( Lucoq
,71 jo, UNITED STATES 2
3 v.
NUCLEAR REGULATORY COMMISSION I E n
S 7
WASHING TON. D. C. 20555 h..k,r a
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC ASSOCIATION OF GEORGIA CITY OF DALTON, GEORGIA EDWIN I. HATCH NUCLEAR PLANT, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 75 License No. DPR-57 1.
The Nuclear Regulatory Commission (the Comission) has found that:
A.
The application for amendment by Georgia Power Company, et al.,
(the licensee) dated January 16, 1980, complies with the stand-ards and requirements of the Atomic Energy Act of 1954, as a aended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of
.is amendment is in accordance with 10 CFR i
Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
t 8006250 N
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-57 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 75, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3., This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Jh's Robert W. Reid, Chief Operating Reactors Branch #4 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
June 10,1980
ATTACHMENT TO LICENSE AMENDMENT NO. 75 FACILITY OPERATING LICENSE NO. DPR-57 DOCKET NO. 50-321 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 3.9-1*
3.9-1*
3.9-2 3.9-2
- Overleaf; no changes on the page.
0 i
f
+
LIMITING CONDITIONS FOR OPERATION S'JRVEILLANCE REQUIRENENTS 3.9 AUXILIARY ELECTRICAL SYSTEMS 4.9 AUXILIARY ELECTRICAL SYSTEMS
~ Applicability.
Applicability The Limiting Conditions for
.The Surveillance Requirements apply Operation apply to the auxiliary to the periodic testing require-electrical prwer systems.
ments of the auxiliary electrical power systems.
t Objective Objective The objective of the Limiting The objective of the Surveillance Conditions for Operation is to Requirements is to verify the' assure an adequate supply of operability of the auxiliary electrical power for operation of electrical systems.
4 those systems required for safety.
Specifications Specifications A. Requirements For Reactor A. Auxilliary Electrical Systems Startup Equipment The reactor shall.not be made Tests shall be performed at sched-critical from the Cold Shutdown uled intervals as follows to de-Condition unless all of the fol-tect deterioration of equipment loving conditions are satisfied:
and to demonstrate that auxiliary electrical systems equipment and components are operable.
- 1. Offsite Power Sources
- 1. Offsite Power Sources At least two 230 kV offsite trans-(No specific Surveillance Re-mission lines shall be available quirement) and each shall be capable of supplying auxiliary power to the emergency 4160 volt buses (lE, IF, and 1G) and each shall be
~
capable of supplying power to both startup auxiliary trans-formers (lC and 1D).
- 2. Standby AC Power Supply (Diesel
Generators lA, 1B, and IC)
Three diesel generators (LA,1B The following periodic tests and and IC) shall be operable and surveillance of the standby AC capable of supplying power to power supply (Diesel Generators the emergency 4160. volt buses lA, 1B, and IC) shall be per-
-(IE, IF, and 1G).
formed:
For~each diesel generator to be
-operable and capable of sup-plying power, the'following j
conditions must be met:
)
a 3.9-1 3
~ ~..,, -
LIMITIhG CONDITIONS FOR OPERATION SURVEILLANCE REOUIREMENTS 3.9.A.2.
Standby AC Power Supply (Diesel 4.9.A.2 Standby AC Power Supply (Diesel Generators LA, 1B, and IC)
Generators lA,1B, and IC)
(C'ntinued)
(Continued) a.
Operability
- a. Operability The diesel generator itself and Each diesel generator shall its auxiliaries are operable.
be manually started and loaded once each month to b.
Diesel Battery (125 Volt) demonstrate operational read-Each 125 volt diesel battery iness. The test shall con-is operable and capable of tinue for at least a one supplying the required load.
hour period at 50% or greater of rated load. The diesel c.
Battery Charger generator starting time to An operable battery charger is reach rated voltage and fre-available. Each battery charger quency shall be recorded.
shall have adequate capacity to During the monthly generator restore its battery to full test, the starting air com-charge within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from a pressor shall be checked for discharged condition while operation and for its ability carrying the DC load, to recharge the air system.
d.
Diesel Fuel
- b. Diesel Battery (125 Volt)
There shall be a minimum of Each 125 volt diesel battery 80,000 gallons of acceptable shall be subjected to the diesel fuel in the diesel same periodic surveillance as fuel storage tanks.
the plant batteries in Speci-fication 4.9.A.3.
- c. Battery Charger Indicators shall be provided to monitor the status of the battery charger supply.
This instrumentation shall include indication of output current and output voltage.
- d. Diesel Fuel Each month the quantity of diesel fuel available in each fuel storage tank shall be measured and recorded.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-65, is within the acceptabic limits,specified in Table 1 of ASTM D975-74 when checked for viscosity, water and sediment.
- e. Fuel Oil Transfer Pumos The' operation of the diesel fuel oil transfer pumps shall be demonstrated once each month.
Amendment No.
3.9-2
-