ML19319E558

From kanterella
Jump to navigation Jump to search
Forwards RO 50-313/77-09
Date released: 11/29/2019 Download: ML19319E558


RO 50-313/77-09:on 770310,penetration Room Ventilation Sys Valve CV-2123 Found Inoperable During Engineered Safeguard Actuation Sys Integrated Test.Caused by Inadequate Breaker Overload Heaters.Heaters Replaced W/Higher Amperage Rating
ML19319E561
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/08/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19319E561 (1)
Forwards RO 50-313/77-09
ML19319E557
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/08/1977
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: HOWARD E M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19319E557 (1)