Requests Exemption to Tech Spec 4.3.2.1.1 Allowing Steam Generator Level Switches to Be Checked on Quarterly Basis Until Steam Generator Level Transmitters & Remote Bistables Operational
ML19319B962
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/17/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8001290696
Download: ML19319B962 (3)


Text

.

M popu 195 U.C. NUCLE AR REGULATORY CO"'AtSSION DCCKET NUM BE R (2 'o 50-346 NRC DIST.RIBUTION poR PART 50 DOCKET MATERIAL TO *.

s FROM:

DATE OF DOCUMENT Toledo Edison Company 2/17/77 Mr. John F. Stolz Toledo, Ohio oATE REqEivEo Lowell E. Roe 2/22/77 CLETTER O NOTCH 12E D PROP sNPUT FORM NUMBER oF COPIES RECEIVED JIORIGIN A L Ts)NC LASSIFIE D OCOPY One signed DESCRIPTION ENCLOSURE Ltr. identifying an exception which the applicant desires to take regarding the.

frequency of performing the Functional Check as presently required by tech specs, dealing with the steam generator level switches....

NOTE: Distribution as per Mr. Engle-3/9/77-ACKNOWLEDGED PLANT NAME:

(2-P)

DO NOT PtEMOVE Davis _3 esse SAFETY FOR ACTION /INFORMATION pm.rTu n 3/9/77 RJL U I ASSIGNED AD:

Assieven An*

[15?ANC!LClf1EF_e Stolz ngggen cuTyp i

l&O_JECl_ltilnGER:

L. Et,gle PROJECT MA>'AGER:

I

_J,JC. A S ST. :

LIC. ASST. :

l INTERNAL DISTRIBUTION h G FILE ~3 I

SYSTEMS SAFETY I I PLANT SYSTCMS SITE SAFETY &

HEINE_ MAN M TEDESCO ENVIRO A12 LYSIS k.o.w can yI&C SCHROEDER I

BEUMQYA DENTON & M'T T 77 I

OELD l.

IATNAM COSSICK & STAFF ENGINEERING X IPPOLITO (."2-)

El;V_IRO TECH.

i MIPC MACAJRY KIRKb' COD ERNST l

CASE BOSNAK BALLARD

_j HANAUER SIlf4EIL OPERATING REACTORS SPANGLER HARLESS PA'JLICKI STELLO SITE TECH.

PROJECT MANAGEFENT REACTOR SAFETY OPERATING TECH.

CAMMILL i

BOYD ROSS EISENHUT STEPP

! l P. COLLINS NOVAK SHA0 HULMAN i I HOUSTON ROSZT_CCZY BAER

_.I PETERSON CHECK BITN.ER SITE _ ANALYSIS MELTZ CRIPES VOLLMER g HELTEMES AT & I X

/#M BUNCH i

SKOVHOLT SALTZMAN M //fd M# #

J. COLLINS RUTBERG X j. #e Ar" KREGER EXTERNAL DISTRIBUTION CONTROL NUMBE R MLP_DR: Pt. Clinton. Ohio NAT_,_LABj BROOK'IAVEN MAT. fAR.

TIC:

REG V.IE ULRIKSON (ORNL1 NSIC:

1.4 PDR ASLB:

CONSULTANTS: _

e /

/.

X;ACRS/(yCYS 43GisM41G/ sENT : MM /f /S/9/Wl

)g-i Nac,oRM i.. <2 2.'

8 0012$0gy y

  • /

.i o

9 TOLEDO EDISON (i

LOWELL E. RCE u.,,....

cp

,-,s.-c......

TS$

A mes ess-sur J

ggy g

Docket No. 50-346 February 17, 1977 d

fag gGf]

Serial No. 219 7

45-s(' M.

y\\

',. '. ';. ; - 3 l

7'O

@,[.b y?h"c,t [

Director of Nuclear Reactor Regulation Attn:

Mr. John F. Stolz, Chief

.a.a.By$pyh Light Water Reactor Branch No. I

.O g

Division of Project Management M

Y-vi\\D "nited States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Stolz:

As discussed between Mr. Leon Engle, NRC Licensing Project Manager for Davis-Besse Unit 1, and Mr. E. C. Novak, Toledo Edison Company, General Superintendent, Power Engineering and Construction, this letter is to identify an exception which the Applicant desires to take regarding the f requency of performing the Functional Check as presently required by the Davis-Besse Technical Specification 4.3.2.1.1.

This Technical Specification deals with the steam generator level switchee which are part of the Steam and Feedwater Rupture Control System (SFRCS).

The 1971 edition of IEEE-279, Section 4.9, requires that the capability for sensor checks during reactor operation be provided.

Since the steam generator level switches do not have the capability for sensor checks during operation, these switches are being replaced with steam generator level transmitters and remotely installed bistables which are capable of sensor checks during operation, and are scheduled to be installed in June 1977. During the intarim period from fuel load until the steam generator level transmitters are installed, the Functional Check frequency of the steam generator level switches will be once every 90 days as indiceted on Page 7-38b(1) of the Davis-Besse Nuclear Power Station Unit 1 FSAR, Revision 24.

Davis-Besse Technical Specification 4.3.2.1.1 presently requires that the Functional Check of the steam generator level swf uches be performed on a monthly basis. Because of the location of these switches within the secondary shield wall within the containment vessel, this Technical Specification would require shutting down Davis-Besse Unit 1 on a monthly basis.

s. c S THE TCLEDO ECISON CCMPANY ED;SCN PLAZA 300 MACISCN AVENUE TCLECO, CHlO 43652

.e

, B'ecause of the historically low probability of failure of these switches, along with the redundancy provided in the system (more than one of these switches would have to fail to result in the system not performing its intended function), we believe that performance of the Funct.ional Check on a quarterly basis rather than a monthly basis during this interim period will not result in any undue safety risk. Therefore, we are requesting that an exemption to Technical Specification 4.3.2.1.1 be given to allow the steam generator level switches to be functionally checked on a quarterly basis until the steam generator level transmitters and remote bistables are operational.

Yours very truly, le cp b/4