Unusual Event Rept 50-313/75-3:on 751009,strong Motion Accellerograph at Elevation 531.5 Ft on Reactor Bldg & Elevation 335 Ft on Base Slab Found Improperly Mounted. Caused by Improper Installation by Bechtel Corp
ML19319E413
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/07/1975
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19319E405 List:
References
NUDOCS 8004100695
Download: ML19319E413 (3)


Text

.

8 : ',

c 1.-

Unusual Event Report No. 50-313/75-3 2.

Report unte:

11/7/75 3.' Occurrence Date:

10/9/75 4

Facility:

Arkansas Nuclear One-Unit.1 F.ssellvi11e,' Arkansas 5.

Identification of Occurrence':

Strong motion accelerographs were not mounted correctly.

4 6.

Conditions Prior to Occurrence:

Steady-State Power X

Reactor Power 2504 blNth llot Standby Not Outpu:

800 stwe Cold Shutdown hicent of Full Power 97.5 %

i Refueling Shutdown Load Chr.nges During Routine Power Operation

- C Routine Startup Operation Routine Shutdown Operation-Other (specify) f i

7.

Description of Occurrence:

4 The Strong blotion Accelerograph located on top of the reactor building at elevation 531'-6" and on the base slab at elevation 335'-0" were not mounted correctly. They were found setting in their proper location but not belted to the base slab or the reactor building as requirc.i by FSAR Section 2.7.6.

1.d -

800410 0 [ /f i

j_

blarch 4, 1975

'NSP-10,-Rev. 2 Page 2 of 4

~

r pO Unusual Event Report No. 50-313/75-3 8.

Designation of Apparent Cause of Occurrence:

Design Procedure-Manufacture Unusual Service Condition Including linvironmental Installation /

X' Construction Component Failure Operator Other (specify)

~

d -

A 4

L 9.

Analysis of Occurrence:

The apparent cause is the failure of Bechtel Construction to mount the Strong Motion Accelerographs as required by the. FSAR and vendor instru-ctions. The alarm mechanisms, which are separate units, were mounted correctly and would have provided the control room information necessary in the event of a seismic occurrence. No seismic occurrences have been alarmed and periodic testing has proven the operability of the alarms.

i n

.V March 4, 1975 NSP-10', Rev. 2 Page 3 Of 4

,.. _ _. _. _ _,, _ _ _ _. ~ -... _ _

i; 3

z.;

[L i

i

. Unusual Event _ Report No.- 50-313/75-3 10.

Corrective Action:

The Strong Moti'on Accelerographs were mounted correctly on October 18f 1975.

?

I t

~

'f a

i i

^

11.

Failuro Data:

NA i

I s

i !

[

- i i

l l

i l

l j

1 i

!'l Marchr4, 1975

.NSP-10,,Rev.

2--

' Page 4 of 4 _

~l

.?,

b i

-