Responds to to Senator Young Re Cooling Sys for Facility.Forwards Environ Rept.W/O Encl
ML19319D080
Person / Time
Site: Davis Besse 
Issue date: 01/05/1970
From: Oneill R
US ATOMIC ENERGY COMMISSION (AEC)
To: Bairley T
AFFILIATION NOT ASSIGNED
Shared Package
ML19319D081 List:
References
DR-2923, NUDOCS 8003061060
Download: ML19319D080 (1)


Text

-

p Q, [ w (W3':

~ '

DISTRIBUTIOi:

ELPrice January 5, 1970 PAMorris HKShapar JYore PDR (50-346)

GErtter, (DR-2923)

JBEasterling, DR:A0 DR Reading A0 Reading Miss Therese Bairley 1215 Corbin Road Toledo, Ohio 43612

Dear Miss Bairley:

This is in response to your recent letter to Senator Young concerning, in part, the cooling system for the Davis-Besse nuclear power station.

The reasons for the Toledo Edison Company's decision to utili::e a natural draf t cooling tower at the Davis-Besse plant are dis-cussed on pages 11 to 13 of the enclosed environmental report submitted by the applicant in accorance with the National Environmental Policy Act.

The report notes that while State authorities had given tentative approval to the use of an open cycle system, there was vncertainty as to the applicable water quality standards, and the applicant decided to install a closed cycle cooling system at a cost of about $9 million.

If I can be of any further assistance, please let ce know.

Sincerely, Robert D. O' Neill, Director Congressional Relations

Enclosure:

Davis-Besse Nuclear Power Station Environmental Report.

NOTE:

Ltr to Sen. Young was not sent as he left office before 1tr could be dispatched.

Mr. O'Neill replied directly to Miss Bairley.

RETYPED IN:

omcc>

. 0 C a.........

l l

l some >.nanuwea: uc............

.......s og.g.g.,ggo _... _

DATE>. k. 7 0..

.f, IMrm A EC.318 (Rev. 9-53) u.s. sevrasutst raimms orra;r. tis +-o-asa-ses

(

l