Discusses Resolution of Outstanding Safety Evaluation Items Re Habitability Sys
ML19319C207
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/27/1976
From: Bunch D
Office of Nuclear Reactor Regulation
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8002060692
Download: ML19319C207 (2)


Text

-- __

d OwXw{rvh OEC 2 7 1976 Docket Lio.30-346 22iORAIDCM FOR:

J. F. Stolz, Chief, Light "a'ater Reactors 3 ranch No.1, DFli FROM:

D. F. Bunch, Chief, Accident Analysis Branch, DS2

SUBJECT:

RESOLUTION OF OUTSTXIDING SER ITEMS INVOLVING ILGITABILITY SYSTEMS PLA.iT NXE: Davis Besse Unit do. 1 LIC 'ISI2;G STAGZ: OL DOCKET EMBER: 30-346 MILZST0JE liUMBER: N/A RESP 0dSI3LE 32A.iCli: LWR No.1; L. Engla, LPH R; QUESTED COMPLETION DAIE: N/A ROVI G STATUS: dabitability Review Complete SAR Amend:acnt. o. 23 has responded to the remaining outstanding items sentioned in our semo to you of September 24, 1976 (see Ite.cs 3 and 4).

l Item 3 involved the quastica of control room pressure tasting. The applicant has modified the centrol room ventilation system by increasing the acount of caka-up air during energ2ncies from 200 to 300 cfm. Tais sake-up is greater than 0.25 volume cranges per hour and, therefore, periodic verification testing of control room pressurization is not required as per Section 6.4, p. 6.4-8 of the Standard Review Plan.

However, we will requirn periodic varih cation of the 300 cfm make-up flow.

The applicant has cot::nitted to an acceptance test that will de:nonstrate the capability of tne system to maintain a rainimum of 1/8-inch water gauge positive pressure differential across the control room pressure boundary using a pressurisation flow rate of 300 cfm.

The technical specifications will be changed. The requirement for periodic pressure testing of the control room vill be replaced by a requirement taat the make-up flow be periodically verified to be 300 cfm + 10%.

D.7 v C M4 orrec s >

su m mas.s

  • oats >

Ferns AEc.)ls (Rev. M a AECM 0240 W u. s. sovsamus=v rotatine orricas se74.ose.see 8002060872 g

o a

.c 2

J. F. Stolz DEC 2 1976 T

The increased calculated thyroid dose to the con rol room operator following a postulated LOCA as a result of the increased rmtke-up rate is still within our guidelinea and.s therefa a acceptable.

Item 4 involved the inadequate description of a control room door seal system. The amend::;ent has provided adequate information on this item.

The balance of the items (1, 2, 5 and 6) have been addressed in the September 24, 1976 r.aco as well as the Juna 3,1976 =cco from Vollmer to DcYoung re:;arding chlorine protection.

There remain no outstanding items regarding nabitability systems.

Cig :: -

n 7,.

%bicF.32nc,i D. F. Bunch, Chief Accident Analysis Branch Division of Site Safety and Envirorsontal Analysis cc:

S. Eanauer

11. Denten D. Muller F. Miraglia J. Miller L. Crocker Distribution:

R. hyd Central Files D. Vassallo NRR Rdg. File L. Engle DSE Rdg. File J. McGough AAB Rdg. File 1,

,,g

$11a AAB Files an SRP Files (6.4)

P. S.auttlemrth R. Vollmer D. Bunch G. Chipman K. Murthy 1