Responds to NRC Re Equipment Failures During Degraded Grid Voltage Condition at Millstone 2,supplementing 761103 Response Re Degraded Grid Voltage at Davis-Besse
ML19319C225
Person / Time
Site: Millstone, Davis Besse  Dominion icon.png
Issue date: 12/21/1976
From: Roe L
TOLEDO EDISON CO.
To:
Office of Nuclear Reactor Regulation
References
175, NUDOCS 8002060789
Download: ML19319C225 (4)


Text

_.

NRCFoRM 195 UA NUCLEAR REcuLAToRY COMMISSION DOCKET NUM BE R 50-346 in 7e>

'"""I'"

NR,0 DISTRIBUTION FoR PART 50 DOCKET MATERIAL

'O:

i FROM:

DATE OF DCCUMENT Toledo Edison Compsny 12/21/76 Mr. John F. Stolz Toledo, Ohio DATE. R E CEIV E D Mr. Lowell E. Roe 12/27/76 WLETTE R ONOToRIZED PROP INPUT FORM NUMBER OF CCPIES RECEtVED SoRiolN AL

%UNC LASSIFIE D b-OCoPy One signed DEScalPTION ENCLOSU R E phh AcGOT Ltr. re our 10/1/76 ltr. and their 11/3/76 ltr....concerning degraded grid voltage Condition.

@p.}.*5QT F I@[3 Z

a (2-P)

PLANT NAME:

Davis-Besse SAFETY FOR ACTION /INFORMATION vmrTon 12/29/76 RJL ASSIGNED AD:

AR9TNMRn An*

XBRANCH CHTEFt Stolz

[g)

RPANrm rmTvv.

YPROJECT MANAGER; Engle PROJECT MANAGER:

l MLIC. ASST. :

Hylton LIC. ASST. :

i l

LN INTERNAL OlSTRIBUTICN i

MN FILE "

SYSTEMS SAFETY PLANT SYS M S SITE SAFETY &

MNRC PDR HEINEMAN TEDESCO ENVIRO ANALYSTS YI&E

/A)

SCHROEDER BENAROYA DENTON & MIT TIR X OELD T.ATNAR MGOSSICK & STAFF ENGINEERING M

IPPOLITO ENVIRO TECH.

I MIPC MACARRY ltTRICIDOD ERNST i

CASE KNIGHT BALLARD i

HANAUER SIHWEIL i OPERATING REACTORS SPANGLER i

HARLESS PAULICKI STELLO i

SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

CAMMILL BOYD ROSS X

EISENHUr STEPP P. COLLINS NOVAK V

SHA0 HULMAN HOUSTON ROSZTOCZY Y

BAER PETERSON CHECK V

BITrLER [3]

SITE ANALYSIS MELTZ V CRIMES VOLLMER HELTEMES AT & I BUNCH t

SKOVHOLT SALTZMAN X J. COLLINS RUTBERG KREGER EXTERNAL DISTRIBUTION CONTROL NUMBER MlPDR: Pt. Clinton. Ohio NAT. LAB:

BROOKHAVEN NAT. TAM.

XTIC:

REG V.IE ULRIKSON (ORNL)

YNSIC:

LA PDR g7 M r,g "

'ASLB:.

CONSULTA!frS: s /

/

/.

X)CRS /d> CYS 45GisH NG/BE>T.* /# #. //>/19 /2C}

Q l

4 t

< p

/

N7.c poRM ins (2 7e gozoeo787 4-

y TOLEDO EDISON

..q'WW

\\

El gCy '

LOWELL E. ROE December 21, 1976

  • * **"* at

\\

3 d

Fecmt.es Devescoment Ept' dh 14191 259-5242 Serial No. 175 2h

.if /

.a gu Docket No. 50-346 f

J$'

'i

/'b.

,7

~*

Mr. John F. Stolz b' !) ~

Chief Light Water Reactors Branch No. 1 :31 vision of Project Management United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stolz:

Your letter to us dated October 1, 1976, described equipment failures during a degraded grid voltage condition at Millstone, Unit 2.

Our letter to you dated November 3, 1976, partially gave the results of an investigation of degraded grid voltage at Davis-Besse No. 1.

We are now transmitting the remainder of our response.

Item 4 i

Provide a description of any proposed actions or modifications to your facility based on the results of the analyses performed in response to Items 1-3 above.

Response

The following modifications are to be made to the facility based on the results of the analyses performed in reponse to Items 1-3:

1.0 The existing setting of 59*.' of rated bus voltage given in response to Item Ic will be lowered to a 30% setting with a time delay of 1/2 second.

2.

Additional undervoltage relays will be added with a setting of 70% in a 1 second time delay.

3.

Additional undervoltage relays will be added with a setting of 90% in a 10 second time delay.

T 8 ;.D THE TCLECO ECISCN COMPANY ECISCN PLAZA 300 MACISCN AVENUE TOLEDO. CHIO 43652

i

.s These modifications are made to protect against degraded grid voltage conditions such as those which occurred at Millstone, Unit 2.

Very truly yours, dh a/12

)

i i

4 1

1 4

i J,

4 A

i E

t i

s i

e i

a I

DISTRIBUTION FOR FIRE PROTECTION EVALUATION LETTERS DEC 17 1976 DATED:

roup 1 Docket File (See Docket Nos. 50-368, Arkansas 2; and 50-477, Atlantic for enclosures)

NRC PDR Local PDR Branch File Branch Chief LPM LA Grouc 2 R. Boyd R. DeYoung L. Crocker D. Vassal 1o F. Wil1iams H. Smith J. Miller R. Heineman R. Tedesco V. Benaroya T. Ippolito EID I&E (7)

K. Goller A. Rosenthal, ASLAB J. Yore, ASLSP bec: NSIC TIC ACRS (16)