U.
Appendix A NOTICE OF VIOLATION Union Electric Company Docket No. 50-483 Based on the results of the NRC inspection conducted April 7-25, 1980, it appears that certain of your activities were not conducted in full compli-ance with NRC requirements as noted below. This item is an infraction.
10 CFR 50, Appendix B, Criterion III and SNUPPS PSAR paragraph 17.1.3, re-quires that applicable regulatory requirements and the design basis.
are correctly translated into specifications, drawings, procedures, and instructions.
SKUPPS PSAR Chapter 3, Design of Structures, Components, Equipment and Systems Table 3.2-1, refers to ASME Section III as a principal construc-tion code. ASME Section III, Subsection NF, requires that material greater than 1 1/2 inches in thickness be pre-heated to 200*F.
Contrary to the above, piping hangers and restraints have been welded to structural members greater than 1 1/2 inches in thickness using a preheat of 60 F as specified on the weld control record form.
80071406Mk