ML19320A401

From kanterella
Jump to navigation Jump to search
Notifies That Unit Was Shut Down for Month of March 1977 & No Impingement Monitoring Samples Taken
ML19320A401
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/01/1977
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
L-047-1, L-47-1, NUDOCS 8005020423
Download: ML19320A401 (2)


Text

_- -

wg s

H EL PIN G BUILD ARKANSAS ARK ANS AS POWER & LIGHT COMPANY A Q SCX 551 LIT,L.

A OC. ' AAKANSAS 72203.(501)371-4000 April 1, 1977 1-047-1 Director of Nuclear Reactor Regulation ATIN: Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 U. S. Nuclear Regulatory Commission

(

N Washington, D. C.

20555

~--

Subject:

Arkansas Nuclear One-Unit 1 Docket No. 50-313

)

License No. DPR-51 Intake Impingement Data (File: 0520.2)

Gentlemen:

Environmental Technical Specification 4.1.2.a(2) requires submittal each month of the results of impingement monitoring at the intake of Arkansas Nuclear One-Unit 1.

During the month of March 1977 the unit was in a shutdown condition which eliminated the need for this sampling.

Thus, no such report is necessary for March 1977.

Very truly yours, f ke [/

afA Donald A. Rueter

, " Manager, Licensing DAR:DHW:tw 8 005 02 0 t{M k

L U.S. NUCLE AR r.EGULATO AY COP.'

SSION DOC KET NUM rF n NRC per,u 195

_.Sc_- 3 /3 a.,.I rJRC DISTRIBUTION FOR PART 50 DOCKET M ATERI AL

" [ "" g g

FO.

~

FROM:

DATE OF OOCUMENT Arkansas Power & Light Company 4/1/77 hr. D. L. Ziemann Little Rock, Arkansas DATE RECEIVED Donald A. Rueter 4/4/77

. GETTER ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECElVED McRIGIN A L kNC LASSIFIE D OCOPY

/

6/j W.

OEScalPTION E NCLOSU R E Ltr. indicating that during the month of

-s March 1977 the Unit was in a shutdown Condition therefore no intake impingement report is necessar/....

d (1-P)

/

PLANT NAME:

Arkansas Unit No. 1 C A C. ! 4-4 '

kb

%3 RJL SAFETY FOR ACTION /INFORMATION FwTun ASSIGNED AD:

AngTr.NFD An*

_JBANCH CHIEF!

~2. / 4. N ^ O RRANcif FTTTFT.

PROJECT MANAGER:

F/ =. W> _

PROJECT MANAGER:

Sc33 A (C)

LIC. ASST. :

LIC. ASST. :

INTERNAL DISTRIBUTION 7[

REG FILE T SYSTEMS SAFETY PLANT SYSTEMS SITE SAFETY &

NRC'PDR HEINEMAN TEDESCO ENVIRO ANALYSIS

/ I & E ('Z /

SCHROEDER BENAROYA

/

DENTON & MUT.T FR

/ OELD T.ATNAR GOSSICK & STAFF ENGINEERING IPPOLITO ENVIRO TECM.

MIPC MACARRY KIRKWOOD

/

ERNST CASE BOSNAL

/

BALLARD

/ HANAUER SIHEE*I, OPERATING REACTORS

/

YOUNGELOOD j

/ HARLESS PAWLICKI STELLO SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

/ GAMMILL (*2.f BOYD ROSS SISENHUT STEPP P. COLLINS NOVAK SHA0 HULMAN HOUSTON ROSZTOCZY BAER PETERSON CHECK BUTLER SITE ANALYSIS

}'ILTZ

_ GRIMES

/

VOLLMER HELTEMES AT & I

/

BUNCH SKOVHOLT SALT MAN C J. COLLINS l

RUTBERG KRECER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: #m *//.n //e, /& C NAT. LAB:

BROOKHAVEN NAT. T.AR_

TI_C :

REG V.IE ULRIKSON (ORNL)

/_ NSIC:

LA PDR I

ASLB:

CONSULTANTS:

d'p,, !

4

/ ACRS/6 CYS HOLDINC/ set T 45 L d TS

  • g NftC F ORM 19512 76)