ML19320B919

From kanterella
Jump to navigation Jump to search
Forwards Recovery Operations Plan Change Request 2 Re Auxiliary Bldg & Fuel Handling Bldg Ventilation Sys Surveillance Requirements
ML19320B919
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/08/1980
From: Hovey G
METROPOLITAN EDISON CO.
To: Snyder B
NRC - NRC THREE MILE ISLAND TASK FORCE
Shared Package
ML19320B920 List:
References
TLL-320, NUDOCS 8007150499
Download: ML19320B919 (1)


Text

=

m Metropolitan Edison Company F )

Post Office Box 480 3

Middletown, Pennsylvania 17057 717 944 4041 Writer's C ect Dial Number July 8, 1980 TLL 320 TMI Program Office Attn:

Mr. Bernard J. Snyder, Program Director U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

Three Mile Island Nuclear Station, Unit II (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Recovery Operations Plan Change Request No. 2 Enclosed is Recovery Operations Plan Change Request No. 2, concerning surveillance requirements of the Auxiliary Building and Fuel Handling Building Ventilation Systems. This change request is made to change the ventilation system flow rate requirements during testing subsequent to the removal from service of the Supplementary Ventilation System.

Sincerely, G. K. Hovey Director, TMI-II GKH:LJL: dad Enclosure cc:

J. T. Collins D. DiIanni H. Silver R. Reid V. Stello B. H. Grier m

h\\\\

e= = E __c_ _. _ e_