ML19320C130

From kanterella
Jump to navigation Jump to search
Notification of Contract Execution,Mod 2 to Consulting Svcs in Connection W/Nrc Antitrust Hearings. Contractor: Barbay Engineers
ML19320C130
Person / Time
Issue date: 07/02/1980
From: Shew D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Harold Denton, Toalston A
Office of Nuclear Reactor Regulation
Shared Package
ML19320C131 List:
References
CON-FIN-B-1119, CON-NRC-03-76-272, CON-NRC-3-76-272 NUDOCS 8007160208
Download: ML19320C130 (1)


Text

  • U. 5. GGvE?tNVENT PR;NTING OF F%E 197b + 201-T46

(

Ibh

__A

' 9

",fg,,"

.".~}- h " [ } y NRC FORM 255-AT(49-24)-0272 DIVISION OF CONTRACTS MODIFIC ATION NUMBER U.S. NUCLE AR REGUL ATORY CCMMISSION Two (2)

WASHINGTON, D.C. 70555 D NEw D r.'ODIFIC ATION OTHE R ISpecotyl NOTIFICATION OF CONTRACT EXECUTION CONTR ACT BASED ON:

To:

Harold R. Denton. Dfrector AUTHOR 62ATION ro*ABER I Titiel Of'fice of Nuclear Reactor Regulation DATE (Organgatoon)

FROM:

Debbie Shew 7/2/80

$1,000 deobligated and contract is closed out.

Technical Assistance Contracts Branch DI'!!SION OF CONTRACTS, ADM CONTR ACTOR Inane & Location)

EXECUTION DATE Barbay Engineers 7/2/80 Baton Rouge, LA TYPE OF CONTRACT Time and Material PROJE CT TITLE PERIOD OF PERFORM ANCE

" Consulting Services in Connection with NRC 4/20/76 - 6/20/77 Antitrust Hearings" PRINCIPAL INVESTIG ATOR NRC AUTHORIZED REPRESENTATIVE Argil Toalston

,B&R NUMBE R FIN NUM'BE R 02-19-03 RlllQ NEW NRC FUNDS DE0BLIGATE S 1,000 FUNDING TOTAL FY 7 FUNDING S ----

O TOTAL NRC OBLIGATIONS S0 fiOVE HNVENT PROPE R TY A TT ACH *.iE N T (S)

CONTR ACT DOCUMENT e nw., oR.m,.

1

.,y

'8007160 f

-rN

-.n M

-m m; __-

      • sv_

"P-

    • s

.a W-