Responds to IE Circular 76-06.Util Will Conduct Hydrostatic Testing of Low Pressure Stainless Steel Piping Containing Boric Acid Solution at PWR to Determine Stress Corrosion & Accelerate NDT Requirements of ASME Code
ML19319E303
Person / Time
Site: Rancho Seco
Issue date: 12/23/1976
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19319E300 List:
References
IEC-76-06, IEC-76-6, NUDOCS 8004040608
Download: ML19319E303 (2)


Text

-s

~

g< s u SACRAMENTO MUNICIPAL UTILITY DisTRfCT C 6201 S street. Box 15830, sacramento, California 15813; (916) 452-3211 Decerrber 23, 1676 Mr. R. H. Engelken, Director Docket No. 50-312

  1. ' gi '

C(, '

U. S. Nuclear Regulatory Comission Region V

~ C5'-

t 1990 North California Boulevard O

k%.

1,[ -

'i fl Walnut Creek, California 94596 ew -

w IE Circular 76-06 W w" >

Rancho Seco Nuclear Generating Station, Unit No.1

Dear Mr. Engelken:

Please refer to your letter dated November 24, 1976 relative to stress corrosion cracks in stagnant, low pressure stainless steel piping containing boric acid solution at PWR's.

The program at the Rancho Seco Nuclear Generating Station, Unit No.1, for assuring the integrity of the safety related piping will be two fold.

First, a near tem program for hydrostatic testing of some accessible piping available during plant operation will be initiated. Secord, compli-ance with the requirements of Section XI of the ASME Code in accordance with 10CFR50, Section 50.55a will be accelerated for some of the accessible piping which is the subject of IE Circular 76-06.

Rancho Seco is currently operating at rated power. Not all the safety related piping subject to the stagnant conditions referred to in the subject circular is accessible or available for hydrostatic testing during operation. Therefore, a program of hydrostatic testing of those portions of the piping both accessible and available during operation will be initiated.

This hydrostatic testing will be, where possible, in accordance with ASME Section XI rules.

Where feasible, SMUD will comply with the requirements of Section XI of the ASME Code as required by 10CFR50, Section 50.55a. According to these requirements, the end of the first forty month inspection interval will occur at the second refueling during the fourth quarter of 1978. However, the District will accelerate this program and for the piping referred to in Circular 76-06, attempt to complete the first forty month inspection interval requirement during the first refueling, presently scheduled for October _1977.

8004040 h (h

I

...n m

.~

Mr. R. H. Enge1 ken December 23, 1976 Currently the reactor building spray system at Rancho Seco.is

. most representative of the stagnant systems discussed in the IE Circular.

-The near term program for hydrostatic testing of available piping will therefore begin on the reactor building spray piping.. This program will be initiated in Januar51977. A summary report of the results of this examination willibe submitted within 60 days of completion of the program.

- Als,'in accordance with the subject circular, the NRC's Regional Office will be informed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> should any adverse findings be discovered.

We believe this program of immediately initiating hydrostatic testing of a representative system plus accelerating the nondestructive testing requirements' of Section XI of the ASME Code meets the intent of IE Circular 76-06.

If we can be of further assistance, please do not hesitate to call on us.

Sincerely yours,