ML19319D101
| ML19319D101 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/09/1974 |
| From: | Maccary R US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319D102 | List: |
| References | |
| NUDOCS 8003090125 | |
| Download: ML19319D101 (1) | |
Text
_ _ _ - _ -.
o 9 B74 Distribution:
SE?
Docket File 50-346 L-Suppl L-Rdg SEB RF R. C. DeYoung, Assir. tant Director for Pressurized Water Reactors Directorate of Licensing TOLEDO EDISON COMPANY - DAVIS-BESSE NUCLEAR POWER STATION - REQUEST FCR INFORMATION, FSAR REVIEW Plant Name:
Davis-Besse Nuclear Power Station FSAR - OL Review Licensing Stage:,O-3463 Docket Number: G Responsible Branch-ind Project Manager: LWR 2-3, I. A. Peltier Requested Cau:pletion Date: September 6,1974 Applicant's Response Date Necessary for Completion of Next Action Planned on Project: Unknown Description of Response: Second Request for Infornation Review Status:
Second Round Complete The second round review of the FSAR has been completed by the Struc-tural Engineering Branch and we find that additional information is required before we can complete our review. The additional information requested, which concerns structural aspects, is contained in the enclosure.
The material reviewed to date consisted of information provided through Amendment No. 22 dated Aucust 15, 1974.
R. R. Maccary, Assistant Director for Engineering Directorate of Licensing
Enclosure:
Second Request for Information cc w/o encl:
cc w/ encl:
A. Giambusso, L S. Hanauer, DRTA L. Shao W. Mcdonald, L J. Hendrie, L
!. Peltier A. Schweneer, L S. Chan R. Lipinski
.L:SEB,,
L:SEB L:SEB L:AD:E
....c.
x7807Uf
.7$1RMiccary 4
eu.....
RLipinski Schan LSHA q/c,/7a -
9/-6/74-9//h/74-9/G//74 -
=""*
Forms AEC.Ha (Rev. 9 53) AECM 0240
- u. e, oavsamusur *=,= vine orreces sen.sae-see 800309 o i 2E [
g ; 3g.,g AP