ML19320A522
| ML19320A522 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/13/1980 |
| From: | Kintner L Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8006250343 | |
| Download: ML19320A522 (4) | |
Text
b anzo 8
[o,,
UNITED STATES 8,
NUCLEAR REGULATORY COMMISSION o
h WASHINGTON, D. C. 20555 k.....,o#
June 13,1980 Docket No. 50-364 MEMORANDUM FOR:
A. Schwencer, Chief, Licensing Branct No. 2, D0L FROM:
L. Kintner, Project Manager, Licensing Branch No. 2, D0L
SUBJECT:
FORTHCOMING MEETING WITH ALABAMA POWER COMPANY REGARDING REVIEW 0F FARLEY 2 OPERATING LICENSE APPLICATION DATE AND TIME:
June 24, 1980 1 :30 p.m.
LOCATION:
Room /P-li8, Phillips Building 7920' Norfolk Avenue Bethesda, Maryland PURPOSE:
HeaN and discuss applicant's plans for managing the opePatton of Farley Unit 2 (see attached agenda).
b PARTICIPANTS:
Alaoama Power Company F. L. Clayton, R. P. Mcdonald, O. D. Kingsley, W. G. Hairston, O. Batum and T. M. Milton Nuclear Regulatory Commission Paul J. Kellog, Region II, I&E G. W. Rivenbark, LQB, DHFS, NRR J. Snell, LQB, DHFS, NRR J. Mi nns, RAB, DS I W. Bradford, Farley Resident Inspector, I&E A.
Lester Kintner, Project Manager Licensing Branch No. 2 Division of Licensing
Attachment:
Agenda cc: See next page 80062503%
A
JUN 131980 Mr. F. L. Clayton, Jr., Senior Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291
+
~
cc: Mr. Alan R. Barton Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services, Inc.
Post Office Box 2625
-Birmingham, Alabama 35202
- Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 ft Street, N. W.
Washington, D. C.
20036 l
i e
o s
~
MEETING NOTICJ DISTRIBUTION Docket File J. Stol z NRC PDR S. Hanauer Local PDR P. Collins
-TIC D. Vassallo NSIC D. Ziemann
_ Branch File R. Mattson H. Denton R. Schroeder E. Case K. Kniel D. Eisenhut D. Skovholt s
R. Purole G. Knighton T. Novak M. Ernst S. Varga R. Baer T. Ippoli to C. Berlinoer R. A. Clark S. Israel R. Reid ACRS (16)
R. Tedesco Attorney, OELD J. Youngblood OIE (3)
A. Schwencer OSD (7)
Chief, Licensing Branch #3 Project Manaaer Lester Kintner J. R. Miller Licensino Assistant Marnaret Service G. Lainas Receotionist D. Crutchfield TERA Chief, Systemic Evaluation Program Branch J. LeDoux, I&E Chief, Operating Reactors Assessment Branch R. Vollmer I&E Headnuarters R. Bosnak I&E Region I F. Schauer I&E Region II R. E. Jackson I&E Region III G. Lear I&E Region IV V. Noonan I&E Regici V S. Pawlicki V. Benaroya NRC Particioants:
- 2. Rosztoczy Paul J. Kellog, Region II, I&E W. Haass G. W. Rivenbark, LQB, DHFS, NRR D. Muller J. Snell, LQB, DHFS, NRR R. Ballard J. Minns, RAB, DSI W. Regan W. Bradford, Farley Resident Inspector.I&E J. D. Sal tzman D. Ross P. Check t
R. Satterfield -
- 0. Parr bcc: Aoplicant & Service '..ist F. Rosa W. Butler W. Kreger R. W. Hous ton T. Murphy W. Gammill L. Rubenstein T. Soets Chief, Core Performance Branch
AGENDA ITEMS FOR JUNE 24, 1980 1:30 PM MEETING BETWEEN NRC AND ALABAMA POWER C0.
Describe the current overall Farley 2 organization both onsite and offsite.
Discuss how the basic objectives of the February 25, 1980 draft " Criteria for Utility Management and Technical Competence" are met with respect to the offsite organization and resources, including the radiological protection organization.
Describe the responsibilities of each offsite organizational element that is related to the management or support of operation of the Farley Unit 2.
Explain the lines of authority and communication between these offsite orgar.i-zational elements.
Explain the lines of authority and communication between these offsite organi-zational elements and the organizational elements at the site.
Describe the qualification and staffing levels of the offsite managers and technical staff (provide these in writing prior to meeting if possible).
Discuss the Independent Safety Engineer ing Group that is located on-site but reports to offsite management (May 13, 1980 Info. Report - SECY-80-242).
Describe how the corporate official in overall charge of nuclear plant operations is actively involved in plant operational activities - i.e.:
what overs'ght and management responsibility and activities he personally handles.
Discuss how operational experience from Farley plants and other utilities, the NRC, INP0 etc. are obtained, reviewed and disseminated to plant operators.
Describe how outside contractual assistance is relied on as technical or other support to operation of the nuclear plant.
Describe the nationai standards and NRC regulatory guides that you use as criteria for your current offsite management and technical support staff.
Describe offsite organization and resources for managing the response to and recovery from an accident.
r h