ML19319E141

From kanterella
Jump to navigation Jump to search
Responds to AEC 720317 Request for Revised Schedule for Const & Fuel Loading Completion.Change in Date to 730430. Requests Mod to Licensing Schedule to Allow for Intervention by anti-nuclear Groups
ML19319E141
Person / Time
Site: Rancho Seco
Issue date: 03/31/1972
From: Davis E
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8003310660
Download: ML19319E141 (2)


Text

s.

$SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-1211 March 31, 1972 N U*

ReguWerv Dr. Peter A. Morris, Director Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D. C.

20545 Rancho Seco Nuclear Generating Station, Unit No.1 AEC Docket No. 50-312 - Revised Construction Schedule

Dear Dr. Morris:

In response to your letter of March 17, 1972 the District here-by advises you of the revised schedule for completion of construction and fuel loading.

A detailed review of construction and start-up requirements result in a change in the date for completion of construction and commence-ment of fuel loading to April 30, 1973.

It is our understanding that the tentative licensing schedule established by the DRL did not allow time for contested hearings. We have recently learned that a group of people opposed to nuclear plants intend to attempt to intervene. We therefore respectfully request that a licensing schedule be developed that will allow for the possibility of such inter-vention.

ours,[

Si ere "

GMP E. K. Davis General Manager O

sQfY0 9

gpb., cpf U

i-9 me%DQY-:

VmytN6fs yOUS31oggp n

/By3 a

AN ELECTRIC SYSTEV SERV:NG

!.9 0 R E T H A '4 600.000 ' '4 THE WEARI ;F :

t i F 0 2 *, a

o

'7acramente thaniciPal Utility Distric ly '""'"*b hl6,1972

~

, 3g 72 Scaramento, Calif.

9581, E.E. Davis 3

g O RsG.;

CC QTMER l

Dr. Peter A. Morris 1

ACTION NECE$$Aar O

co~cuaarace O

oarc a~s* caro:

NO ACTION NECESSAAT O ce==c~r O

= v:

cLA & S e F:

POSTOFFecE FILE coog, U

50-312

.co. No.

l

"'L"E r"e'"5EE* M TU f Ltr...ady that

^

" 'c '" '

^

3CD"*"'**

  • ~ " ~ "

date for completion of const &

c - acement of fuel loading for

[

v/4 cys for ACTION t

Rancho Seco Gen. Station Unit 1 be l

STRIBUTION:

ucwsunu; 4 30-73.....

%g Fila Cy AEC PDR i

00c-Itus-P-506-A i

complimace (2)

DaYoung i

1ex,n m uC _, _

DI NOTiiEMT

\\

.ACKN0MEDGE0

=

i u.s. Arouac curacy couuiss' "

MAllCONTROL FORM roa=ascones A u.s. CO V E RNMEN T PRIN TING O F FIC Ep 197 9-424462 88-408