ML19319C163

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 999-030/72-01 on 720613-15.No Noncompliance Noted.Monthly Rept for Jul 1972 Encl
ML19319C163
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/12/1972
From: Vetter W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Henderson J
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C164 List:
References
REF-QA-99900030 NUDOCS 8001310522
Download: ML19319C163 (2)


Text

__

m UNITED STATES

- '.J ATOMIC ENERGY COMMISSION OIRECTORATE OF REGULATORY OPERATIONS e,

REGION til

    1. 4its 0%

799 ROOSEVELT ROAD TELIPHONE GLEN ELLYN. ILLINOIS 6o137 (312) 858-2660 July 12, 1972 J. B. Henderson, Chief, Reactor Construction Branch Directorate of Regulatory Operations, Headquarters VENDOR INSPECTION REPORT BYRON-JACKSON, LOS ANGELES, CALIFORNIA REACTOR PRIMARY COOLANT PUMPS FOR TOLEDO EDISON COMPANY - DAVIS-BESSE DOCKET NO. 50-346 The attached report of a routine vendor inspection at the subject manufacturer's plant on June 13 - 15, 1972, is transmitted for information. No items of noncompliance or nonconformance were encountered during the inspection.

W. E. Vetter, Chief Reactor Construction Branch i

A ttachment :

RO Rpt No. 999-030/72-01 by R. E. Oller cc:

R. B. Minogue, RS (3)

R. S. Boyd, L (2)

R. C. DeYoung, L (2)

D. J. Skovholt, L (3)

H. R. Denton, L (2)

R. H. Engelken, RO H. D. Thornburg, RO G. W. Reinmuth, R0 RO Files DR Central Files i

l I

8001310 f M 9

l

Dine:CTORATE OF BEGULATORY OPERATION MONTHLY REPORT JULY 1972 i

t 4

l l

l 1

I i

1 4

i l

l Byron-Jackson Comoany, Los Angeles, California - An inspection of the B-J plant was performed on June 13-15 concerning the i

manufacture of reactor coolant pumps for the Davis-Besse facil-ity.

No deficiencies were identified during the inspection.

1 I

l l

I I

i e

7

/

-..----n--------..r

-.-,-.----v--~,-,---------r,..---.n,_

,n _...evne -

w- -

-aw,

-.