ML19320C339
| ML19320C339 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 07/09/1980 |
| From: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19320C340 | List: |
| References | |
| MP-1-1564, NUDOCS 8007160676 | |
| Download: ML19320C339 (1) | |
Text
,.
NORTHEAST IFrlf-TTIES 3
- %:"n2%;~?!"J:T~
$0 y,o*pE. CONNECTICUT 06101 n
.::,3::::
";MC**~
ao:n seuen L
L
'::= -l' ;:l" '..*l0; July 9,1980 MP 1564 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Connission Washir.gton, D. C.
20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Also enclosed is a corrected copy of the May operating data report page with the corrections noted in parenthesis. The original May operating data report page was in error due to a watt-hour meter that was not returned to its original reading after its calibration.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
~%d&gx l
)
E. J. Mroczka Station Superintendent liillstone Nuclear Power Station EJM/GRH/kaf
Enclosures:
(1) cc: Director, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C.
(10)
U. S. Nuclear Regulatory Commission, c/o Document Management Branch, Washington, D.C.
20555 k
N
'd s
8007180676