 0UTAGE NEW POWER SUPPLY CALIBRATION CURVE DISCRIMINATOR AND HIGH VOLTAGE 80-05 CURVE COMPLETED FOR N -
NUCLEAR INSTRUMENTATION CORRECTIVE MR-3157 OUTAGE OSCILLATOR DRIFT HIGH CALIBRATION ADJUSTED HIGH CALIBRATION FOR 80-04 POINT OFF N1 NUCLEAR INSTRUMENTATION PREVENTIVE NA TEST REQUESTED COMPLETED TESTS CALIBRATION TEST COMPLETED FOR CHANNEL N-1 AND N-2 SAFETY SYSTEM PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED SAFETY SYSTEM TECHNICAL SPECIFICATION TESTS FOR CHANNELS 1, 2, AND WATER N0. 3 RADIATION MONITORING PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED RALIATION MONITOR TECHNICAL SPECIFICATION TESTS.
CONTROL R0D DRIVES CORRECTIVE MR-3156 0UTAGE WATER LEAKAGE BLOWN FUSE REPLACED SCRAM SOLEN 0ID FUSE 80-04 FB-56(2)
CONTROL R0D DRIVE N0. 29 CORRECTIVE MR-3183 OUTAGE WATER LEAKAGE SHORTED PRESSURE REPLACED TRANSMITTER FOR AND MR-3184 80-05 TRANSMITTER CONTROL R0D DRIVE N0. 29 l
TURBINE OIL PUMP BREAKER CORRECTIVE MR-3197 OUTAGE LINKAGE HANGUP TRIP C0ll BURN 0UT REPLACED COIL AND TESTED AND MR-3155 80-04 BREAKER 1
ENVIRONMENTAL MONITORING CORRECTIVE MR-3159 NA NORMAL USAGE PUMP DEFECTIVE REPLACED AIR MONITOR PUMP m..
--e
l INSTRUMENT AND ELECTRICAL MAINTENANCE JUNE 1980 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION UNDERWATER LAMPS CORRECTIVE MR-3163 NA NORMAL USAGE BURNED OUT LAMPS REPLACED LAMPS ACID STORAGE TANK CORRECTIVE MR-3169 OUTAGE ACID EROSION PROBE T00 SHORT REPLACED PROBE 80-04 REACTOR FEED PUMP 1A CORRECTIVE MR-3175 NA NORMAL USAGE DRIVE ISOLATING REPLACED CONTROL DRIVE MOTOR FUEL LEVEL GAUGE -
CORRECTIVE MR-3135 0UTAGE USAGE HAND PUMP DEFECTIVE REPLACED HAND PUMP WITH 1B DIESEL GENERATOR 80-05 STATION AIR SYSTEM FUEL MOVEMENT TENSIOMETER PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETEC PRE-0P TEST FOR TENSIOMETER
~
DIESEL GENERATOR 1A AND 18 PREVENTIVE NA TEST DUE COMPLETED TESTS COMPLETED MEGGER TESTING MAIN STEAM 15JLATION VALVE CORRECTIVE MR-3176 0UTAGE NORMAL USAGE IN0PERABLE REPLACED POTENTIOMETER INDICATOR 80-05 INDICATION SHUTDOWN CONDENSER DRAIN CORRECTIVE MR-3208 OUTAGE INCORRECT VALVE IN0PERABLE CONNECTED CIRCUIT IN DIRECT VALVE 80-05 INSTALLATION IN SOME CASES PARALLEL PATH TURBINE ROTOR STOP ALARM CORRECTIVE MR-3215 NA CONTAMINATION SWITCH IN0PERABLE CLEANED PIV0T POINT ON SWITCH
MECHANICM. MAINTENANCE JUNE 1980 LER OR NATURE OF OUTAGE SALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION TRAVELING SCREEN CORRECTIVE MR-3168 NA DRIVE CHAIN BROKE WOULDN'T RUN REPLACED CHAIN LINK CIRCULATION PUMP SEAL CORRECTIVE MR-3162 NA MECHANICAL SEAL LEAKS EXCESSIVELY CLEANED AND READJUSTED WATER PUMP 18 DRAGGING FUEL ELEMENT STORAGE WELL FACILITY CHANGE NA NONE NA WELDED SEISMIC PADS ON RACKS FUEL RACKS 79-20, MR-3173 CONTAINMENT BUILDING PREVENTIVE NA GETTING DIRTY INCREASED AP REPLACED PREFILTERS EXHAUST FILTERS MAINTENANCE MR-3149 1A REACTOR FEED PUMP CORRECTIVE MR-3175 NA F0AMING REDUCED LUBE CHANGED OIL PROPERTIES FUEL HANDLING GRAPPLE PREVENTIVE NA CABLE STRANDS SNAGS GLOVES REPLACED CABLE MAINTENANCE BROKEN MR-2588 TURBINE BUILDING FIRE FACILITY THANG)
NA NOT CORRECT RATING WILL ROT REPLACED H0SES HOSES REPAIR H0LES IN FUEL FACILITY CHANGE NA H0LES WERE WOULD LEAK WATER WELDED PATCH OVER EP0XY ELEMENT STORAGE WELL LINER 58-80-1, MR-3179 PREVIOUSLY DRILLED INJECTION H0LES IN LINEP.
lA FORCED CIRCULATION CORRECTIVE M -3190 OUTAGE EXCESSIVE WEAR EXCESSIVE LEAK 0FF REPLACE SEAL PARTS PUMP SEAL 80-05 REMOVED 7 LOWER CONTROL PRECAUTIONARY OUTAGE
@NE NA TO REMOVE UPPER CONTROL R00 R0D DRIVE MECHANISMS MR-3194 80-05 DRIVE MECHANISM NO. 24
MECIIANICAL MAINTENANCE JUNE 1980 LER OR NATURE OF OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE hUMBER CAUSE RESULT CORRECTIVE ACTION TUilNEL AIR ACTIVITY PREVENTIVE NA NORMAL WEAR WORN BELT REPLACED BELT
'40NITOR MAINTENANCE MAIN AIRLOCK OPERATING CORRECTIVE MR-3154 OUTAGE WEAR BROKEN LINK REPLACED LINK
^HAIN 80-04
- 10. 3 FEEDWATER HEATER CORRECTIVE MR-3111 OUTAGE AGE STEAM LOCK REPLACED GASKET RELIEF VALVE FLANGE GASKET 80-04
~4AIN AIRLOCK OPERATING PREVENTIVE OUTAGE WEAR SHAFT KEY WORN REPLACED KEY IN SHf.FT SHAFT MAINTENANCE MR-3151 80-04 FXCESSIVELY 3IL LEAK ON TURBINE INTER-CORRECTIVE MR-3100 OUTAGE LOOSE BOLTS LEAKED OIL TIGHTENED BOLTS CEPT VALVE OPERATOR 80-04 5 PARE CONTROL R0D DRIVE PREVENTIVE NA AGE NA REPLACED BLADDER AND 0-RINGS CHARGING SYSTEM ACCUMULATOR MAINTENANCE HEALTH PHYSICS SAMPLE FUME PREVENTIVE NA AGE WORN BELT REPLACED BELT HOOD BLOWER MAINTENANCE FUEL ELEMENT STORAGE WELL FACILITY CHANGE NA AGE LEAKAGE PUMPED EP0XY IN SPACE BETWEEN (FESW) 58-80-1, MR-3161 FESW LINER AND CONCRETE WALL REPAIR HIGH RADIATION CORRECTIVE NA WEAR SAGGING WELDED HINGE ON BARRIER GATE TO PURIFICA-MR-3160 TION AREA WASTE DISPOSAL BUILDING PREVENTIVE NA WEAR LOOSE BELT TIGHTENED EXHAUST FAN MAINTENANCE WASTE WATER FLOW CORRECTIVE NA DEBRIS PLUGGED NO FLOW CLEANED SCREEN TOTALIZER MR-3167 SCREEN
~
MECHANICAI, f4AINTEMANCE JUNE 1980 LER OR NATURE OF OUTAGE MALFUNCTI0fl EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION UPPER CONTROL R0D DRIVE CORRECTIVE MR-3190 CUTAGE WEAR LEAKAGE REPLACED SEAL AND OTHER WORN MECHANISM NO. 24 80-05 PARTS I
1B WASTE WATER PUMP PREVENTIVE OUTAGE NORMAL WEAR LOW PUMP PATES REPLACED IMPELLORS AND CASING MAINTENANCE 80-05 MR-3197 FUEL ELEMENT STO'. AGE WELL FACILITY CHANGE NA NONE PROCEEDING WITH INSTALLATION FUEL RACKS 79-20 1A WASTE WATER PUMP CORRECTIVE MR-3193 OUTAGE WEAR SEAL SHOT REPLACED MECHANICAL SEAL AND 80-05 SHAFT SLEEVE 1A SHUTDOWN CONDENSER CORRECTIVE MR-3207 OUTAGE WEAR SEAL RINGS ON INSTALLED NEW PISTON PACKING STEAM INLET 80-05 PISTON OPERATOR LEAK AND WILL NOT OPERATE l