ML19320B833
| ML19320B833 | |
| Person / Time | |
|---|---|
| Site: | 07002609 |
| Issue date: | 07/01/1980 |
| From: | Hind J, Kniceley J, Pirtle G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19320B830 | List: |
| References | |
| 70-2609-80-01, 70-2609-80-1, NUDOCS 8007150096 | |
| Download: ML19320B833 (1) | |
Text
r U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III Report No. 70-2609/80-01 Docket No. 70-2609 License No. SNM-1802 Safeguards Group IV SNM-1833 Licensee: Commonwealth Edison Company P.O. Box 767 Chicago, IL 60690 Facility Name: LaSalle County Nuclear Station, Units 1 and 2 Inspection At: LaSalle Site, Marseilles, IL Inspection Conducted: June 24, 1980 Date of Last Physical Security Inspection: October 11, 1980 Type of Inspection: Unannounced Ptysical Security hh,
6l'3OlWO Inspectors:
G. L. PirBle Date Physical Security Specialist Ga n W L,. o~
chin (j R. Knicelcy y
Date Physical Securit/ Specialist Approved By:
M.,
7/
8 (8. A. Hind, Chief Date Safeguards Branch Inspection Summary Areas Inspected:
Included a review of Security Procedures; Security Or-ganization; Physical Barriers; Access Controls (Fuel Storage Area); Communi-cations; Response; Recorda and Reports and Followup on Previous Items of Noncompliance. The inspection involved ten inspector hcurs onsite by two NRC inspectors. The inspection began during the day shift period; no inspection hours were accomplished during offshift periods.
Results: The Licensee was found to be in ecmpliance with NRC requirements within the eight areas examined during this inspection.
(Details Part 2.790(d) Information)
S-F3 I O Copy of Coples
____,FNes.
a mmr 1S NOT 70 as
-ib00 5 0 oM EPRCOUCCD WITHOUT SPECIFIC APPRO7AL OF RIII
.)