ML19320A048

From kanterella
Jump to navigation Jump to search
Responds to AEC Re Violations Noted in Insp Rept 50-313/73-05.Corrective Actions:Reactor Bldg Spray Sys Test Procedure to Be re-written,controlling Bypass & Jumper Use & Full Report Submitted by 730731.Deficiencies to Be Reported
ML19320A048
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 05/31/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19320A047 List:
References
NUDOCS 8004140666
Download: ML19320A048 (4)


Text

.

. H QLPIN G CUILO A R K A N S A

4,(

f%

(

)

ARK ANS AS POWER & LIGHT COMPANY STH & LOUISI AN A STAEETS. LITTLE ACCK. A AK ANS AS 72203.(5013372-4311 May 31, 1973 United States Atomic Energy Commission Directorate of Regulatory Operations Region II 230 Peachtree Street, N.W., Suite 818 Atlanta, Georgia 30303 Attention:

Mr. Norman C. Moseley Director

Subject:

Arkansas Power 6 Light Company Arkansas Nuclear One-Unit 1 RO:II:MSK 50-313/73-5 p)

Gentlemen:

(v We have reviewed your letter dated May 10, 1973, concerning the reported violations in our startup testing activities.

We submit the following information in response to correspondingly-numbered items in the enclosure to your letter:

I.A.1.a.

This item has been reviewed by Arkansas Nuclear One plant personnel. As a result of their review, a new procedure l

will be written to control the use of bypasses and jumpers.

The review and approval of the new procedure for Bypasses and Jumbers is expected to be complete by July 1,1973. At this time OP 1004.09 will be revised to reference the new Bypass and Jumber procedure.

b.

This item has been reviewed by Arkansas Nuclear One plant personnel and corrective action taken. A detailed report of the action taken will be prepared and will become a part of the procedure. All appropriate test personnel have been made cogni:: ant of this noncompliance by memorandum dated May 17, 1973.

It is expected that work on TP 204.04 will be completed by July 1, 1973.

l

~

O(}

8004140ffg 9

e

~

~ *.

Mr. Norman C. Mosalsy May'31, 1973 Atomic En:rgy Commit'Nn c)

This item has been reviewed by Arkansas Nuclear One plant c.

personnel and corrective action taken. A detailed report of the action taken will be prepared and will become a part of the procedure. All appropriate test personnel have been made cognizant of this noncompliance by memorandum dated May 17, 1973.

It is expected that work on TF 204.02 will be complete by July 1,1973.

I.A.2 The Arkansas Power 6 Light Company policy regarding the j

reporting of deficiencies as required by 10 CFR 50.55(e) has been reviewed and modified. Significant deficiencies will bc reported, and 'eficiencies which may be significant but require further iluation for determination of signi-ficance will be pre ly identified to the AEC Regulatory Operations Region II office, following identification to Arkansas Power 4 Light Company Quality Assurance or Project Management.

Very truly yours, d

v J. D. Phillips CN Vice President and Chief Engineer JDP:lt e

o l

(

e4 r

l L).

l n

> ~5

\\

DIRECTORATE OF REGULATORY OPERATIONS MONTHLY REPORT FOR APRIL 1973 l

Arkansas Power and Light Company (ANO-1) - A routine inspection was conducted at the Arkansas Nuclear One, Unit 1 site April 10 through 13.

Areas -inspected included previously identified outstanding items, emergency procedures, alarm procedures, operating procedures, preoperational test procedures, completed preoperational tests, and zero power and power ascension test programs.

Inspection findings revealed three violations of Appendix B to 10 CFR 50 involving failure to follow approved procedures.

In addi-tion, one violation of 10 CFR 50.55(e) involving failure to promptly notify Region II of a possible construction deficiency in an engineered safeguards system. These findings will be discussed in a notice'of violation to be sent to the licensee.

\\3 gl4 i

s

,e

\\.

a f

m 6

6 6

+

n

O a

MAY 101973 Arkansas Power and Light Company Arkansas Nuclear One, Unit 1 RO Inspection Report No. 50-313/73-5 ce v/ enc 1:

. D. Thornburg, R0 RO:HQ (5)

DR Central Files Regulatory Standards (3)

Directorate of Licensing (13) cc encl. only:

  • PDR
  • HSIC
  1. DTIE, OR
  • State
  • To be dispatched at a later date.

a I

i i

U I

I

.