ML19320A460

From kanterella
Jump to navigation Jump to search
Summary of 770322 Meeting W/Util at Region 3 Ofc Re QA Insp & Acceptance for Nuclear Steam Sys Components.Attehdee List Encl
ML19320A460
Person / Time
Site: Midland
Issue date: 04/13/1977
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8006180666
Download: ML19320A460 (3)


Text

._.

o w

CENTRAL RLES pa ate UNITED STATES NUCLEAR REGULATORY COMMISSION S

nectoN IH 7e

  • Of 799 ROOSEVELT ROAO S

%..... #g APR 131977' CLEN ELLYN GLLINots 60137 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN:

Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:

This refers to the meeting which was held in the RIII office on March 22, 1977, at the request of the Consumers Power Company Director of Project Quality Assurance Services. Those persons in attendance at this meeting are listed in an enclosure to this letter.

The subjects discussed at the meeting were your plans to directly, or through an independent agent, perform the quality related activities of material and installation inspection and acceptance for the nuclear steam system components. We understand thst you intend that t.his program will relieve the constructor from any responsibilit.y beyond the actual installation. In addition, your represent-ative indicated that the program had not been completely formulated and that, upon completion of the planning, this information would be communicated to the office of Nuclear Reactor Regulation (NRR) for their review.

The Region III representatives suggested that a discussion with the Quality Assurance Branch of NRR would be helpful in the development of a program which would be found accept-able to '.he NRC.

It ic our opinion that this meeting was beneficial and the discussions contributed to a better anderstanding of the Coasumers Power Company's intentions regarding the quality assurance program changes.

8006180 C4

~

+

4 Consumers Pouar Company

-2, APR 1319T/

i i

In accordance with Section 2.790 of NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this notice will bo placed in NRC's Public Document Room.

Sincerely, R. F. Ecishnan, Chief Reactor Construction and

[

Engineering Support Branch

Enclosure:

List of Attendees

,,\\

ec w/onc1:

\\

\\

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan

- Public Servico Cornission 3

Dr. Wayne E. North l

Ifyron M. Cherry, Chicago

.A t

{

}

t i

k' I.

RLI1, RIII RIII RIII RIII d

a e's He an Kepple$

Ngt us

.v.,,,, w 4/12/77

,f_3 egg /.g_

y[jpg

e

.h ATTENDEES Consumers Power Company B. W.'Margulio, Director of Project Quality Assurance Services Region III Offf.ce R. F. Heishman, Chief, Reactor Construction and Engineering Support Branch D. W. Hayes, Chief, Projects Section T. E. Vandel, Assigned Project Inspector I. T. Yin, Project Inspector H. S. Phillips, Project Inspector 4

i

\\

\\

l

.q