MEETING SUMARY ' DISTRIBUTION

-Licensee:

Baltimore Gas & Electric Company O

H. Denton E. G. Case Docket File QRMy L VUK R. Purple TERA NSIC

.0RB#4 Rdg NRR Rdg DEisenhut RTedesco TNovak Glainas ORB Branch Chiefs (5)

ORB Project Manager - C. Li ORB Licensing Assistant OELD AE0D IE-3 RFraley, ACRS-16 Program Support Branch Meeting Summary File NRC Participants M. Conner L. Gesalth A. Saeed

0. Chopra N. Trehan F. Rosa 1

S. Rhow C. Li

'""*o W7

P

o

\\

gfgeMag m

UNITED STATES g

g NUCLEAR REGULATORY COMMISSION t,

(;

WASHINGTON, D. C. 20555

%,......o#

June 18, 1980 Docket No. 50-317 318 LICENSEE: Baltimore Gas & Electric Company (BG&E)

FACILITY: Calvert Cliffs Nuclear Power Plant Units No.1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 5,1980 WITH BALTIM0RE GAS & ELECTRIC COMPANY CONCERNING THE OFFSITE POWER SOURCES FOR THE CALVERT CLIFFS PLANT A meeting was held at Bethesda, Maryland on June 5,1980 to discuss the offsite power sources for the Calvert Cliffs Nuclear Power Plant. Represent-atives from Baltimore Gas & Electric Company and the NRC staff were in attendance. A list of attendees is enclosed.

This meeting was requested by BG&E to obtain a staff interpretation to the Technical Specification. The concerns were:

First, is the Technical Specification about using Southern Maryland Electric Cooperative (SMECO) 69KV line as a backup offsite power source for the plant explicit enough?

Second, is the manual switching to use the SMEC0 line adequate in regards to its reliability?

The questica about capacity adequacy was brought up by the NRC staff and answered by BG&E. After extensive discussions, the staff agreed that the conclusions in the Safety Evaluation for the license amendments are still valid. These conclusions are that: (1) the SMEC0 line used as a backup offsite power source does satisfy General Design Criterion 17 (GDC 17) of 10 CFR 50 Appendix A, and (2) the capacity of the system is sufficient to operate a full complement of essential auxiliaries for one reactor under LOCA conditions and the equipment necessary to attain and maintain a safe shutdown in the remaining unit. As a backup power source, it does not have to meet auto-switching criterion.

The NRC staff concluded that the system meets the safety requirement, and agreed to look into the adequacy of Technical Specification. We agreed to provide some suggested Technical Specification for BG&E early in the week of June 9-13.

Cbf fy &

C. Y. Li Operating Reactors Branch #3 Divisicn of Licensing cc w/ enclosure:

See next page

Baltimore Gas and Electric Company CC:

James A. Biddison, Jr.

Mr. Bernard Fowler General Counsel President, Board of County G and E Bullding Commissioners Charles Center Prince Frederick, Maryland 20768 Baltimore, Maryland 21203 Director, Technical Assessment George F. Trowbridge, Esquire Division Shaw, Pittman, Potts and Office of Radiation Programs Trowbridge (AW-459) 1800 M Street, N.W.

U. S. Environmental Protection Agency Washington, D. C.

20036 Crystal Mall #2 Arlington, Virginia 20460 Mr. R. C. L. Olson Baltimore Gas and Electric Company U. S. Environmental Protection Agency Room 922 - G and E Building Region III Office Post Office Box 1475 ATTN:

EIS COORDINATOR Baltimore, Maryland 21203 Curtis Building (Sixth Floor)

Sixth and Walnut Streets Mr. Leon B. Russell, Chief Engineer Philadelphia, Pennsylvania 19106 Calvert Cliffs Nuclear Power Plant Baltimore Gas and Electric Company Ralph E. Architzel Lusby, !!aryland 20657 Resident Reactor Inspector NRC Inspection and Enforcement Bechtel Power Corporation F. O. Box 437 ATTN: fir. J. C. Judd Lusby, Maryland 20657 Chief Nuchar Engineer 15740 Shady Grove Road Mr. Charles B. Brinkman Gaithersburg, Maryland 20760 Manager - Washington Nuclear Operations Combustion Engineering, Inc.

C-E Power Systems ATTN: Mr. P. W. Kruse, Manager Combustion Engineering, Inc.

Engineering Services 4853 Cordell Ave., Suite A-1 Post Office Box 500 Bethesda, Maryland 20014 Windsor, Connecticut 06095 Calvert County Library Prince Frederick, Maryland 20678 Director, Department of State Planning 301 West Prestcn Street Baltimore, Maryland 21201 cc w/4 cys enclosures and 1 cy of BG&E filings dtd.: June 18, 1980 Mr. R. M. Douglass,fianager Quality Assurance Department Administrator, Power Plant Siting Program Room 923 Gas & Electric Building Energy and Coastal Zone Administration P. O. Box 1475 Department of Natural Resources Baltimore, Maryland 21203 Tawes State Office Building Annapolis, Maryland 21204

. -.u :

1 ENCLOSURE-ATTENDANCE - JUNE 5,1980 BG&E NRC R. Olson M. Conner R. Holland L. Gesalth K. Sebra A. Saeed S. Davis

0. Chopra N. Trehan F. Rosa S. Rhow C. Li RCI A. Bennett W--

N, u

n. - -.

,.--,w-.