Notifies That New Properly Qualified Flow Transmitters for Low & Hpis Flow Indication in Main Control Room Will Be Installed Shortly After Jul 1977 Per Revision 20 to FSAR
ML19319B938
Person / Time
Site: Davis Besse 
Issue date: 03/29/1977
From: Roe L
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
250, NUDOCS 8001290673
Download: ML19319B938 (1)


Text

NRJ PoHu'195

{

f U.C. NUCLEAR nEGULATOHY CO"4tSSION DOCKET NUMIF2

.- ] h (2 76)

" " """2'"

NRC DISTRIBUTION roR PART 50 DOCKET MATERI AL TO:

FROM:

CATE OF OOCUMENT

.foledo Edison Company 3/29/77 Toledo, Ohio o,7,,,c,,y g g Mr John F. Stolz Lowell E. Roe 4/1/77 METTE'i ONOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED XORIGINAL

[NC LASSIFIE D OCoPY

/

S_/ g DESCntPTION ENCLOSU RE Ltr. indicating that their vendor will not be able to supply the properly qualified flow transmitters until July, 1977........

. b..

c m"uNCIPREyoyg (1-P) 1 ACKNOWLEDGED, M NAME:

Davis-3 esse RJL SAFETY F_OR ACTION /INFORMATION pm7Tpn

/_ ASSIGNED AD:

VQ $ s a /[o AggTrNvn An.

/ JRMCH CHTEFr

_$fo[L RRANFH f'MT?v.

71ROJECT MANAGER:

M C /4 PROJECT MANAGER:

/ LIC. ASST. :

Hj/4oe LIC. ASST.

INTERNAL OISTRIBUTION ARG PM SYSTEMS SAFETY l

PLANT SYSTEMS SITE SAFETY &

/

iRG PDR HEINEMAN

/I TEDESCO ENVIRO ANALYSTS

/ I & E ("1,)

SCHROEDER

/

BENAROYA DENTON & MT T T TR I

/ OELD

' /

f_ATNAR MIPC MACARRY

'/

IPPOLITO EIMIRO TECH.

I GOSSICK & STAFF ENGINEERING I

KTRKWOOD ERNST CASE

/ BOSNAK i

BALLARD HANAUER

/' SIHWEIL OPERATING REACTORS YOUNGELOOD HARLESS

/

PAWL 7.CKI STELLO

/ (d o c SITE TECH.

PROJECT MANAGEMENT REACTOR SAFETY OPERATING TECH.

/ GAMMILL (~2.)

BOYD

/

ROSS EISENHUT STEPP

/ P. COLLINS

/.

NOVAK SEA 0 HULMAN

'/ HOUSTON

/

ROSZTOCZY BAER PETERSON

/

CHECK BITTLER SITE ANALYSIS JiELTZ CRIMES

/

VOLLMER

~

/HELTEMES AT & I

/

BUNCH SKOVHOLT SALTZMAN

/,J. COLLINS RUTBERG i

/ KREGER EXTERNAL DISTRIBUTION CONTROL NUMBE R

/],PDR: Pf-Llt n/ce,dM NAT. LAB:

BROOKHAVEN MAT. Y.AR _

/ TIC:

REG V.IE ULRIKSON (ORNL) 2]ISIC:

LA PDR NA Y ASLB:.

COtiSULTANTS:

7 7d 990/pf

/ ACRS /f CTS a vAnu/ SEPT WT WM y

NIc ecru ies (2.res

- ee.

.. ~.

Q

-l.

r

,.?,

n m

p R.

g ets.

s M4h 2 81977 Toledo Edison Company cc: Conald H. Hauser, Esa.

The Cleveland Electric Illuminating Con::any P. O. 83ox 5000 Cleveland, Chio 44101 Gerald Charnoff, Esq.

Shaw, Pittman, Potts and Tr nbridge 18C" '

.eet, N. W.

'la f -

D. C.

20036 Leslie 9 * -

sq.

Fuller, Seney, Henry and Hodge 300 Padisen Avenue Toledo, Ohio 43604

)

?

orrie s >

sunseases >

oavum Poem ABC 318 (Rev. M3) AEQ4 0240

  • u. s. sovsonnesar reintine orreess teve.ese. nee w.

~:~-

~

a s

a 6"

TOLEDJ EDISON LOWEu. E. Rod March 29,1977 v,c. p,..e.a.

et.o[,

s.com. c a..

{ 1%q. 7j;gl, Docket No. 50-346 mm ass-sur 4

Serial No. 250 h'/' > [)

Director of Nuclear Reactor Regulation j

Attention:

Mr. John F. Stolz, Chief Light Water Reactor Branch No. 1 Division of Project Management U. S. Nuclear Regulatory Commission jdh Washington, D. C. 20535

Dear Mr. Stolz:

On July 30, 1976, in Revision 20 to the Davis-Besse Nuclear Power Station Unit No. 1 FSAR, the Toledo Edison Company committed to make the low pressure injection and high pressure injection flow indication in the main control room an essential indication that will be seismically qualified and have essential power supplies.

Immediately thereafter, Toledo Edison ordered the necessary new flow transmitters, isolation devices and power supplies to make this change.

We have been recently notified by our vendo. that they will not be able to supply the properly qualified flow transmi:ters until July, 1977. We will install these new flow transmitters as soo.1 thereafter as is possible.

It is our plan that these flow transmitters can be installed while the unit is in operation and the low pressure injectiot. or the high pressure injection flow indication strings would only have to be out of service for a very short length of time (8 to 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />) while the final connections were made to the indicators on the main control board.

In the interim the existing non-seismically qualified metering will be left in service.

Yours very truly, i

su l

l l

l l

l THE TCLECO ECsSON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. CHIO 43652 770f94aw

...