ML19319C416

From kanterella
Jump to navigation Jump to search
Forwards for Consideration G Fiorelli 780505 Memo Re Recommendations for Reconducting Completed Power Ascension Tests Due to Changes in Core Caused by Removal of Burnable Poison Rod Assemblies
ML19319C416
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/31/1978
From: Woodruff R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML19319C417 List:
References
NUDOCS 8002140797
Download: ML19319C416 (1)


Text

~

.a f,iy)M' c

}mt 0 D.

MAY 31 1978 f',..fe, 50 MENORANDUM FOR:

D. 8. Vassallo, Assistant Director for Light Uater Reactors, NRR FTCM:

R. W. Woodruff, Acting Assistant Director for Technical Progrars, IE SL'BJECT:

MODIFICATI0tl 0F POWER ASCEKSION TESTING AT CAVIS-BESSE 1 DUE TO THE REMOVAL OF POIS0H RCDS The enclosed memorandum fra the Region III office recoetends that certain of the completed Dower ascension tests at Davis-Ecsse 1 be reconducted due to the changes in the core that will be caused by the removal of the burnable poison rod assen:blics. Also enclosed is the list of test items which they believe should be considered for retesting. As we understand that this aspect of the core modf-fication is already under review by fiRR. the enclosed caterial is being transmitted for your consideration.

Roger W. 'doodruff Acting Assistant Director Division of Reacter Operations Inspection

Enclosure:

Hemo G. Fiorelli to K. Y. Seyfrit dtd 5/5/78 DISTRIBUTION cc: w/ encl.

Decket Files (2) it. C. Moseley, IE IE Files J. F. Stolz. NRR DCKirkpatrick Rdg Files L. B. Engle, NRR TP Rdg Files 4:. C, t ROI Rdg Files w/o encl.

/

G. Fiorelli, RIII o=nc= GOUTACT:

D. C. Kirknatrick. "P IE:TP IE:TP:AAD E Kirkcatric s:mkm RWWoodruff

-77s410162-.

= = = = = *

.__5/31118 5/_ /84_

~ ~ [~~~ ~~~~

oaa

  • ac roxx 3:s o 6> ncx ono
  • u =======v

-' = o ac = im - a-aa

^

8o02140 ?

l