ML19320B989

From kanterella
Jump to navigation Jump to search
Forwards LER 80-016/03L-0
Date released: 11/30/2019 Download: ML19320B989


LER 80-016/03L-0:on 800611,during Hydrogen Purge Sys Surveillance Testing,Proper Sys Flow Could Not Be Obtained. Caused by Rust Scale Lodged in Check Valves.Check Valves Cleaned & Reassembled
ML19320B991
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/10/1980
From: Bramlett L
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19320B991 (1)
Forwards LER 80-016/03L-0
ML19320B988
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 07/10/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19320B988 (1)