ML19319C597
| ML19319C597 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse, Perry |
| Issue date: | 03/25/1975 |
| From: | Vogler B NRC OFFICE OF THE GENERAL COUNSEL (OGC) |
| To: | Mozer H CH2M HILL, INC. |
| References | |
| NUDOCS 8002191038 | |
| Download: ML19319C597 (1) | |
Text
_
=
4 I'% 2513Q Harold M. ?'ozer, P.E.
Director of Electrical Engineering CH2:1 Hill 1500 ll4th Avenue, S.E.
Bellevue, '.lashington 98004 Fe: The Toledo Edison Company and The Cleveland Electric Illuminating Ccccany (Davis-Besse fluclear Pcwer Station, Unit 1), The Cleveland Electric Illuminating Ccmpany, et al.
(Perry fiuclear Power Plant, Units 1 and 2)
Occket Nos. 50-34EA, 50-440A and 50-441A
Dear Mr. liozer:
This vill confirm the arrangements that have been made for ycur meeting with the Staff concerning the captioned matter.
l!e will meet with you here at the Commission on May 14 and 151975 On Friday, liay 16th, we will meet with Bill Ilughes in boston, ilassachusetts.
If you have any questions or cerants concerning this schedule or any other tatter, please do not hesitate to call nn.
Best regards, Benjamin H. Vcqlor Assistant Chief Antitrust Counsel for HRC Sta eo cc: Bill Hughes M~9~T
~
Distribution:
v 1' s -b
-Q fdRC Central Files A.Toalston DIRCPDR M. Messier LLPDR ELD Reading file JRutberg g n+;,--
,_ T BVogler ELD A/T Formal file nn o
Eh onic a e.
BHVogler:bd
_JRuNerg 3/25/75 3L25/75
~
Form AEC.5ts (Rev. 9 55) AECM 0240 6*o C*s se e s 4es.: sas ae4 80021910 3 & /7