' l() -}
s.
DISTRIBUTION OF MEETING
SUMMARY
-*3 DATED The Toledo Edison Company Detroit Edison Company Aten:
Mr. Lowell E. Roe Attn:
Mr. Arthur B. Harris Vice President, Facilities Project Manager Development 2000 Second Avenue 300 Edison Plaza Detroit, Michigan 48226 Tol2do, Ohio 43652 Docket Files f__
SVarga LKitner AEC PDR DEisenhut JMerino LPDR FSchroeder R0verstreet L Reading (M. Groff)
RMaccary IPeltier LWR 2-3 Reading File HDenton CStaley VAMoore RTedesco RCDeYoung VStello DMuller JKnight KGoller SPawlicki DSkovholt LShao RDenise BGrimes JStolz WGamill KXniel MSpangler ASchwencer JKastner DVassallo RBa11ard OParr CLong WButler GLainas BYoungblood VBenaroya WRegan TNovak GDicher TIppolito GKnighton Dross Clear OCC RPurple R0 (3)
DZicmann RS (3)
PCollins EGoulbourna WHouston ACRS (16)
RVollmer RBenedict RIreland RCodell RClark LEngle MFliegel EHawkins LHulman TJohnson 1
n i
,/
8002190 ff/
"T
CEC 34'G Decket Noe.: 50-341 54-346 50-500 50-501 AFFIICANTS:
DETROIT EDISON AND TOLEDO EDISON FACILITUS:
FE2XI II, AND DAVIS 3 ESSE 1, 2 AND 3 SCHMARY OF MEETING HELD DECEMBER 11, 1974 AT DETESDA, MARYLAND VIE DETROIT EDISON AND TOLEDO EDISON ID CONSIDER WINDWAVE SET-UP DN I.LU, ERIK.
A neeting was Mid with the applicasts and their consultant for Lake Erie hydrology Desse and Moore, to didenes the Platzman wind set-up model as it applies to Lake Erie for the Davis 3 essa and Fermi II facilities. The agenda and attendance list for this meeting are attached as Inclosures 1 and 2.
Most df the time was spent in reviewing the history of the staff's rsview and previous involvement in the developnent of Lake Eric hydrology models.
It was noted that the Ferm1 II wind set-up report is more current than the Davis 3 essa 1 report. In addition, the Davis 3 esse 1 report h.t.s some obvious arrors. As a result of the discussion, the staff will review the Fermi II report prior to formulating round two requests and/or positions on Davis Besse 1 and Toledo Idison will update the Davis 3 essa 1 report. For Fermi II, the staff Indicated that the probable navi== surge level estimated for Termi II was acceptable.
The applicant's consultant discussed their bases for determinint both the validity of historical data at selected stations and surr,e vahu at the facility sites and at Toledo, Ohio. The staff indicated they were particularly interested in obtaining updated and accurate data to validate the Platsman Model.
The staff indEcated they are primarily interested in IAke Erie water level predictions still being conservative in light of recant severe stora l
o,.e s.-
.u a. = +-
..n e-p.a..uc. sis inn. 9 5s) ABCM 02b W u. s. eovsanusar paremme orrecss i.u.sas.i.e l
2-Summary of Meeting history on Lake Erie. Toledo Edison and Dames and Moore will review lake level data avaitabla during recent storms to assure themselves and the staff that calculated levels are still conservative.
UNchd :1:ut ::f L. 3. Engle. Project Mana;;er Light Water Rasetors 3 ranch 2-3 Directorate of Licensing Inclosures (2):
Agenda and Attendance List I
j
$h1 W & @LJ}u (q I'1 X[8M[
- ),
orrica e LEngla:rm.
s u,... s.
oavs e foran AEC.)is (Rev. 9 53) ARCM 0240 2 u. e, sovsawusar raismas opwico sev4.see ses
ENCLOSURE 1
~-s' LAKE ERIE UIND TIDES
~'
DECEMBER 19, 1974 MEETING AGEtIDA
- 1. Discuan the conearvatism of the' shear stress k values used, and the sensitivity of the surge estimates to these values.
- 2. Discuss the validity and/or conservatism of the.tuo foot correction of calculated wind setup values as portrayed on plate 9 of appendix 20.
Discuss bases for assuming curve is a straight line of the slope shown.
- 3. Discuss the ranifications of previously (1970) computed values of 16.9 and 21.2 feet of wind set-up at Toledo by the Platzman and TR-4 methods respectively. These computations were made for the Fermi II site.
- 4. Discuss results of other r.ethods and or models used to predict vind tido at Davis Besse or other Lake Erie sites and compare with Plat =an.
- 3. Discuss the ramifications of calibrating the Pintvman model' for maximus historic event and then ucing the calibrated ~~da'
' e predict the maximum wind tide at Davis Besse due to a PEE.
- 6. Discuss the conservatism of the predicted maximun dynamic vater level at Davis Besse, with regard to the duplication of uind tide error in the maximum uave height, since this uave height is based on the maximum supportable wave due tu the maximum static water level.
i
- 7. Aplihrently approximately tuo feet of transverse seiche was used in the model verifications runs, whereas only one foot is assumed for the saaximum static water level at the Davis Besse site. Some explanation should be provided for this apparent descrepancy.
S. Discuss the validity of historical data at selected stations.
- 9. Discuss the validity of historical surge values at sites and at Toledo.
cm em D J g
D e, 3,1L
~ c0 T
~
o i
0.S_1.3 _a -
a I
9 e
- b
.m ENCLOSURE 2 MEETING: STAFF, TOLEDO EDISON, DETROIT EDISON, AND DAMES AND MOORE Attendance List December 19, 1974 DAMES AND MOORE:
R. Noble t
DETROIT EDISON COMPANY:
P. Cook TOLEDO EDISON COMPANY:
F. Miller E. Novak J. Wood AEC:
R. Benedice.
R. Codell L. Engle M. Fliegel E. Hawkins L. Hulman T. Johnson L. Kitner J. Marino R. Overstrect I. Peltier.
G. Staley 0
l $1 uww Ri W L) w r rpSal Ag n