ML19319E413
| ML19319E413 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/07/1975 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| Shared Package | |
| ML19319E405 | List: |
| References | |
| NUDOCS 8004100695 | |
| Download: ML19319E413 (3) | |
Text
.
8 : ',
c 1.-
Unusual Event Report No. 50-313/75-3 2.
Report unte:
11/7/75 3.' Occurrence Date:
10/9/75 4
Facility:
Arkansas Nuclear One-Unit.1 F.ssellvi11e,' Arkansas 5.
Identification of Occurrence':
Strong motion accelerographs were not mounted correctly.
4 6.
Conditions Prior to Occurrence:
Steady-State Power X
Reactor Power 2504 blNth llot Standby Not Outpu:
800 stwe Cold Shutdown hicent of Full Power 97.5 %
i Refueling Shutdown Load Chr.nges During Routine Power Operation
- C Routine Startup Operation Routine Shutdown Operation-Other (specify) f i
7.
Description of Occurrence:
4 The Strong blotion Accelerograph located on top of the reactor building at elevation 531'-6" and on the base slab at elevation 335'-0" were not mounted correctly. They were found setting in their proper location but not belted to the base slab or the reactor building as requirc.i by FSAR Section 2.7.6.
1.d -
800410 0 [ /f i
j_
blarch 4, 1975
'NSP-10,-Rev. 2 Page 2 of 4
~
r pO Unusual Event Report No. 50-313/75-3 8.
Designation of Apparent Cause of Occurrence:
Design Procedure-Manufacture Unusual Service Condition Including linvironmental Installation /
X' Construction Component Failure Operator Other (specify)
~
d -
A 4
L 9.
Analysis of Occurrence:
The apparent cause is the failure of Bechtel Construction to mount the Strong Motion Accelerographs as required by the. FSAR and vendor instru-ctions. The alarm mechanisms, which are separate units, were mounted correctly and would have provided the control room information necessary in the event of a seismic occurrence. No seismic occurrences have been alarmed and periodic testing has proven the operability of the alarms.
i n
.V March 4, 1975 NSP-10', Rev. 2 Page 3 Of 4
,.. _ _. _. _ _,, _ _ _ _. ~ -... _ _
i; 3
z.;
[L i
i
. Unusual Event _ Report No.- 50-313/75-3 10.
Corrective Action:
- The Strong Moti'on Accelerographs were mounted correctly on October 18f 1975.
?
I t
~
'f a
i i
^
11.
Failuro Data:
NA i
I s
i !
[
- i i
l l
i l
l j
1 i
!'l Marchr4, 1975
.NSP-10,,Rev.
2--
' Page 4 of 4 _
~l
.?,
b i
-