ML19319D055
| ML19319D055 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Crystal River |
| Issue date: | 02/08/1971 |
| From: | Long F US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Henderson J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19319D056 | List: |
| References | |
| NUDOCS 8003040971 | |
| Download: ML19319D055 (1) | |
Text
.. _.
~
~
I
(^%
1 UNITED STATES ATOMIC ENERGY COMMISSION l *{
l DIVISION OF COMPLIANCE REGION II - SulTE 818 230 PEACHTREE STREET, N oR T H W EST TaizPHose $28-4537 AT t. ANT A. GEORGI A 30303
~~
February 8, 1971
.s J. B. Henderson, Chief, Reacter Construction Branch Division of Compliance, Headquarters i
FLORIDA POWER CORPORATION ~(CRISTAL RIVER 3), LICENSE NO. CPPR-51, DOCKET NO.
50-302 1
Attached Compliance Report No. 50-302/TO h covering a routine inspection on December 1h-18, 1970, is for infox=ation. There were no safety or non-conformance items identified for which. enforcement action is being con-sidered. Several areas questioned.by the inspector vill require further i
review of documentary evidence at the licensee's corporate offices, particularly questions pertaining to adequacy of QC inspection at vendor shops. These vill be included in the next inspection.
l
}
-d DV F. J. Long CO:II:FJL Senior Reactor Inspector
Enclosure:
C0 Rpt. No. 50-302/TO h (Kelley) cc v/ encl:
E. G. Case, DRS (3)
P. A. Morris, DRL R. S. Boyd, DRL (2)
R. C. DeYoung, DRL (2)
D. J. Skovholt, DRL (3)
P. W. Hove, DRL (2)
A. Giambusso, CO Q
j L. Kornblith, Jr., C0 i
((
R. H. Engelken, C0 J
R. W. Kirkman, 00:I B. H. Grier, CO:III
//
J. W. Flora, CO:IV
/
R. W. Smith, CO:V REG Files v
8008040fy f
-