Responds to NRC Re Valve MUHV66B Yoke Failure. Final Rept Submittal Date Changed from 761119 to 761203
ML19319C032
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/16/1976
From: Roe L
TOLEDO EDISON CO.
To: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
154, NUDOCS 8001300762
Download: ML19319C032 (1)


Text

,

n

,w a/ /.

w-s.,'Dk TOLEDO

% EDISON LOWELL E. ROE v.c. pee...e.

Facahbes Devoiooment November 16, 1976 msi ass-s24e Serial No. 154 Docket No. 50-346 Mr. R. F. Heishman, Chief Reactor Construction and Engineering Support Branch Directorate of Regulatory Operations U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear :

  • . 'P!.shman:

This letter is in response to your's of November 11, 1976 regarding Davis-Besse Unit i valve MUHV66B yoke failure. As our Mr. Novak related by telecon with your Mr. Hayes on November 10, it is not the intention of our October 27, 1976 letter to close the yoke failure incident, but only to address the operator material deficiency of the listed valves, a condition separate from the yoke failure problem.

In accordance with our October 25, 1976 letter, Toledo Edison is still investi-gating the yoke failure incident, and had anticipated issuing a final report by November 19, 1976. Our investigation will not be concluded by the expected day. Our final report is now expected to be submitted by December 3, 1976.

We apologize for the confusion created by the two letters.

Yours very truly, i

cts Cc:

Mr. James G. Keppler Dr. Ernst Volgenau, Director Regional Director, Region III Office of Inspection and Enforcement Directorate of Regulatory Operations U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D. C. 20555 799 Roosevelt Road Glen Ellyn, Illinois 60137 l

N THE TOLEGO EDISON COMPANY EDISCN PLAZA 300 MADfSON AVENUE TOLEDO CHIO 43652 NOV 181976 80 0130 0 7Q