Responds to NRC Re Violations Noted in IE Insp Rept 50-312/77-09.Corrective Actions:Training Program Outlined Instructing Engineering Staff in Documentation on Design Verification to Be Completed After Refueling
ML19319E215
Person / Time
Site: Rancho Seco
Issue date: 08/08/1977
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19319E208 List:
References
NUDOCS 8003310724
Download: ML19319E215 (2)


Text

o SDLUB SACRAMENTO MuN!CIPA!. UTILITY OISTRicT O 6201 S Street. Box 15a"20. Sacramento California 95813: (916) 452-3211 August 8,1977 4

Mr. R. H. Engelken

$EFjg_0 y Director of Regulatory Operations 4

y U. S. Nuclear-Regulatory Commission j' guG 1013II '

Region V evrrG S g..no 3

1990 North California Boulevard Walnut Creek, California 94596 W#he

.7-NRC Inspection Results of Inspection 77-

]

Gentlemen:

We have reviewed and concurred with your findings on the inspection perfomed on May 31-June 1 and June 20-23, 1977 as dis-cussed in your letter of July 13, 1977.

(V You indicate a concern on the training program for person-nel on those aspects of quality assurance connected with work activi-ties at Rancho Seco. Our cuality assurance training program has been directed to explain both the 10CFR50, Appendix B criteria and how this requirement is met by the Quality Assurance Manual, Nuclear Operations.

In particular, this lack of training has resulted in insufficient documentation on design verification by our engineering staff.

The objective evidence to substantiate the design verifi-cation aspects of Quality Assurance procedure No. 2, paragraph 4 is not being completed as required. The training program will address itself to use of proper forms and records to achieve the desired documentation. We are reviewing the requirements to determine if the required forms can be modified and improved.

The infraction has been discussed with our engineering staff and an agreed on program of instruction has been outlined. The train-ing program will be completed within 60 days after refueling completion and the plant returned to operation.

It is our intention to review the documentation on the refer-enced motor control centers and assure proper documentation is avail-able for your inspector to review.

g V

8003 310 7Ry j

t:

R. H. Engelken August 8, 1977 The failure to include Design Review dn our audit schedule was an oversight and has been corrected. The first audit will be conducted in this area prior to September 1,1977 with results to be reviewed at the first scheduled MSRC meeting after audit completion.

1 If there are'any.further questions, please feel free to call me.

Sincerely yours,

. sh '

.' J. Mattimoe Assistant General Manager and Chief Engineer e