ML19319C131

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Hpis Pump Motor Starting Torque. Motors Returned to Westinghouse for Test & Repair.Definitive Rept Re Deficiency,Safety Implication Analysis & Corrective Actions Will Be Submitted Upon Completion of Study
ML19319C131
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/07/1974
From: Roe L
TOLEDO EDISON CO.
To:
Shared Package
ML19319C120 List:
References
NUDOCS 8001310490
Download: ML19319C131 (1)


Text

_ _ - . _ _ _ - _ _

O (m)

(_/ TGLEDo

%mus EDISON Lo.utt E. Act

u. p ...c.m. pm.,

I4191 259-5242 June 7,1974 Docket No. 50-346 Dr. Um aald F. Knuth, Director Directorate of Regulatory Operations Office of Regulation U. S. Atomic Energy Commission Washington, D. C. 20245

Dear Dr. Knuth:

This letter is submitted as an Interim Report n:gardmg the Davis-Besse Nuclear Power Station Unit No. I high pressure injection pump motor starting torque deficiency related by telecon to Mr. W. E. Vetter, Directorate of Regulatory Operations, Region 111 on

[m April 25,1974.

The above motors have been returned to Westinghouse for test and repair e.s may be necessary. Initial tests have been performed and limited repair work initiated. A definitive report of the deficiency, analysis of the safety implications. and the corrective action being taken will be submitted to your office in accord with 10CFR Part 50.55 upon completion of our study of this problem.

Yours very truly, cc:

J. G. Keppler, Regional Din:ctor Director of Regulatory Operations Region 111 i

i h

l \j l

l l

THE TOLEDO EDISCN COMPANY EDISON PLAZA 300 MADISCN AVENUE TOLEDO. CH!O 43552 8001310fN