ATTAClla!ENT "B" NON-ROIRINE REGULATORY RE50RT REVIEW SilEET
~ Plant:
me
//
y M
Unit:
(
Report
Title:
A ifc([es tal I /
/
Report Number:
N-AS f M 8-[ /
t Reviewed and Approved by:
Plant Safety Committee YES
()$
NO ()
Plant Superintendent YES 6q)
NO j)
Reference:
[L4)A-(hlo Date: (-2 '( 77
~
Date: 78 Reviewed by: '
Licensing Supervisor
/
/
/
[//.
~
Date: 7 78 S"
Approved by:
/
Magger of Nu'cidar prvices
/l Approved by: [/*.NI('d
, t' -
Date: 7 - ?- T~ - 2 ~ ~
/
Director of Power Produc. tion i
l' I
m
)-
m/
Attachment "B" Apri.1 23, 1975 NSP-10, Rev. 3 Page 1 of 1 8004110 792
~
~
?,
( b -1.
Non-Routine, Non-Radiological Environmental Report No.
50-313/75-41
'2.
Report Date:
July 29, 1975 3.
Occurrence Date:
July 23, 1975 4..
Facility:
Arkansas Nuclear One-Unit 1 Russellville, Arkansas 5.
Identification of Occurrence:
Chemical concentrations of three parameters, increased across the plant in excess of Environmental Technical Specification limits.
6.
Conditions ' Prior to Occurrence:
~
Steady-State Power X'
Reactor Power Mh'th llot Standby Not Out13ut Mh'c Cold Shutdown Percent of Full ' Power 95 1.oad Changes During Routine Refueling Shutdoun
(]
Power Operation 8
Routino Startup Operation Routine Shutdoun Operation
~
Other (specify) i 7.
Description of Occurrenec:
pH and ammonia concentration in condenser circulating water increased across the plant as follows:
Parameter Units-Increase ETS Limit p!!, intake vs. discharge.
pH 0.6 0.S l
NH, ie,take vs. discharge mg/l 0.08 0.05 3
NH, intake vs. discharge mg/l 0.08 0.05 l
3 March'4, 1975 NSP-10,' Rev. 2 Page 2 of 4
- .~,*
~
=
- b s
a D
(
Non-R'outine, Non-Radiological Environmental Report No.
50-313/75-41
~
_8.
'{e::12 nation of Apparent Cause of Occurrence:
'~
Design Procedure Manufacture Unusual Service Condition Including Environmental Installation /
Construction Component Failurc Operator Other (specify)
~X Neutralizing tank draining into discharge fiume at time cf sampling.
9 9.
Analysis of Occurrence:
The neutralizing tank, which contains impurities remaining after regenerat-ing condensate demineralizers and plant make-up water demineralizers, was being drained into the discharge fiume when samples were taken. No other liquid releases were in progress ~at the time of sampling.
Four circulating water pumps were in. operation.
i I
J.
March'4, 1975 NSP-10, Rev. 2 Page 3 Of 4 i
,-.,4
-.,,,-,.s_~,,--.
n Non-Routine, Non-Radiological Environmental Report No. 50-313/75-41
- 10. Corrective Action:
Revised ETS have been submitted to NRC and are currently under review.
4 e
i.
i 11.
Failure Data:
3..
The circumstances of this report are similar to those reported in Non-Routine, Non-Radiological Environmental Reports No. 50-313/75-25 through 50-313/75-40.