i h Nh 7 1 :
9 consumers s
b Power
("" fjg company p
i DJ la General offices: 212 West Michleen Avenue. Jackson, Michleen 49201 + (517) 758-0650 July 9, 1980 Mr James G Keppler Office of Inspection and Enforcement Region III US Nuclear Regulatory Cc= mission 799 Rcosevelt Road Glen Ellyn, IL 60137 DOC'GT 50-155 - LICENSE DPR 3IG ROCK POINT PLANT - RESPCNSE TO IE BULLETIN 80-08 EXAMINATION OF CONTAI: BENT LINER PENETRATION WILDS Consumers Power Company's response to IE Bulletin 80-08, Examination of Contain-ment Liner Penetration Welds, dated April 7, 1980 is as follows:
Item 1 Eetermine if your facility contains the flued head design for penetration connections, or other designs with containment boundary butt veld (s) between the penetration sleeve and process piping as illustrated in Figure NE 1120-1, Winter 1975 Addenda to the 197h and later editions of the ASME 3&PV Cede.
Restonse to Item 1 The Big Rock Point Plant contains the folicving types of mechanical penetrations as described above:
A) Total Penetrations:
11h
- 3) Flued Head Design Penetrations:
O C) Butt Welded (piping):
35 D) Electriesl Penetrations:
L8 E) Socket Welds:
19 8
F) Miscellanecus:
12 ID 8007140WY
2 Item 2 If an affirmative ansver-is reached for Item 1, determine the following:
A) Applicability of the ASME Code including year and addenda and/or Regulatory Guide 1.19, B) Type of nondestructive examinations performed during construction, C) -Type of veld joint (including pipe material and size) and whether or not backing bars were used, D) Results of construction nondestructive examinations, i.e.,
if repairs were required, this should be identified including extent of repairs and description.of defects encountered during repair, if known.
Response to Item 2 A) The containment structure at the Big Reck Point Plant was designed in accordance with the requirements of the ASME Code,Section VIII,1959 Edition, per the Big Rock Point FHSR, Section 3.2.3.
Reg. Guide 1.19 was not in effect during the design and construction of the Big Rock Point Plant and does not impact the design / inspection of the penetrations.
B) No NDT required during construction.
C) See Attachment 1 D) There are no records of repairs made to these velds.
Item 3 For.those facilities committed during construction to perform volumetric examination of such penetrations through SAR co=mitments waich have not performed radiography, justify not performing radiography or submit plans and schedules for performing radiographic exa=inations.
Response to Item 3 The Big Rock Point Plant had no committment to perform radiographic exsmina-
~
tions of the subject velds.Section VIII, paragraph UW-11a(5), as referenced above exempts from radiographs examinations all joints in ro::les which do not' exceed 1-1/8" in vall thickness.
~
David P Hoffman (Signed)
David P Hoffsan
-Nuclear Licensing Adninistrator CC ? Director, Office of Nuclear Reactor Regulation Director, Cffice of Inspection and Inforcement Director, Division of Reactor Construction Inspection Resident Inspector - Big. Rock-Point-pages;
~I" Bullstin No. 80-08 Attschment 1 TABLE OF pENETRATICNS Penetration No penetration Type Pipe Size Material Backing Bar 1
Equipment Lock 12'-0" CS/CS No 2
Personnel Lock 7'-7" CS/CS No
.3
' 2mergency Escape Lock 5'-6" CS/CS No
~
h
' Manhole 2h" CS/CS No 5
Eliminated CS/CS No 6
Eliminated CS/CS No 7-C 2h" CS/CS No 8
C 2h" CS/CS No 9
D 1h" CS/CS No 10 A
12" CS/CS Yes 11 A
10" CS/CS Yes 12 A
10" CS/CS Yes 13
-A 10" CS/CS Yes lh A
h" CS/CS Yes 15 3
2" CS/CS No 16 Spare CS/CS No 17 C
Treated Waste CS/CS No 18 E
2" CS/CS No 19 3
3" CS/CS No 20-23 Socket Welds CS/CS No 2h Spare CS/CS No 25 Socket Welds CS/CS No 26 C
6" CS/CS No 27 C'
h" CS/CS Ho 28 C
6" CS/CS No 29L C
6" CS/CS Ho 30 Spare CS/CS No 31 Spare CS/CS No 32 Spare CS/CS No 33 Spare CS/CS No 3h Spare CS/CS No 35 B
CRD Supply CS/CS No 36 C
6" CS/CS No 37 3
6" CS/CS No 38 Spare CS/CS No 39 Spare CS/CS No h0-87 Electrical.
88-99 Socket Welds CS/CS No 100 Lighting
- 3" CS/CS No 101 Telephone
- 3" CS/CS No 102 Spare
- CS/CS No 103.
Spare
- CS/CS No 10h Lightins**
3" CS/CS Ho 105 Telephone **
3" CS/CS No 106 Spare **
3" CS/CS No 107 Sp are **
CS/CS No 108 Lighting ***
3" CS/CS No 109-111 Spare ***
3" CS/CS No 112 C.
2".
CS/CS No 113 C
k" CS/CS No o-
IE Bulletin No. 80-08 Attachm;nt 1 Continued 2
TABLE OF PENETRATIONS Penetration No Penetration Tyre Pite Si2.s Material Backing Bar lik Manhole 24" CS/CS
.No Located in Equipment Lock Located in Personnel Lock Located in' Emergency Eccape Lock NOTE: ?/pe A Penetration is an expansion bellows Type 3 penetration is a semi-head cap with adjoining sleeve Type C penetration is a pipe spool piece Type D penetration is a semi-head cap with adjoining sleeve Type I penetration is sleeve with a flange fitting i
i e
+
--,y