ML19319E088
| ML19319E088 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 08/03/1978 |
| From: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | Miller W NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| NUDOCS 8003310598 | |
| Download: ML19319E088 (2) | |
Text
s g')o6{t*{ni c
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMINO MATERIAL 50-312 REC: t1 ILLER W O.
ORG: MATTIMOE J J DOCDATE: 08/03/78 NRC SACRAMENTO MUN UTIL DIST DATE RCVD: 08/09/7 DOCTYPE: LETTER i40TARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 FORWARDING APPLICANT"3 LIC : EE (PAID UNDER PROTEST) TO PROPOSED TECH SPEC CHANGE NO 59, APPL FOR At1END TO FACILITY OPERATING LIC NO DPR-54, IN ACCORDANCE WITH APPLICANT"G LTR OF 08/02/73.. NOTE: CHECK FORWARDED TO LIC FEE MGT BRANCH ON 00/08/78.
PLANT NAt1E: RANCHO SECO (St1UD )
REVIEWER INITIAL:
XJM DISTRIBUTOR INITIAL: Ok
- DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS ******************
LICENSE FEES (DISTRIBUTION CODE MOOS)
FOR ACTION:
BR CHIEF ORB #4 BC**LTR ONLY(3)
INTERNAL:
- LTR ONLY(1)
NRC PDR**LTR ONLY(1)
MILLER LFMD**LTR ONLY(1)
EXTERNAL:
LPDR'S SACRAMENTO. CA**LTR ONLY(1)
REGION Vn*LTR ONLY(1)
ACRS CAT B**LTR ONLY(0) 9$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
CHECK NBR: 175.410 AMOUNT:
$4,000.00 CHECK AND-COPY OF TRANSMITTAL LTR ADVANCED 0
TO W.
MILLER (LFMB) (08/10/78) UPON RECIEPT
$$$C$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$
8003310$ $
f DISTRIBUTION:
LTR G
-ENCL 0 CONTROL NBR:
SIZE: 1P
' coco *******************************
THE END
h* SACRAMENTO MUNICIPAL UTILIT SMUD 95813; (916) 452-3211 August 3, 1978 U. S. Nuclear Regulatory Commission ATTN:
William O. Miller, Chief License Fee Management Branch Office of Administration Washington, D.
C.
20555 Gentlemen:
Docket No. 50-312 Proposed License Amendment No. 59 Rancho Seco Nuclear Generating Station, Unit No. 1 In accordance with our letter of August 2, 1978 addressed to Mr. Robert W.
Reid, Chief, Operating Reactors, Branch No. 4, we are enclosing our check in the amount of $4,000 in payment of the fee required for the applica-tion for amendment to facility license No. DPR-54 which we filed with the Division of Operating Reactors and which is identified as Proposed Amendment No. 59 for Rancho Seco Nuclear Generating Station, Unit No. 1.
The enclosed license fee is paid under protest since a lawsuit is on file in the United States Court of Appeal for the 5th Circuit (Mississippi Power &
Light Co., et al. vs. United States Nuclear Regulatory Commission, et al.
Civ. No. 73-1565) to obtain review of the validity of those rulcs.
Sincerely, e'
h M-
./ John J. Mattimoe Assistant General Manager and Chief Engineer Encl.
A d.Hica rit.......)a......... s
-.a: aa.I.1s'y l9J AMD...M/F03 Calegoryh,.mG 0CC..'.
RehN.Nf.(f
.e~s m a B O M.ifA.d-v a.t
'ofo AN ELECTRIC S YSTE M S E R VI N G ' M O R E. THAN 6@@@@0 DN TM