Submits Addl Response to IE Bulletin 79-18,Audibility Problem Encountered on Evacuation of Personnel from High Noise Areas. Installation of Speakers for Evacuation Signals Will Be Completed by 800915
ML19320B083
Person / Time
Site: Pilgrim
Issue date: 06/27/1980
From: Andognini G
BOSTON EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
80-122, IEB-79-18, NUDOCS 8007090266
Download: ML19320B083 (2)


Text

er

  • gs BOSTON EDisDN COMPANY acNan6 omcss som sOvtsTOm svare?

S OS TON. Bd ASS ACMWSETTs c219 9 G. Camb ANDOSNING S u mt si p*T E N D E N T seuCLEAN OpgaateONS DE*AmfutNT June 27, 1980 BECo. Ltr. #80- 122 Mr. Boyce H. Grier, Director

' Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA.

19406 License No. DPR-35 Docket No. 50-293 IE Bulletin #79-18 Report Following Refueling Outage Ref. (a) BECo. Letr. (G. ' C. Andognini) to NRC (B. H. Grier) titled " Response to IE Bulletin #79-18" dated November 23, 1979

Dear Sir:

In accordance with the requirements of IE Bulletin #79-18, an audibility survey on the alarm / evacuation system was conducted at Pilgrim Nuclear Power Station.

Reference (a) provided you with the findings of those surveys performed and included a list of areas to be surveyed during our refueling outage. This letter provides you with a report on the results of the outage survey and a schedule for completion of corrective actions in this area as delineated below.

All necessary repairs to equipment in areas found inaudibic were performed during the outage.

Ten areas were identified as needing additional measures for adequate audibility (Attachment.A). Five of these are High Radiation areas and current administrative controls require a two man team for entry. The second man remains outside the area and would alert the other should evacuation be necessary. Therefore, no further corrective actions are planned for these areas.

The other.five areas require the installation of speakers to provide adequate audibility evacuation signals. Installation of these speakers will be completed by September 15, 1980.

We trust this letter adequately addresses your concerns. However, if you should have any questions concerning this response, please contact us at your convenience.

b Very truly yours,

- 8007090MG Q

$x wu cc: Director, Division of Operating Reactors

o

~

1 ATTACHMENT A AREAS NEEDING SPEAKERS 1.

Reactor Water Clean op Holding Pump Room 2.

Reactor Water Clean-up Pump Room 3.

Administration Building HVAC Room 4.

Treated Waste Hold-up Tank Room 5.

Clean Waste Receiver Tank Room AREAS CONTROLLED BY TWO FAN ENTRY 1.

Chemical Waste Receiver Tank Room 2.

Backwash Receiver Tank Room and Pump Room 3.

Reactor Water Clean-up Filter Demineral;'.zer l

4.

Fuel Pool Filter Demineralizer Room 5.

Sludge Tank Room e

a k

.. _ -