Confirms 751110 Telcon W/Nrc Changing Sceduled Dates for Functional Testing from 751215 to 760315 & Fuel Loading from 760401 to 760615.Commercial Operation Remains at Sept 1976
ML19319C112
Person / Time
Site: Davis Besse 
Issue date: 11/25/1975
From: Roe L
TOLEDO EDISON CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8001310474
Download: ML19319C112 (2)


Text

.

NRC DISTRIBUTION FOR PART 50 DOCKET MATERI AL

  • (TEMPOR ARY FORM)

CONTROL NO:

a FILE:

FROM: Toledo Edison Co.

DATE OF DOC DATE REC'D LTR TWX RPT OTHER fl.

11-25-75 11-29-75 XX TO:

ORIG CC OTHER SENT !sT.C PD R XX Mr. A. Schwencer 1 si:;ned SENT LOCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:

XXX 1

50-346 DESCRIPTION: Ltr furnishing scheduling changesENCLOSURES:

to Davis-Besse Unit 1 Pla nt....

.,, t~ Wf'

~r

,^

  • - 25 4.,; -

a

..a PLANT NAME: Davis-Besse Unit 1 FOR ACTION!!NFC RMATION DHL 12-3-75 CUTLER (L)

NCHj"'ENCER (L) ZlEMANN (L)

R EG AN (E)

RT.ID(L)

W/ Copies Wg (pies W/ Copics W/ Copies W/ COPICS STOL L)

DICKER (E)

LEAR (L)

CLARK (L)

W/ Copies W/ Copies W/ Copics W/ Copics PAR R (L)

VASSALLO (L)

KNIGHTON (E) spigs W/ Copies W/ Cooies W/ Copies W Ccoies KNIEL (L)

PURPLE (L)

YOUNGELCOD (E)

FM E 4 4 4.e W/ Copics W/ Copics W/ Copies W/fLopes INTERNAL DISTRIBUTION GE' G F t Q TECH REVIEW DENTON LIC ASST A/T IND.

Wo w r u n SCHROEDER GRIMES R. OlGGS (L)

B R AITM AN OGC. ROOM P-5GGA MACCARY GAMMILL H. GE ARIN (L)

SA LTZM AN GOSSICK/ST A F F KNIGHT KASTNER g GOULBOURNE (L)

M E LTZ CASE PAWLICKl.

BALLARD P. KREUTZER (E)

GI AM BUSSO SHAO SP ANG LE R J. LEE (L)

P' ANS MOYD STELLO M.nU : Rock (L)

MCDONALD t/iCO R E (L)

HOUSTON ENVIRO S. REED (E)

CHAPMAN DEYOUNG (L)

NOVAK MULLER M. SERV!CE (L)

DUBE (Ltr)

SKOVHOLT (L)

ROSS DICKER S. SHEPP ARD (L)

E. COUPE GOLLE R (L) (Ltr)

IPPO LITO KNIGHTON M. SLATER (E)

PETERSON P. CO LL!NS TEDESCO YOUNGSLOOD H. SMITH (L)

HARTFIELD (2)

DENISE J.CCLLINS REGAN S. TEETS (L)

KLECKER 9EG OPR LAIN AS PROJECT LDR G. WILLI AMS (E)

EISENHUT dlLE & REGICN (2)

BENAROYA

_H ARESS R. INGR 1 (L)

V. WILSON (L)

WIGGINTCN 111PC VOLLMER M. DUNCAN (a EXTtnNAL DISTRIBUTION 4/i - LOCAL POR nr~ "'nton, Chto

?

1 - TIC (ACERN ATHY) (1)(2)(10) - N ATIONAL LABS 1 - POR SAN /LA/NY 1 - NSIC (BUCHANAN) 1 - W. PENNINGTCN. Rm E 201 GT 1 - BROOKHAVEN NAT LAB 1-ASLB 1 - CONSULTANTS 1 - G. ULRIKSON ORNL 1 - Newton Anderson NEWM ARK /BLUME/AGB ASI AN

-- ACRS HOLDING /SENT b

8001alo979r

e I s.s

~-.

e N

mew ct 4p EDISON hk LOWELL E. RCE Docket No. 50-346 g

n. %....,.

..e..

., c. oo-..

p November 25, 1975 Q3

,g

,,,,,n,.u, s-sr

,y tc

,irt,,.

, ' ~ ',, ~ ~

Mr. A.

Schwencer, Chief ic.

Light Water Reactors Branch 2-3 (I

V Division of Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Schwencer:

On November 10, 1975, Mr. E. C. Novak, Toledo Edison Davis-Besse Unit 1 Project Engineer, related by phone the following schedule changes to your Mr. L. Engle, Project >bnager:

Schedule Activity Previous Current Hot Functional Testing December 15, 1975 March 15, 1976 Fuel Loading April 1, 1976 June 15, 1976 Commercial Operation September, 1976 September, 1976 This letter confirms the above Davis-Besse Nuclear Power Station Unit I schedule changes.

These changes have also been reported to Region III representatives as part of the Construction Status Report (Yellow Book) update in October.

While no one dominant cause for the schedule delay can be identified, several factors have contributed to overall schedule lag:

1.

Design refinements continue to be necessary to fine tune systems' designs to regulatory design criteria interpretations and to resolve field impacts or resultant design iterations.

2.

Delivery of components, particularly valves, necesaary to finalize systems continue to be delayed.

3.

Field productivity lags due to rawork necessary to accomplish design refinements, and due to degree of quality assurance documentation necessary to meet NRC nuclear standards.