ML19319C527

From kanterella
Jump to navigation Jump to search
Forwards Site Analysis Branch Positions Re Seismology
ML19319C527
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/18/1974
From: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
To: Moore V
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8002190957
Download: ML19319C527 (2)


Text

.

. _. _ ~.

\\-

3 e

'{

i, M

'c-fg 1B DISTRIBUTION g eket File 50-346 L:Rdg Docket.W. 50-346 L:AD/SS L:SAB V. A. ! bore, Assistant Director for LWRs, Group 2, L SEISNOLOGY POSITIONS PLANT NAME: Davis-Besse Nuclear Power Station Unit 1 LICE 3SIEG STAGE: OL DOCKET hT1fLE.R: 30-346 RESPONSIBLE BRANCH: LWR 2-3 REQUESTED COMPLETION DAIE: October 31, 1974 APPLICANTS RESPONSE DATE NECESSARY FOR NEXT ACTION PLANNED ON PROJECT: None DESCRIPTION OF RESPONSE: MA REVILW STATUS: Site Acalysis 3 ranch (Seis= ology) - Prepafing SER Enclosed for your transmittal to the applicant are the scisrology positions for the Davis-Besse sita. The positions were prepared by S. !!. Coplan of the Site Analysis Sranch.

Harold R. 'Denton, Assistant Director for Site Safety Directorate of Licensing

Enclosure:

As stated cc: w/o enclosure D

D A. Gianbusso WW 1-W. Mcdonald 4,

-l J. Panzarella D

A A

l"Ll J

a cc: w/ enclosure l

S. uanauer F. Schroeder SS 3 ranch Chiefs

'p A. Kenneke I. Peltier i

l S. Coplan l

A. Cardone i

L:SAB jf.

LyS4 L:AD/SS e,,,..,

SMCoplan:jat [Mhp I

WPG 11 HRDenton

.,,,,.m.,

11/14/74

/11/ft(/74 11//f/74 11/ /74 Pass AE318 (Ber.>35) ABCM 0240

  • u. e.oovenmuant emunne orricus sove. sea.see818dD 8 8

e -

k SEISMOLOGY POSITIONS DAVIS-BESSE NUCLEAR POWE2 STATION IRIIT 1 DOCKET NO. 50-346 323.1 (RSP)

The staff accepts the proposad SSE, which uses a value (2.5.2) of 0.153 as the zero period limit of the design response spectra input at the foundations of Category I structures.

e, Y S.

e 6

'D G 1 0 1

V

@ 'D n g ri

. rf, _

b' Jb.;

6 4 -