d OwXw{rvh OEC 2 7 1976 Docket Lio.30-346 22iORAIDCM FOR:
J. F. Stolz, Chief, Light "a'ater Reactors 3 ranch No.1, DFli FROM:
D. F. Bunch, Chief, Accident Analysis Branch, DS2
SUBJECT:
RESOLUTION OF OUTSTXIDING SER ITEMS INVOLVING ILGITABILITY SYSTEMS PLA.iT NXE: Davis Besse Unit do. 1 LIC 'ISI2;G STAGZ: OL DOCKET EMBER: 30-346 MILZST0JE liUMBER: N/A RESP 0dSI3LE 32A.iCli: LWR No.1; L. Engla, LPH R; QUESTED COMPLETION DAIE: N/A ROVI G STATUS: dabitability Review Complete SAR Amend:acnt. o. 23 has responded to the remaining outstanding items sentioned in our semo to you of September 24, 1976 (see Ite.cs 3 and 4).
l Item 3 involved the quastica of control room pressure tasting. The applicant has modified the centrol room ventilation system by increasing the acount of caka-up air during energ2ncies from 200 to 300 cfm. Tais sake-up is greater than 0.25 volume cranges per hour and, therefore, periodic verification testing of control room pressurization is not required as per Section 6.4, p. 6.4-8 of the Standard Review Plan.
However, we will requirn periodic varih cation of the 300 cfm make-up flow.
The applicant has cot::nitted to an acceptance test that will de:nonstrate the capability of tne system to maintain a rainimum of 1/8-inch water gauge positive pressure differential across the control room pressure boundary using a pressurisation flow rate of 300 cfm.
The technical specifications will be changed. The requirement for periodic pressure testing of the control room vill be replaced by a requirement taat the make-up flow be periodically verified to be 300 cfm + 10%.
D.7 v C M4 orrec s >
su m mas.s
- oats >
Ferns AEc.)ls (Rev. M a AECM 0240 W u. s. sovsamus=v rotatine orricas se74.ose.see 8002060872 g
o a
.c 2
J. F. Stolz DEC 2 1976 T
The increased calculated thyroid dose to the con rol room operator following a postulated LOCA as a result of the increased rmtke-up rate is still within our guidelinea and.s therefa a acceptable.
Item 4 involved the inadequate description of a control room door seal system. The amend::;ent has provided adequate information on this item.
The balance of the items (1, 2, 5 and 6) have been addressed in the September 24, 1976 r.aco as well as the Juna 3,1976 =cco from Vollmer to DcYoung re:;arding chlorine protection.
There remain no outstanding items regarding nabitability systems.
Cig :: -
n 7,.
%bicF.32nc,i D. F. Bunch, Chief Accident Analysis Branch Division of Site Safety and Envirorsontal Analysis cc:
S. Eanauer
- 11. Denten D. Muller F. Miraglia J. Miller L. Crocker Distribution:
R. hyd Central Files D. Vassallo NRR Rdg. File L. Engle DSE Rdg. File J. McGough AAB Rdg. File 1,
,,g
$11a AAB Files an SRP Files (6.4)
P. S.auttlemrth R. Vollmer D. Bunch G. Chipman K. Murthy 1
' kSE:[
DSE-DSE:AAB M.Chipman D 6jit x27917 K.
- r G
_ f -j.3 -16 12-Q-76
- -76 onve >
Foran E314 (b. 9.$3) AECM 0240
- u. s. eavsnnusar pointino orrican sota.eae.ise