ML19319C511
| ML19319C511 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 02/20/1975 |
| From: | Harold Denton Office of Nuclear Reactor Regulation |
| To: | Muller D US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 8002190944 | |
| Download: ML19319C511 (1) | |
Text
-
~
FEB '2 0 T5 Daniel R. Muller, Assistant Director for Environmental Projects, L HYDROLOGIC ENGINEERI!iG IriPUT TO DES P L A rt T fl A M E :
Davis-Besse, Unit 1 LICEllSING STAGE:
OL DOCKET NUMBER:
50-346 RESPONSIBLE BRAiiCH:
EP-1 REQUESTED C0!!PLETION DATE:
Ja nua ry 31, 1975 APPLICA!iTS RESP 0!ISE DATE NECESSARY FOR NEXT ACTION PLAiitlE0 ON PROJECT:
ilot Applicable DESCRIPTI0ti 0F RESPONSE:
ilone REVIEW STATUS:
Hydrologic Engineering Section, SAB - Complete There has been no significant changes in the site or plant design, with respect to hydrolegic engineering data and dis-cussions since tne FES for construction.
The hydrologic en-gineering material containad in the construction FES will be acceptable for use in the FES for Operation.
lia old R. Denton, Assis' ant Director for Site Safety Division of Technical Review Office of iluclear Reactor Regulation cc:
A. Giambusso W. PicDonald J. Panzarella S. Hanauer F. Schroeder H.
R.
Denton SS Branch Chiefs A. Kenneko G. Knighton N 'p '
H. Thompson
- 3. Staley Distribution:
L :C e n t ra.1 File L:RDG L:SAB lIf,.,E TR/W TR:SAj, T RSS A.B.
TI):yy, g
o,ri.s,
GSTALE.YJjoc GH'u)5aN WPfipr!Fli11 l;JfRuenton 2/11/75 2/ /3 /75 2//f/75 2//f/75 f
Foran ABC Ste (Rev. 9 55) MCM 0240 W u. s. oovsanassar painetime orrica sera.sae. nee 800!)1go77f
[
l