Summary of NRC 771013 Meeting W/Util,Bechtel Corp & Fire Protection Consultants Re Licensee Response to App a of Branch Technical Position 9.5-1,Revision 2, Fire Protection Sys, Including Fire Hazards Rept
ML19319C462
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/17/1977
From: Engle L, Hannon J
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8002140847
Download: ML19319C462 (4)


Text

. -.....

  • g

.9 NOV 1'i 1977 DOCKET li0. 50-346 LICEISEE: TOLEDO EDIS0N C0l!PANY FACILITY: DAVIS-BESSE NOCLEAR PO!!ER STATION, UNIT !!0.1 SU:'JMRY OF MEETING ON FIRE PROTECTION - DAVIS-BESSE, UNIT NO.1 (08-1)

Cn October 13, 1977 representatives from the Toledo Edison Company, the Bechtel Corporation and their fire protection consultants met with the NRC Staff to discuss the licensee's submittal in response to Appendix A of dranch Technical Position 9.5-1, Revision 2, " Fire Protection Syste=, including the Fire Hazards Report for DB-1. A list of attendees is attached.

The Staff gave examples where sufficient infor::ation appeared to be lacking in the February 11, 1977 sulnittal to enable an effective review Ly NRC fncconsultants.

The Toledo Edison Ccepany requested another meeting to be held in approxi-cately three (3) weeks to discuss their plans for increasing the level of fire protection in the DB-1 cable screading room. The Staff agreed to this teeting, pending selection of a convenient date.

The licensee anticipates subnittal of an augmented response addressing the concerns identified by the Staff by the latter part of November,1977.

O winal Signed by' G 'g/<_

Original Signed hg M

Lcon Engle, Project Manager J. N. Hannon, Project Manager 1

Light Water Reacters Branch No.1 Operating Reactors Branch No. 3 Division of Project' Management Division of Operating Reactors

.$ Y

~\\

DM M Oh3 ORB #3 _.

DPM:L'pR #1 NDOR [ hDOR 7 J

or ric a,.

JStol'h

_. _../...r f../...7 7 11/B/..77. _... 11/../..]./_77.. _......

[KGo'Y LEnh JHaMon Glear dei

' hut ll

/A 17/ //

ll/j./77 u

._4,

on,e p.

NBC PORM 313 (9 76) NRCM 0240_

  • ua s. eovanna.swv reinvine orricas eve.em s o o2 ao J77 F

. cc: Toledo Edison Company ATTN:

Mr. Lowell E. Roe Vice President, Facilities Development Edison Plaza 300 Madison Avenue Toledo, Ohio 43652 Mr. Donald H. Hauser, Esq.

The Cleveland Electric Illuminating Comcany P. O. Box 5000 Cleveland, Ohio 44101 Gerald Charnoff, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.

Washington, D. C.

20036 Leslie Henry, Esq.

Fuller, Seney, Henry and Hodge 300 Madison Avenue Toledo, Ohio 43604 l

I

  • m ATTENDANCE LIST FOR l1EETIflG HELD CN CCTOBER 13, 1977 WITH THE TOLEDO EDISOff COMPAtiY DAVIS-2 ESSE. UNIT NO. 1 COCKET "O. 50-346

!!UCLEAR REGULATORY COP 1tISSION MM PROTECTIO?i CONSULTA?tTS, E hen #oya (Part tine)

J. Robinson L. Engle R. !Ieiss J. Hannon D. Ilotley V. Laung BECHTEL CORPCRATICN P. Mattheus P. Anas R. Angus TOLE 00 EDISCi! CCI'PANY R. Salcwin S. Canter J. Buck J. Fay M. Calcacuggio R. Hess R. Chesko R. Jackson C. Oc'Tck P. "adden G. Eichenauer C. !1111er W. Green E. Roy L. Paich J. Secni J. Lenardson E. Smith E. Novak J. Smith L. Roe j

r orwic s >

eunmaus >

D ATs >

NRC FORM Jt8 (9 76),NRCM 0240

. W us s.eovenssusser possarine opricas eeve-ees.en3

i a

MEETING

SUMMARY

4 dcketFile NRC PDR 4

Local PDR TIC s.

NRR Reading LWR-#1 File E. Case R. Boyd R. DeYoung D. Vassallo J. Stolz K. Kniel

0. Parr S. Varga L. Crocker D. Crutchfield F. Williams R. Mattson 5

H. Denton i

D. Muller l

Project Manager: Leon Engle, J. N. Hannon Attorney, ELD E. Hylton IE ( 3)

ACRS (16)

L. Dreher NRC

Participants:

D. Notley V. Leung P. Matthews V. Benaroya i

4 4

1 i

j e.

m.

t =e

., ~ - - _ ~,

-7.,

q

._...,,,.-s

_,., _. -. -...