ML19319C260

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Repts of Preoperational Environ Monitoring Programs
ML19319C260
Person / Time
Site: Davis Besse 
Issue date: 03/16/1977
From: Roe L
TOLEDO EDISON CO.
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML19319C261 List:
References
231, NUDOCS 8002110724
Download: ML19319C260 (1)


Text

_ _ _ _

l t

TOLEDO EDISON Docket No. 50-346 LOWELL E. RCE v.c. w..a.-t seen.t.es Ceve osa ent March 16, 1977

<4ia>

= s as

% D"HD Serial No. 231

@/

-U j'~,,Gi'f(;lls-E

{S

'. i *

-\\

0p4g w

3, Director of Nuclear Regulation C4 e

N Q *,6 7*r,, g,

  • Atta: Mr. George W. Knighton, Chief

/

o Environ = ental Proj ects 3 ranch No. l q,

(.

United States Nuclear Regulatory Co=sission

($

I Washington, D.C.

20555

/

Dear Mr. Knighton:

Under separate cover, we are transmitting twenty-five (25) copies of our p

sixth Semi-Annual Report of our Pre-Ocerational Environmental Monitoring f

Prograss for the Davis-Besse Nuclear Pows: Station Unit No. 1.

This report is for the period July 1, 1976 to December 31, 1976.

During this period, activities continued to be directed towards obtain-ing aquatic, radiological, and terrestrial baseline data documenting natural fluctuations in the environment. This report, Volu=e VI, and

[g' the previous reports, Volumes I through V, provides three full years of Pre-Operaticnal Environmental Monitoring.

i The data collected for this period are consistent with previous data l

collected and do not indicate any unusual conditions for Western Lake Erie.

]

Yours very truly, i

1 be b/6 L-TdIS DOCUMENT CONTAINS POOR QUALITY PAGES l

A 8002 110 Q THE TCLEOO EOISON COMPANY EOISON PLAZA 300 MADISCN AVENUE TOLEDO CHIO 43552 l

_.