ML19320B712
| ML19320B712 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Hatch |
| Issue date: | 06/05/1980 |
| From: | Verrelli D Office of Nuclear Reactor Regulation |
| To: | Zudans J Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8007140641 | |
| Download: ML19320B712 (1) | |
Text
-
'8%
g{
.c UNITED STATES
(.
,, q NUCLEAR REGULATORY COMMISSION r, pl g (/j/
3 n,
[h") ]
WASHINGTON, D. C. 20555 g,
t+
v4 977 3#
June 5, 1980 3 L Ce MEMORANDUM FOR: John Zudans, EQB, Division of Engineering FROM:
D. M. Verrelli, Project Manager, ORB #4, Division of Licensing
{
SUBJECT:
"LONG TERM MECHANICAL OPERABILITY OF PURGE AND VENT VALVES" Ref: Memo, Rosztocay, EQB, to Varga, ORB #1, same subject, May 23, 1980 1.
At the request of E. Reeves, I am providing, as tabulated below, dates of licensee responses to our generic letter of September 27, 1980.
Peach Bottom 2/3 10/25/79 Hatch 1/2 11/15/79 2.
Please note that the referenced memo implies a requirement beyond the scope of our request, i.e., that all licensees should submit reports on their valve operability program. Such a report is required only for thase plants that desire to justify unlimited purging (see our letter of 11/29/78). Accordingly, this position does not apply to Peach Bottom and Hatch.
4 M-D. M. Ve relli, Project Manager Operati g Reactors Branch #4 Divisi n of Licensing cc:
E. Reeves 8007140gj
.