Std Order for DOE Work: Sys Interaction Support for Diablo Canyon, Issued to Lll
ML19320C190
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/01/1980
From: Bernard Grenier
NRC OFFICE OF STANDARDS DEVELOPMENT
To:
Shared Package
ML19320C185 List:
References
CON-FIN-A-0248-0, CON-FIN-A-248 NUDOCS 8007160395
Download: ML19320C190 (6)


Text

6

',* -.~ ;. ~. %.;..;.:f'*:.ry,*iq s.

m h

v

! N R C.. +.v 173 u s Nuci t AH RE GUL A TOR Y COMMISSION ORDE R NUMBE R

. :ai 20-80-229 DATE STANDARD ORDER FOR DOE WORK 7/l/80 ISSUE D TO iCOE Cit.cei ISSUE O BY. INRC ottwei ACCOUNTING CIT ATION Division of Systems Integration Aaaaoeasa r.os s <Muoi.

San Francisco Coerations Office Office of Nuclear Reactor 31X0200.200 Regulation as a ~uM et.<

i *E aFORuiNG oaG ANi2ATicN ANO LOCATies 2n-19-05-09 l

F is NuMest a l Lawrence Livermore Laboratory, Oakland, California A0248 - 0 L__.

WOR K PERICO - THas ORDER I fin TITLE FixEO L

'ESTiM ATED Ej

'd Systems Interaction Support for Diablo Canyon Fai/1/80 9/30/80 l

OBLIG ATION AV AILABILITY PROvlDED BY:

a t., o, n i.4 S20,000

!OT AL Of OHOE,HS PL ACt O P AsOH TO TMsS O A T E WsTH IME Pt HF CHMING C AGANf 2 ATION ri uNot s :~e sA. i.Tt O uoveArascosi A rioN SvMeat ANO T~e FIRS r F OUs OiGi TS oF rHe S

3>046>000 ru Never w c

~

c TcT AL CRcENS To OATE iToTAt A a 88 5 3,066,000 is AveuNT INCLUDE D IN ' C" APPLiC ABLE TO THE fin NvMBE R" CITE O IN IHaS OHOE R S

20,000 FiNANci AL i LE s.d LITT L ruNa..4L:. NOT 8E HEPROCH AMMEO BE TAE EN FINS LINE O CONSTITU TES A LiMs TATICN CN 08 LIGA sNS Av in JHi2E O O F JNOS \\tA y SE REP 90GR AMME D NOT TO EXCE ED 10.0F fin LEVEL UP TO S50K. LINE C CONSTITUTES A LIMITATION CN OFLIGAT CNS AUTnCRi2EO

. - f* +

STANDARO TERMS AND CONDITIONS PROVICEO 00E ARE CONSIDERED P ART OF THIS OROEH UNLESS oTHERWISE NoTEO.

A T T ACHYENTS THE FCLLOWiNG ATTACHME NTS ARE ME RE 8Y SE CURIT Y MACE A #AH T OF THIS CHCE R

$ WORK CN THIS CROER IS NOT CLASSIFIED

)" STATEVENT OF ACH A C AOnn ON THIS OPOER INVCLVES CL ASSiFIED

-' AOOitiGN AL TE RMS AND CONDITIONS INFORVATICN NRC FORM 187 IS A TT ACHEO

. of-eR t.

REMAans Af ter signature, please send to the NRC Office of the Controller, ATTN:

D. Dandois

~

and provide a copy of this order to the Office of Nuclear Reactor Regulation, ATTN:

P. Triplett NRR, P-428 l

'.'*N A

s l~.

i

()

f/IssulmG f UTHORITY l

ACCEP flNG ORGANIZATION 3, gor eni pp's h 1 [/

r

.A,,

s,u s. i u m.

~ Berna ft T--

Tec'hnical Assistance Program Manager NRCecow its.: mi 8007160395

PROPOSAL CONTEf4T The minimum items required in all proposals are:

1.

Performing organization's name and location.

2.

FIN Title, FIN Number, and B&R Number (NRC's) (as on statement of work).

3.

Perfonning organization's key personnel, program manager, or principal investigator, their resumes and FTS phone number.

4.

Background (definition of the problem including the objective (s) to be attained).

5.

Work to be performed (Provide a concise description of tasks to be perfonned and expected results for the period of performance. Note i

technical data requirements, potential problems, and other technical information needed to fully explain the effort. Highlight changes from prior authorized 50W's, if any, identify changes in perfonnance, schedule, or costs).

6.

Identify major subcontracts, including consultants.

7.

Costs estimated to be incurred by DOE contractors, subcontractors, and censultants. _Qst by fiscalmar_to_c_omol_etion:

a.

Manyears of Technical Support (MTS) b.

Costs:

i (1)

Direct Salaries (Labor) for MTS (2) Material and Services (excluding ADP)

(3) Total ADP Support (4)

Subcontracts (5) Capital Equipment (6) Direct Travel Expense (Foreign travel must be shown separately)

(7) General and Administrative Expense (Include indirect labor cost) c.

Total Estimated Cost:

8.

Forecasts:

a.

Milestone Chart for accomplishing the work.

l j

2-b.

Planned monthly rate of-costs by fiscal year.

This may be provided with the first report of an authorized program if not known at time of proposal submittal. At the beginning of each subsequent year, reports should include the planned monthly rate of costs for the ensuing year.

9.

Conflict of_ Interest:

-In order to assist the Commission in its evaluatien, the DOE Contracting Officer shall describe any significant ccntractual and organizational relationships of the DOE, its contractor, their employees, or expected

. subcontractors or consultants on this proposal, with industries regulated by the i;RC (e.g. utilities, etc.) and suppliers thereof (e.g. architect engineers and reactor manuf acturers, etc.) that might give rise to an apparent or actual conflict of interest.

10.

Reporting Requirements (as on statement of work).

9 4

4 9

e

ENCLOSURE 3 STATEMENT OF WORK TITLE:

EVALUATION OF DIABLO CANYON SYSTEM INTERACTION STUDY FIN No: A0248 B&R No:

20-19-05-09 Tech'nical Monitor:

C. Thomas (FTS 492-7745)

Cognizant Branch Chief:

John F. Stolz (FTS 492-7391)

Background

The Office of Nuclear Reactor Regulation is developing a systems interaction program which proposes to define and subsequent imolement, systems interaction regulatory requirements and guidance on selected light water reactor plants.

This objective is derived from Section II.C.3 of the Action Plan in NUREG-0660.

The systems interaction evaluation for the Diablo Canyon plant is part of this program and is specifically described in Secticn II.C.3 of the Action Plan.

Objective The objective of this project is to assist the NRC staff in its evaluation, and

-' walk-through" audit of the Diablo Canyon olant regarding the possibility of detrimental seismically-induced interactions between safety-related equipment and non-seismically qualified equipment.

Work Reouirements Estimated Level of Effect estimated at 0.2 man-years for FY '80.

Projected Comoletion Date Task 1.

Review of applicant's submittals July 7,1980 (currently these are dated v y 7 &

a 27, 1980; and June 10,1980).

Task 2.

Participate in NRC staff reviewers audit July 7, 1980

" walk-through" at the Diablo Canyon site.

Task 3.

Conruit with the NRC staff regarding review August 8, 1980 questions and the staff's final safety evaluation scheduled for issuance in August 1980. Emphasis will be on failure criteria and methods used to justify these cases where no failures are predicted to occur. for selected non-seismic components durinc a design basis earthquake.

4

c

- Task 4 Attend September 1980 ACRS meeting on this September 30, 1980 review of the Diablo Canyon systems interaction evaluation.

Total Level of Effort and Period of Performance Approximately 0.2 man-years will be needed in FY '80, over a 3 month period (July 1, 1980 to September 30,1980).

Reoortino Recuirements l.

At the comoletion of tais project, provide a letter report summarizing the assistance provided to.'IPC to the cognizant Branch Chief.

2.

A monthly business letter will be submitted by the 15th of the month to the cognizant Branch Chief with a copy to the Technical Support Branch, ATTN:

3. L. Grenier and L. Rubenstein, OSI.

These reports will contain the following information related to accomplishment of this program.

Summary of the progress and work completed during the period, including milestones reached or, if missed, an explanation provided; The amount of funds expended for manpower and computer services during the period and cumulative to date; If problems are encountered or anticipated, a description of the plans for their resolutuion, the schedule of their implemen-tation and their impact on the overall program; Plans for cne next recorting period.

Meetirgs and Travel-One 3-day meeting with the applicant at the Diablo Canyon site; four one-day meetings with the NRC staff including one meeting with ACRS Subconnittee and one reeting with the full ACRS.

NRC Furnished Materials (1) A copy of all applicant's submittals for NRC review (including those noted in Subtask 1).

(2) A copy of the applicant's loose leaf Diablo Canyon Systems Interaction Program reviewed by the NRC as part of the plant audit (to be returned to NRC).

-' g.

3_

r (3)- FSAR material & -related plant information required for review.

(4) A copy of all correspondence regarding the Systems Interaction review of

- the Diablo Canyon plant, including the staff's-safety evafuation report